UNITED STATES Tlh
- p,as:0 [',,
NUCLEAR REGULATORY COMMISSION REGloN ill
,y o
D
'f 799 ROOSEVELT ROAD
/
GLEN ELLYN, ILUNOIS 60137 AUG 1419801 Docket No. 50-329 Docket No. 50-330 Consumers Power Company ATTN:
Mr. Stephen H. Howell Vice President 1945 West Parnall Road Jackson, MI 49201 Gentlemen:
Thank you for your interim report dated July 31, 1980, pursuant to 10 CFR 50.55(e) regarding Safe Shutdown Boration Capability. We will review your final report on this matter upon receipt.
Your cooperation with us is appreciated.
Sincerely, Gaston Fiorelli, Chief Reactor Construction and Engineering Support Branch cc: Director, RCI/II Director, AEQD Chief, OEB/MPA IE Files cc w/ltr dtd 7/31/80:
Central Files PDR Local PDR NSIC Ronald Callen, Michigan Public Service Commission Myron M. Cherry, Chicago 8000030 jr
s
~
I <O Power Consumers
'J p
James W Cook Q&flf Vsce hesdent. Mdland hoject I
General of fices. 1945 West Paensil Road Jackson. Michsgen.A9201 e (5171788-0640 July 31, 1980 Mr J G Keppler, Regional Director Office of Inspection and Enforcement US Nuclear Regulatcry Co==ission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 MIDLAND NUCLEAR PLAhI UNIT NO 1, DOCKET No 50-329 UNIT NO 2, DOCKET NO 50-330 SAFE ShVIDOWN BORATION CAPABILITY FILE:
0.h.9.36 UFI: 73*10'01 SERIAL:
8807
References:
S H Howell letters to J G Keppler; Midland Nuclear Plant; Unit No 1, Docket No 50-329; Unit No 2, Docket No 50-330; Safe Shutdown Boration Capability;
- 1) Serial Hove-283-79; dated October 21, 1979
- 2) Serial Hove-308-79; dated Dece=ber 6, 1979
- 3) Serial Hove-73-80; dated April 11, 1980 This letter, as were the referenced letters, is an interi 50.55(e) report regarding safe shutdown capability assuming a =ost restrictive core con-dition and the control rod of highest worth stuck out of the core.
The design criteria and the system details have been reviewed and agreed upon by CPCo, Bechtel and B&W.
Engineering and procure =ent activities to date are listed below:
1.
The syste= su==ary description has been reviewed and co==ented on by CPCo and B&W 2.
Bechtel has issued P&ID Drawing M-782, which is currently being re-viewed by CPCo and B&W 3.
An order for two (2) 2300 gallon ASME Section III Class 2 Boric Acid Tanks (with redundant heaters) has been placed with Richard Engineering Co=pany (RECO) 4.
An order has been placed for two (2) ASME Section III Class 2 pu=ps for recirculation of the e=ergency boration tank contents.
Syste= turnover to CPCo is presently scheduled for Nove=ber 1982.
}p# g<:r>Mi AUg 6 1980 oe 3e r
~
2 Another report, either interim or final, vill be sent on or before October 31, 1980.
~
s GRE/ch CC Director of Office of Inspection & Enforce =en AI'f Mr Victor Stello, USNRC (15)
Director, Office of Management Infor=ation & Program Control, USNRC (1)