Forwards Response to IE Bulletin 80-15, Possible Loss of Emergency Notification Sys W/Loss of Offsite Power. Lists Approx Manhours Expended on Bulletin Response
ML19331C887
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 07/30/1980
From: Baynard P
FLORIDA POWER CORP.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
IEB-80-15, NUDOCS 8008200016
Download: ML19331C887 (5)


Text

f0 t-

,so seo A

' : c, N' P C R r. '3 :d '.'

y.... ; r,r _ r.

~

? '1 / :' c I All : 1(

Florida Power CORPOmaisON July 30,1980 File:

3-0-3-a-4 Mr. J. P. O'Reilly Director U.S. Nuclear Regulatory Comission Office of Inspection and Enforcement Suite 3100 101 Marietta Street Atlanta, GA 30303

Subject:

Crystal River Unit 3 Docket No. 50-302 Operating License No. DPR-72 I.E. Bulletin 80 POSSIBLE LOSS OF EMERGENCY NOTIFICATION SYSTEM (ENS) WITH LOSS OF 0FFSITE POWER

Dear Mr. O'Reilly:

Enclosed is our response to I.E.Bulletin 80-15.

As you requested, the approximate manhours expended on this bulletin by plant and Engineering personnel are:

24 Hours in conduct of review 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> for required tests and reports i

S 0 08 2 00 d i d, l

GFFICIAL CDpr y

_~.

s Mr. J. P. O'Reilly Page Two July 30, 1980 Please contact this office if you require any additional discussion con-cerning our response.

Very truly yours, FLORIDA POWER CORPORATION

. Y. Baynard Manager Nuclear Support Services Lobo (F03)DIA-2 Attachment i

cc: Director U.S. Nuclear Regulatory Commission Office of Inspection and Enforcement Washington, D.C. 20555 t

l l

e l

I

... ~...

STATE OF FLORIDA COUNTY OF PINELLAS P. Y. Baynard states that she is the Manager, Nuclear Support Services Department of Florida Power Corporation; that she is authorized on the part of said company to sign and file with the Nuclear Regulatory Com-mission the information attached hereto; and that all such statements made and matters set forth therein are true and correct to the best of her knowledge, infomation and belief.

0A M $. Y J

~

() W. Y. Bafnard Subscribed and sworn to before me, a Notary Public in and for the State and County above named, this 30th day of July,1980.

AAdll$ (

4KOQ Notary Public Notary Public, State of Florida at Large, My Comission Expires: May 29, 1984 PYB/MACNotary(DN-98)

9 FPC RESPONSE TO IE BULLETIN 80-15 Item 1:

Within 10' days of the date of this Bulletin, verify by direct in-spection, in conjunction with the appropriate telephone compar/

representative, that the ENS at your facility is powered in the manner described in the two enclosures.

Response

Errergency Notification System (ENS) at CR-3 is powered by on-site power. This was verified by direct inspet tion on June 26, 1980.

Item 2:

Those facilities which have station packages requ'i ring on-site power, but which ara not connected to a safeguards instrumentation bus which is backed up by batteries and an inverter or equally re-liable power supply, shall make necessary modifications and provide such a connection.

Response

At CR-3, the station package is connected to a vital bus, which is backed up by batteries and an inverter.

This provides a non-interruptible power source to the ENS.

Item 3:

All facilities are to develop and conduct a test, within 60 days of the issuance of this Bulletin, to verify that all extensions of the ENS located at your facility (ies) would remain fully operable from the facility (ies) to the NRC Operations Center in the event of a loss of offsite power to your facility (ies).

This is not intended to mean that an actual loss of offsite power be executed.

Response

A test (No. 80-3-64) was successfully conducted on 7-15-80 to con-firm that the ENS remains fully operable from the facility to the NRC Operations Center, in the event of loss of of fsite power.

Logo (F03)DIA-2

l Item 4:

If it is determined that station package requiring on-site power is not connected to a safeguards instrumentation bus backed up by automatic transfer to batteries and an inverter or an equally reliable power supply, noti.fy the NRC Operations Center via the ENS within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after such determination.

Response

Not applicable. See response to Items 1 and 2.

Item 5 :

Prepare and issue an administrative procedure or directive Witch requires notification to the NRC Operations Center by comercial telephone or relayed message within one hour of the time that one or more extensions of the ENS located at your facilitf(ies) is sub-sequently found to be inoperable for any reason.

Response

Red and orange phones contain labels with the following ressage:

"IN THE EVENT THIS PHONE IS FOUND IN0PERABLE NOTIFY THE NRC BY COMMERCIAL PHONE WITHIN ONE HOUR 301-492-8111" Also, see Attachment I regarding plant manager's memorandum to CR-3 personnel.

l Lobo (F03)DIA-2

..~

, w w.t.

Management Memorandum 30-5 '

l NRC IE Bullecin 80-15 required us to, " Prepare and issue an administrative procedure or directive which requires noti-fication to the NRC Operations Center by commercial telephone or related message within one hour of the time that one or more extensions of the ENS located at your facility (ies) is i

subsequently found to be inoperable for any reason."

I This letter will serve as that directive.

I.abels are in the 1

process of being installed on all NRC red and orange emergency phones to indicate to personnel using those phones of the proper actions to be taken when those phones are found inop-etable.

All Section Heads and Department Heads should indoctrinate individuals under their supervision to this policy.

J D. C. Poole i

Nuclear Plant Manager i