ML19331E123
| ML19331E123 | |
| Person / Time | |
|---|---|
| Site: | Zion File:ZionSolutions icon.png |
| Issue date: | 08/08/1980 |
| From: | Varga S Office of Nuclear Reactor Regulation |
| To: | Peoples D COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML19331E124 | List: |
| References | |
| NUDOCS 8009050528 | |
| Download: ML19331E123 (2) | |
Text
e O
n aeog$'k a
UNITED STATES y
NUCLEAR REGULATORY COMMISSION 3
o WASHINGTON, D. C. 20555 j
c-
/
August 8,1980 Docket Nos. 50-295 50-304 Mr. D. Louis Peoples Director of Nuclear Licensing Commonwealth Edison Company Post Office Box 767 Chicago, Illinois 60690
Dear Mr. Peoples:
The Conmission has issued the enclosed Amendment No. 56 to Facility Operating License No. OPR-39 and Amendment No. 53 to FacG 'ty Operating License No. DPR-48 for the Zion Station, Unit Nos. I anri ? respectively.
The amendments consist of changes to the Technical Specincations in response to your application transmitted by letter dated F. arch 21, 1975, supplemented by letters of December 19, 1978 and April 28, 1980.
These amendments revise and upgrade certain limiting conditions of operation and associated surveillance requirements for ventilation filter systems.
Included are the hydrogen control purge systems, fuel building exhaust system, control room makeup air charcoal system, drumming station charcoal filter system and the miscellaneous vents charcoal filter system. The changes are in agreement with the model technical specifications for the engineered safety features ventilation systems for operating reactors and with Position C.5 and C.6 of Regulatory Guide 1.52, Re;*sion 2.
Minor changes were made to the proposed Table 4.1;-1 and to Bases 4.8, 4.13 and 4.17.
Also Specification 4.17.lE was added replacing existing require-ments on the coni.ainment charcoal filters which you had proposed to delete.
We consider the existing requirements should be maintained pending completion of the NRC Action Plan for Indian Point and Zion. The ::RC Project Manager, Mr.. Ed Reeves, has discussed these items with your Licensing Administrator, Mr. Bill Naughton.
Copies of the Safety Evaluation and the Notice of Issuance are also enclosed.
Sincerely, y
1:ll C'
hk g
. Steven A.
arga', Chipf
' Operating Reactors TWanch #1 Division of Licensing Enclosure & cc's:
See next page THIS DOCUMENT CONTAINS 8000050 M P00R QUAUTY PAGES g
Mr. D. Louis Peoples August fl 19fl0 Encl osures :
1.
Amendment No. 56 to DPR-39 2.
Amendment No. 53 to DPR-48 3.
Safety Evaluation 4
Notice of Issuance cc: w/ encl osures U. S. Environmental Protection Agency Robert J. Vollen. Esquire Federal Activities Building 109 North Dearborn Street Chicago, Illinois 60602 Region V Office ATTN: EIS COORDINATOR 230 South Dearborn Street Dr. Cecil Lue-Hing Director of Research and Development Chicago, Illinois 60604 Metropolitan Sanitary District of Greater Chicago 100 East Erie Street Chicago, Illinois 60611 Zion-Benton Public Library District 2600 Enunaus Avenue Zion, Illinois 60099 Mr. Phillip P. Steptoe Isham, Lincoln and Beale Counselors at Law One First National Plaza 42nd Floor Chicago, Illinois 60603 Susan N. Sc.uler, Esquire Assistant Attorney General Environmental Control Division 188 West Randolph Street, Suite 2315 Chicago, Illinois 60601 Mr. W. Bruce Dunbar Mayor of Zion Zion, Illinois 60099 Department of Public Health ATTN: Chief, Division of Nuclear Safety 535 West Jefferson Springfield, Illinois 62761 U. S. Nuclear Regulatory Consnission Resident Inspectors Office Post Office Box 288 Deerfield, Illinois 60015
)
j Director, Technical Assessment Division Office of Radiation Programs (AW-459)
U. S. Environmental Protection Agency Crystal Mall #2 Arlington, Virginia 20460