.f %
MgA A
UNITED STATES 7
NUCLEAR REGULATORY COMMISSION a
g-l WASHINGTON. D. C. 20555 v
's, **,**
AUGUST S ma Docket Nos. 50-277 and 50-278 Mr. Edward G. Bauer, Jr.
Vice President and General Counsel Philadelphia Electric Cogany 2301 Market Street Philadelphia, Pennsylvania 19101
Dear Mr. Bauer:
By letter dated February 23, 1980, you were requested to provide informa-tion regarding primary coolant system pressure isolation valves. The objective of this 10 CFR 50.54(f) letter was to identify those plants which have either or both of the valve configurations found in WASH-1400 (Event V) to be significant risk contributors to an intersystem LOCA which results in a core melt accident.
We have confirmed that the two specific Event V valve configurations do not exist at your facility.
This is based upon the evaluation of your response to our February letter as well as the review of previously docketed information (Enclosure).
Based on this, our activities regarding these valve configurations have been finalized for your facility.
In addition to these Event V valve configurations, we are continuing our efforts to review other configurations located at high pressure /
lcw pressure system boundaries for their potential risk contribution to an intersystem LOCA which may result in a core melt accident.
Therefore, further activity regarding the broader topic of intersystem LOCA's may be expected in the future.
Your time and effort in closing out the Event V portion of the inter-system LOCA concern are appreciated.
Sincerely, r3.
! ]
}48 'l' du/
Robert W. Reid, Chief Operating Reactors Branch #4 Division of Licensing Enclosure and ces:
See next page 8008eoo/R a
j
]
i 2-Mr. Echtard G. Bauer, Jr.
i l
Enclosure:
Franklin Research Center Technical Eva?uation Report, " Primary Coolant System Pressure Isolation Valves,"
dated July 21, 1980.
t cc w/o enclosure:
See next page i
l l
i i
i l
l l
l
--n
,r 3,y w-
,y
-..cr-
,w-,,,mgn,,-
rv-,yy..,y,,,-..,%,,,wwww.mw--e,,&--,m-,m--.,w,-,-.%.-emm
.,w+
,-w.w-~w,w 9,
,+,,- -.,-- - -.-
m-,ow-,
Mr. Edward G. Bauer, Jr.
5 Philadelphia Electric Company cc:
Eugene J. Bradley Director, Technical Assessment Philadelphia. Electric Company Division Assistant General Counsel Office of Radiation Programs 2301 Market Street (AW-459)
Philadelphia, Pennsylvania 19101.
US EPA Crystal Mall !2 Troy B. Conner, Jr.
Arlington, Virginia 20460 1747 Pennsylvania Avenue, N. W.
Washington, D. C.
20006 Region III Office ATTN:
EIS COORDINATOR Raymond L..Hovis, Esquire Curtis Building (Sixth Floor) 3S South Duke Street 6th and Walnut Streets York, Pennsylvania 17401 Philadelphia, Pennsylvania 19106 Warren K. Rich, Esquire M. J. Cooney, Superintendent Assistant Attorney General Generation Division - Nuclear Department of Natural Resources Philadelphia Electric Company Annapolis, Maryland 21401 2301 Market Street Philadelphia, Pennsylvania 19101 Philadelphia Electric Company ATTN:
Mr. W. T. Ullrich Government Publications Section Peach Bottom Atomic State Library of Pennsylvania Power Station Education Building Delta, Pennsylvania 17314 Commonwealth and Walnut Streets Harrisburg, Pennsylvania 17126 Mr. R. A. Heiss, Coordinator Pennsylvania State Clearinghouse Governor's Office of State Planning and Development P. O. Box 1323 Harrisburg, Pennsylvania 17120 Albert R. Steel, Chairman Soard of Supervisors Peach Bottom Township R. D. El l
Delta, Pennsylvania 17314 l
l Curt Cowgill l
U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement Peach Bottom Atomic Power Station P. O. Box 399 Delta, Pennsylvania 17314
-.