ML19331C382

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-364/80-17 on 800609-12.No Noncompliance Noted
ML19331C382
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 07/09/1980
From: Stohr J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Mcdonald R
ALABAMA POWER CO.
Shared Package
ML19331C383 List:
References
NUDOCS 8008180209
Download: ML19331C382 (2)


See also: IR 05000364/1980017

Text

[an;t:p\\

-e

O

UNITED STATES

y

'$

NUCLEAR REGULATORY COMMISSION

7

'j

REGION 11

.

101 MARlETTA ST., N.W., SulTE 3100

$,

ATLANTA, GEORGIA 30303

.....

In Reply ~ Refer To:

M ~0

P>IISUM

7

Alabama Power Company

ATTN:

R. P. Mcdonald

Vice President-Nuclear Generation

P. O. Box 2641

Birmingham, AL 35291

Gentlemen:

This refers to the inspection conducted by W. J. Millsap of this office on

June 9-12, 1980, of activities authorized by NRC Construction Permit No. CPPR-86

for the Farley facility, and to the discussion of our findings held with J. Woodard

at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

In accordance with Section 2.790 of the NRC's "Rulen ci l'ractice", Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

to this office to withhold such information from public disclosure. Any such

application must include a full statement of the reasons on the basis of which

it is claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained in a

separate part of the document. If we do not hear from you in this regard within

the specified period, the report will be placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

.

Sincerely,

. Philip Stohr,

f

Fuel Facility and Materials

Safety Branch

Enclosure:

(See Page 2)

8 008180 Soi

l

.

M ~0

Alabama Power Company

-2-

Inclosure:

Inspection Report No. 50-364/80-17

cc w/ encl:

A. R. Barton, Executive Vice President

H. O. Thrash, Manager, Nuclear Generation

F. L. Clayton, Jr., Senior Vice President-

W. C. Petty, Manager-Quality Assurance

(Design and Construction)

W. G. Hairston, III, Plant Manager

R. E. Hollands, Jr. , QA Supervisor

O. D. Kingsley, Jr., Manager, Nuclear Engineering

and Technical Services

.

,-,.v...

,,a.-

. . , , -

w

- . .

--

,-.,w,,

,,,, ,, ,, , , , - - . , , - , . . . . ,

, - . , - - , ,

,,

---

--

n.

e-

- . --.- -- -