A g rig' b[
COR80merS power kgp Company
~.
General offices: 212 West Michtgen Avenue, Jackson, Michtgen 49201 + (517) 788-0550 August 14, 1980 Director, Nuclear Reactor Regulation Att Mr Dennis M Cru?.chfield, Chief Operating Reactors Branch No 5 US Nuclear Regulatory Commission Washington, DC 20555 DOCKET 50-155 - LICENSE DPR BIG ROCK POINT PLANT - DESCRIPTION OF INSERVICE TEST PROGRAM FOR PUMPS AND VALVES AND REQUESTS FOR RELIEF FROM SPECIFIC ASME CODE REQUIREMENTS Consumers Power Company submittal dated December 7, 1979 forwarded a descrip-tion of the Big Rock Point inservice test program for pumps and valves and requests for relief from specific code requirements.
The changes (4 pages) attached to this letter comprise a revision to our December 7, 1979 submittal incorporating additions and clarifications to the program and a relief request.
Your review of the attachments and the program as revised and approval of the relief requests identified by the revised program are requested.
David P Hoffman (Signed)
David P Hoffman Nuclear Licensing Administrator CC Director, Region III, USSRC NRC Resident Inspector-Big Rock Point oc0880-019ea-43 8008190 9,6 %
5 Rav 8/14/80 i
IWP TESTING Pumps provided with emergency power sources are required to be tested. This includes pumps powered by the emergency diesel generator, the two core spray pumps and the electric fire pump, and the self-powered diesel fire pump.
Tests to be performed on the'se pumps are as follows:
1.
Core Spray Pumps - The pumps will be tested once each reactor shutdown for refueling. See request for reli;f.
2.
Electric Fire Pump - The electric fire pump will be tested each reactor shutdown (but not more frequently than monthly).
3.
Diesel Fire Pump - This pump will be tested each reactor shutdown (but not more frequently than monthly).
The parameters to be measured during these tests are tabulated below.
Rotative Inlet Flow Bearing Pump Name Speed Pressure AP Rate Vibration Temperature Core Spray R
R R
NA*
R bbi Electric Fire ES ES ES NA*
ES NM Diesel Fire ES ES ES NA*
ES NM ES - Every shutdown (but not more frequently than monthly).
Y - Yearly.
R - Once/ Refueling.
NM - No measurement possible - just monitor vibration.
This is b'ecause the core spray, electric and diesel fire pump bearings are cooled nnd lubricated by the water being pumped.
Due to water temperature variations and bearing inaccessibility, there is no method that will establish a meaningful bearing reference temperature. Thus, no measurement will be taken.
- Per IWP3100, differential pressure will be used to establish pump acceptability.
NOTE: The acceptable ranges of parameters will be as required in Table IWP-3100-2.
e nu0880-0196b-43
10 Rsv 8/14/80 LISTING OF NEW TEST REQUIREMENTS VALVE EXERCISING REQUIREMENTS 4
VALVES TO BE EXERCISED Each Reactor Each Cold
- Reactor
- Quarterly Refueling Shutdown Shutdown Valves and Testing Requirements
- VPI306, Core Spray Check Valves - Exercise 307,300 by Testing Pump VPI3015302 Core Spray Check Valves - Exercise by Flow Service Water Shutoff and Fire Water Discharge to Canal VPI303&304 Core Spray Check Valves -
Disassemble and Inspect 4
VFP304&309 Fire Pump Discharge Check -
Exercise During Pump Test M07066 Core Spray Heat Exchanger Shell Side Inlet Isolation Valve - Exercise M07072 Third Path of Fire Water to Containment Isolation Valve - Exercise Other testing requirements written in margins of the proposed IWV Testing.
i
- But not more frequently than quarterly.
I l
l l
l l
l l
l I
nu0880-0196c-43
I IW TESTING w.
7
?
8 8
3 0
8 a
8 3
8 2
t 8
0 8
2 C
2 8
h
?
n o
8 R
2 s
a a
u 5
Valve U
3 a
o w
Valve Print "E*E U f
U Remarks Number Number o
A B
C D
E m
z m
a s
(Not To Be Used for Relief Basis)
RV5043 M-123 E-15 X
3/4" RV PR C
1/RR N
Fire System Relief Valves at Pump RV5062 E-15 4"
RV PR
'C 1/RR N
Discharge RV5063 G-15 3/4" RV PR C
1/RR N
i-M07051 M-123 0-9 X
4" GT M0 C
Q N
Core Spray and Redundant Core Spray M07061 0-10 Isolation Valves M07070 N-9 M07071 N-10 M07064 M-123 M-10 X
4" GT MO C
Q Y
RR Enclosure Spray Isolation Valve M07068 M-13 Backup Enclosure Spray Isolation Valve VPI306 M-123 Q-14 X
4" CK FL C
Q Y
RR*
Core Spray Pump Discharge Check Valve VPI307 Q-16 X
4" CK FL C
Q Y
RR*
Core Spray Pump Discharge Check Valve VPI300 0-14 X
4" CK FL C
Q Y
RR*
Core Spray Test Tank Inlet Check Valve M07066 M-123 Q-17 X
4" GT MO C
Q N
Core Spray Heat Exchanger Shell Side Inlet Isolation Valve M07072 M-123 0-15 X
4" GT M0 C
Q Y
ES Third Path of Fire Water to Containment Isolation Valve
- The above three check valves are dependent upon testing of the core spray pump. Thus, see the relief request for the core spray pump.
E<
$G
J
/
41 Original 8/14/80 a
RELIEF REQUEST BASIS System:
Core Spray System l
Valve:
M07072 Category:
B Class:
2 i
Function:
To provide a third path of fire water to the containment.
Test Requirement:
Exercise quarterly.
Basis for Relief:
Exercising this valve will introduce fire water into the j
inhibited water of the core spray pump piping. Exercising during each shutdown will minimize the amount of fire water that enters the core spray pump piping.
Alternate Testing: Each reactor shutdown but not more frequently than monthly.