ML19331D036

From kanterella
Jump to navigation Jump to search
Forwards Us Army Corps of Engineers Rept & Request for Addl Info Re Certain Geotechnical Engineering Studies on Plant Fill & Associated Remedial Actions. Expedited Reply Appreciated
ML19331D036
Person / Time
Site: Midland
Issue date: 08/04/1980
From: Schwencer A
Office of Nuclear Reactor Regulation
To: Jackie Cook
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
Shared Package
ML19331D037 List:
References
NUDOCS 8008270158
Download: ML19331D036 (6)


Text

m.

4,..

.p.u o

UNITED STATES g

E NUCLEAR REGULATORY COMMISSION o

3-2 e WASHINGTON, D. C. 20555 k....+/

AUG 4 1380 Docket Nos.: 50-329/330 j

e lll l

.h i

. f' '; I Mr. J. W. Cook

/;/ I Vice Fresident I

/

l Consumers Power Company g//f 1945 West Parnall Road

/

Jackson, Michigan 49201 v

Dear Mr. Cook:

i

SUBJECT:

CORP 0F ENGINEERS REPORT AND REQUEST FOR ADDITIONAL INFORitATION ON PLANT FILL i

My letter of June 30, 1980 requested the results of additional explorations and laboratory testing needed to support certain geotechnical engineering studies on the Midland plant fill and associated remedial actions.

That letter noted that details on the extent of these studies would be provided by separate correspondence. is a letter report of July 7,1980 by our consultant, the U.S. Army Corps of Engineers, and is forwarded to this end.

Paragraph 4 of the Corps report identifies adclitional information needed to resolve specific problems identified in paragraph 3.

For purposes of con-trol, we have re-numbered the subparagraphs of ' paragraph 4 to be sequential with our prior requests on this matter.

They,have also been marked to reflect the results of NRR review.

Your reply should reference the revised numbering system and should address the requests' as marked to reflect our changes.

. Subparagraph 4j of the Corps report entitled Liquefaction Potential, is not included in our re-numbering since it represents an evaluation rather than a request.

We consider this evaluation to be tentative at this time since it is subject to the determination of suitable seismic design input for the si te.

We will address this matter shortly by separate correspondence.

F

.Mr. J. W. Cook AUG 4 1990 We would appreciate your reply at your earliest opportunity.

Should you need clarification of these requests for additional information, please contact us.

Sincerely, i.

t4Wa'/dU A. Schwencer, Acting Chief Licensing Branch No. 3 Division of Licensing

Enclosure:

COE Letter Report dated 7/7/80 cc: See next page l

l i

l

~

c cc: Michael I. Miller, Esq.

Isham, Lincoln & Beale Suite 4200 1 First National Plaza Chicago, Illinois 60603 Judd L. Bacon, Esq.

Managing Attorney

>[.j.

r Consumers Power Company

{ !.,,

212 West Michigan Avenue

, / ^l Jackson, Michigan 49201

lp i
j,

Mr.Pau)A. Perry, Secretary;l Consumers Power Company

!l /

212 West Michigan Avenue

'I Jackson, Michigan 49201

/,

Pyron M. Cherry, Esq.

I; 1 IBM Plaza Chicago, Illinois 60611 i'u' Ms. Mary Sinclair 5711 Summerset Drive Midland, Michigan 48640 g

Frank J. Kelley, Esq.

~

Attorney General State of Michigan Environmental Protection Division g

720 Law Building i

Lansing, Michigan 48913

\\

'.\\

Mr. Wendell Marshall i+-

Route 10

~ ;'

Midland, Michigan 48640 Grant J. Merritt, Esq.

Thompson, Nielsen, Klaverkamp & James 4444 IDS Center 80 South Eighth Street Minneapolis, Minnesota 55402 9

N ti.

?

a 4

}

Mr. J. W. Cook !

J cc: Mr. Steve Gadler 2120 Carter Avenue S. Paul, Minnesota 55108 Mr. Don van Farcue, Chief //! //

4 Division of Radiological Health Department of Public Healthi

/

43909,/litl,.

j P. O. Box 33035 Lansing, Michigan l

/

I (ll

'<!illiam J. Scanica, Esq. i tj i

2034 Pauline Boulevard

'l l Ar.n Arbor, Michigan 48103-U. S. Nuclear Regulatory Commission Resident Inspectors Office Route 7 4

Midland, Michigan 48640 1

l 4

\\

i 9

i i

s' 5

e t

+

O' s

e 3-

^

cc:

Comander, Naval Surface Weapons Center

' ATTN:

P. C. Huang G-402

. ['

White Oak

. ///.

-l Silver Spring, Maryland,20 10 l: Ih Facility Design Engineering N((Ce'nter Mr. L. J. Auge,' Manager

~

!. (

/

Energy Technology Engineer 1. g P. O. Scx 1449 ill/

Canoga, Park, California 91304 l'l Mr. William Lawhead "l '

U. S. Corps of Engineers i t i

NCEED - T 7th Floor 477 Michigan Avenue 4

Detroit, Michigan 48226 Ms. Earbara Stamiris i

5795 N. River Freeland, Michigan 48623 Mr. Michael A. Race 2015 Seventh Street Bay City, Michigan 48706

' b' Ms. Sandra D. Reis.

1301 Seventh Street Bay City, Michigan 48706 i

Ms.-Sharon K. Warren 1

636 Hillcrest Midland, Michigan 48640 I

Patrick A. Race 1004 N. Sheridan Bay - City, Michigan. 48706 George C. Wilson,-Sr.

4618 Clunie Saginaw, Michigan 4S603

- Ms. Carol Gilbert 903 N. 7th Street Saginaw, Michigan 48601 l

e----e.+e.e-+e-

-vn.-

.,,3w-,

5-e..,as-

,.-+%,,.we,

-tm

,-v 1=g--r,-

,m

-g n

---we r

y y%+h-w-w-r w vr e--e e---m*-yy-gt.m-,r--.*=w-gw-=

-+-%

-- - W S-g

.o cc: Mr. William A. Thibodeau 3245 Weigl Road

j.,/ j Saginaw, Michigan 48603 Mr. Terry R. Miller

/

/

3229 Glendora Drive

'll' Bay City, Michigan 4S706

. / /,, ! '

}::l;l

{

i

!l!

f. j ;

I

\\

t i.

t h