VIRGINIA Er.ucrurc Axn Pown u Co>ti Axy nicurwoxn,Vinorx A erses:

August 15, 1980 Mr. Harold R. Denton, Director Serial No. 711 Office of Nucicar Reactor Regulation N0/RKr:ms Attn:

Mr. Robert A. Clark, Chief Docket Nos. 50-338 Operating Reactors Branch No. 3 50-339 Division of Licensing License Nos. NPF-4 U. S. Nuclear Regulatory Commission NPF-7 Washington, D. C.

20555

Dear Mr. Denton:

The North Anna Power Station Procedure for sampling the service water pump house drain system for turbidity and suspended solids (1-PT-75.6.1) has been changed.

This letter serves as notification pursuant to the Atomic Safety and Licensing Appeal Board Decision, ALAB-578.

The change to the periodic test was to visually inspect each of the six sampics.

If a sample appears cloudy, it will be tested individually.

If any turbidity is detected, an engineering study will be performed to determine the cause.

Very truly yours,

/&h B. R. Sylvia Manager - Nuclear Operations and Maintenance cc:

Mr. James P. O'Reilly, Director Office of Inspection and inforce ent Mr. B. Joe Youngblood, Chief Licensing Branch No. 1 Division of Licensing