ML19331C903

From kanterella
Jump to navigation Jump to search
Confirms 800624 Invitation to 800804 Working Meeting at Region 1 Ofc to Discuss Plant as-installed Configuration of Control Rod Drive Sys,Shutdown Discharge Vol & Other Matters Re IE Bulletin 80-17
ML19331C903
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 07/25/1980
From: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Daltroff S
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
References
IEB-80-17, NUDOCS 8008200062
Download: ML19331C903 (2)


Text

UNITED STATES g

jf

,'o NUCLEAR REGULATORY COMMISSION

/

g g

g REGION 1 5

[

$31 PARK AVENUE o

KING OF PRUSSI A. PENNSYLVANI A 194M JUL 2 5 1980 Docket Mos. 50-277 50-278 Philadelphia Electric Company ATTN: Mr. S. L. Daltroff Vice President Electric Production 2301 Market Street Philadelphia, Pennsylvania 19101 Gentlemen:

This letter confirms the call made to your office on July 24, 1980, ir..hich we extended an invitation for members of your staff to attend a working level meeting at the Region I office to discuss your plant's as-installed configuration of the Control Rod Drive Systems shutdown discharge volume and other matters associated with IE Bulletin 80-17, " Failure of Controi Rods to Insert Fully During a Scram at a BWR," issued July 3,1980.

The meeting will be held on August 4,1980, at the Region I office in King of Prussia, Pennsylvania starting at 9:30 a.m.

It is expected to last approximately 115 hours0.00133 days <br />0.0319 hours <br />1.901455e-4 weeks <br />4.37575e-5 months <br />. One hour prior to the scheduled time, a taped presentation regarding the subject will be given by NRR personnel for those who wish to attend.

During your plant specific discussions, your staff attendees should be prepared to discuss in detail with members of IE and NRR staffs, the as-built condii.1on of the subject systems.

Knowledgeable engineering and design personrgi should be available for these discussions.

Specifically, you should bring:

l 1.

Marked up drawings showing as-built conditions which have been identified l

by walk-thru of the system (including pneumatic, hydraulic and electrical drawings).

1 1

i 2.

A system description including logic diagrams as necessary to show the operation of the system.

i 3.

Preliminary recommendations for proposed changes to the system.

4.

Engineering bases for the changes.

5.

Interface requirements imposed on t%e A-E for the system designs.

l 6.

Interfaces with other syttems.

1 Two copies of all information (including marked up drawings) presented by the licensee should be given to the staff prior to the start of the meeting.

1 8008200 on g

JUL 2 5 1980 Phi'.:delphia Electric Company 2

No reply to this letter is required; however, should you have any questions concerning this meeting please contact Mr. D. L. Caphton of this office, (215-337-5266).

Sincerely, AfVY,

yce H. Grier Director cc:

W. T. Ullrich, Station Superintendent Troy B. Conner, Jr., Esquire Eugene J. Bradley, Esquire i

l Raymoi._ L. Hovis, Esquire Michael J. Scibinico, II, Assistant Attorney General l

i l

94.

l i

I

__