ML19331D985

From kanterella
Jump to navigation Jump to search
Forwards Amend 22 to License DPR-34 & Safety Evaluation
ML19331D985
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 08/19/1980
From: Tedesco R
Office of Nuclear Reactor Regulation
To: Millen C
PUBLIC SERVICE CO. OF COLORADO
Shared Package
ML19331D986 List:
References
NUDOCS 8009040506
Download: ML19331D985 (2)


Text

- --

Til " THIS DOCUMENT CONTAINS g M/

  1. ""%y00R QUAUTY PAGES UNITED STATES fo

^4 NUCLEAR REGULATORY COMMISSION y ; )y

.g WASHINGTON D.C.20666 a

\\

AUG 191980 Docket No. 50-267 Mr. C. K. Millen, Senior Vice P?esident Public Service Company of Colorado P. O. Box 840 Deriver, Colorado 80201

Dear Mr. Millen:

SUBJECT:

FORT ST. VRAIN NUCLEAR GENERATING STATION AMENDMENT N0. 22 TO FACILITY OPERATING LICENSE NO. DPR-34 The Commission has issued the enclosed Amendment No. 22 to Facility Operating License No. DPR-34 for the Fort St. Vrain Nuclear Generating Station in response to your applications for amendment dated March 23,1976 (P-76075), November 1, 1977 (P-77221), March 7,1979 (P-75056), August 13,1979 (P-79170), August 29, 1979 (P-79164), September 28,1979 (P-79218) and January 11,1980 (P-80003).

The amendment revised the Technical Specifications to:

(1) change the amount of diesel fuel in each diesel generator set day tank to 325 gallons; (2) update company reorganization based on NRC requirements; (3) change the number of hours that the ACM diesel generator can operate with 10,000 gallons of fuel to 108 hours0.00125 days <br />0.03 hours <br />1.785714e-4 weeks <br />4.1094e-5 months <br />; (4) alter the Fire Protection Technical Specifications to follow the requirements of STS on Fire Protection; (5) change the frequency and method of Reactor Protective System Surveillance to satisfy the requirement of IEEE-279-1971; (6) update the listing of all snubbers; (7) change the fissile particle thorium to uranium ratio to reflect "as manufactured" specifications; and (8) change the values for core region peaking factors and outlet temperature dispersions to reflect existing values in conjunction with accident reanalyses in support of full power operation.

A copy of the Safety Evaluation supporting this amendment and the related Federal Recister_ Notice are also attached.

Sincerely,

h Robert L. Tedesco, Assistant Director for Licensing Division of Licensing Encietures:

1.

Amendment No. 22 to OPR-34 2.

Safety Evaluation 3.

Federal Register Notice cc:

See next page 8 0 09040 h66

a 3

C. K. Hillen Senior Vice President Public Service Company of Colorado P. O. Box 840 Denver, Colorado 80201 James B. Graham, Manager Licensing and Regulation East Coast Office General Atomic Company 2021 K Street, N.W.

Suite 709 Washington, D. C.

20006 Mr. J. K. Fuller, Vice President Public Service Company of Colorado P. O. Box 840 Denver, Colorado 80201 Mr. W. Dickerson NRC Resident Inspector 16805 Weld County Road 191/2 Platteville, Colorado 80651 Director, Division of Planning Department of Local Affairs 615 Columbine Building 1845 Sherman Street Denver, Colorado 80203 Chairman, Board of County Commissioners of Weld County, Colorado Greeley, Colorado 80631 Regional Representative, Radiation Programs Environmental Protection Agency 1860 Lincoln Street Cenver, Colorado 80203 Mr. Don Warembourg Nuclear Production Manager Public Service Company of Colorado 16205 Weld County Road 191/2 Platteville, Colorado 80651 l

l 1

I 3

!