ML19331C963

From kanterella
Jump to navigation Jump to search
Forwards IE Bulletin 80-18, Maint of Adequate Min Flow Through Centrifugal Charging Pumps Following Secondary Side High Energy Line Rupture. No Action Required
ML19331C963
Person / Time
Site: Marble Hill
Issue date: 07/24/1980
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Shields S
PSI ENERGY, INC. A/K/A PUBLIC SERVICE CO. OF INDIANA
References
NUDOCS 8008200531
Download: ML19331C963 (1)


Text

>2 K t 2g UNITED STATES o

NUCLEAR REGULATORY COMMISSION

[D',

.E REGION 111

[

799 ROOSEVELT ROAD o

b GLEN ELLYN. ILLINOIS 60137 o

"JUL 2. 4 1980 Docket No. 50-546 Docket No. 50-547 Public Service of Indiana ATTN:

Mr. S. W. Shields Senior Vice President Nuclear Division Post Office Box 190 New Washington, IN 47162 Gentlemen:

The enclosed IE Bulletin No. 80-18 is forwarded to you for your information.

Although no written response is required at this time, these concerns will be addressed as part of the licensing process for your plant.

If you desire additional information regarding this matter, please contact this office.

Sincerely,

'S' g ames G. Keppler Director

Enclosure:

IE Bulletin l

No. 80-18 cc w/ encl:

Mr. Steve J. Brewer, Nuclear Safety and Licensing Supervisor Central Files Director, NRR/DPM Director, NRR/ DOR PDR Local PDR NSIC TIC LeBoeuf, Lamb, Leiby & MacRae Mr. Dave Martin, Office of the Attorney General Mr. John R. Galloway, Staff Director, Environment, Energy and Natural Resources Subcommittee 800820'O 5 3l

SSINS No.: 6S20 Accession No.:

UNITED STATES 8005050062 NUCLEAR REGULATORY COM41SSION OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C. 20555 July 24, 1980

~

IE Bulletin No. 80-18 MAINTENANCE OF ADEQUATE MINIMUM FLOW THRU CENTRIFUGAL CHARGIN FOLLOWING SECONDARY SIDE HIGH ENERGY LINE RUPTURE Description of Circumstances:

1 Letters similar to the May 8, 1980 notification made pursuant to Title 10 CFR Part 21 (enclosure) were sent from Westinghouse to a number of operating plants and plants under construction (list, within enclosure) in early May, 1980.

The letters and the enclosed "Part 21" letter contain a complete description l

of the potential problem summarized below. The letters indicated that under certain conditions the centrifugal charging pumps (CCPs) could be damaged due to lack of minimum flow before presently applicable safety injection (SI) termination criteria are met. The particular circumstances that could result in damage vary somewhat from plant to plant, but involve unavail-ability of the pressurizer power operated relief valves (PORVs), with operation of one or more CCPs repressurizing the reactor during SI following a secondary system high energy line break. Since the SI signal automatically isolates the CCP mini-flow return line, the flow through the CCPs is det. ermined by the individual pump characteristic head vs. flow curve, the pressurizer safety valve setpoint, and the flow resistances and pressure losses in the piping and in the reactor core. That minimum flow may not l

l before current SI termination criteria are met.

Westinghouse recommends that plant specific calculations outlined in the letter (enclosure) be performed to determine if adequate minimum flow is assured under all conditions. If adequate minimum flow is not assured, Westinghouse recommends specific equipment and proce assure availability of the necessary minimum flow by assuring that the mini-flow bypass line will be open when needed, but will be closed at lower pressures when the extra flow resulting from bypass line closure might be necessary for core cooling.

_. l

=

II DUPLICATE DOCUMENT lI ii Entire document previously entered into system under:

[

O $O({} hh PNO t

No. of pages:

^~

-mors=-~

4,

_,,