Text
j{)
UNITED STATES g
g NUCLEAR REGULATORY COMMISSION
- E WASHING TON, D. C. 20555
,8 AUG 6 1980
's,,,s*#,
Docket No. 50-320 Mr. R. C. Arnold Senior Vice President Metropolitan Edison Company 100 Interpace Parkway Parsippany, New Jersey 07054
Dear Mr. Arnold:
This letter is in response to your letter (TLL 315) of June 30,1980 and addresses the issues of NRC approval of the submerged demineralizer system (SDS), solid waste disposal, a contingency plan for alternate storage of reactor building sump water, and formation of an oversight group for review of cleanup activities.
Submerged Demineralizer System
.In your letter, you request that the "NRC take the steps necessary to permit approval of the operation of the SDS consistent with the availability of the system for operation." You stress that it is important to decontaminate the reactor buildir1 sump water as promptly as possible because of the potential for the water "!eveloping into an emergency situation."
While we agree that immobilization of the radioactivity contained in the reactor building sump water will be an important accomplishment in reducing the real and potential threat to public and occupational worker health and safety, we do not currently view processing of the water as a sufficiently urgent problem to require resolution prior to publication of the staff's final Programmatic Environmental Impact Statement (PEIS). This position is consistent with that i
of the Commission as elaborated in their Memorandum and Order of October 16, 1979 authorizing the operation of EPICOR-II and in their Statement of Policy of November 21, 1979. Barring emergency situations which might require prompt Commission action, or other circumstances which cause the Commission to decide it is in the best interest of the public health and safety to proceed in advance of a final PEIS, it is the Commission's intent to evaluate all alterratives for disposition of the reactor building sump water and involve the public in the Comnission's decision-making process prior to granting ' approvals fcr specific cleanup choices, in accordance with the objectives of NEPA. As you know, the vehicle for implementing the objectives of NEPA is the staff's PEIS. We anticipate that the final PEIS will be issued by the end of this year.
NRC's decision on this question will be based on examination in the PEIS of alternatives for disposition of recctor building sump water.
In the meantime, 8008140 577 g
\\
a AUG 6 1980 Mr. R. C. Arnold
-2 the staff will continue its technical review of the design and operating aspects of the SDS in response to your submittal of April 10,1980 (TLL-160, Technical Evaluation Report - Submerged Demineralizer. System) and future licensee submittals.
Thus, unless the status of the reactor building warrants alternative actions, NRC will not approve operation of any system until the full NEPA and safety review is complete and the hest alternative is chosen for protection of the health and safety of the occupatior.ri workers and the public.
c Solid Waste Disposal We stated in our letter of May 28, 1980 to you (and Mr. Dieckamp) that we would provide further guidance concerning the ultimate disposition of high specific activity solid waste (e.g. first stage SDS resins). During the past few months, NRC representatives of the Office of Nuclear Reactor Regulation and Office of Nuclear Material Safety and Safeguards have held joint meetings with representatives of the Department of Energy to explore all alternatives for the ultimate disposition of solid waste which may not be suitable for disposal in commercial low level waste burial sites. These meetings will continue in the future and we anticipate that your organization will also participate. The alternatives for ultimate disposition of this waste are elaborated in our draft PEIS, currently nearing completion, which will be available for public comment very shortly.
We would recommend that, after you have had an opportunity to review the discussion of solid waste handling and disposal in the draft PEIS, we arrange a meeting to discuss,the desired waste form and container (liner) design to ensure compatibility with the options for ultimate disposition.
For example, should the SDS be approved, the first stage liner design should incorporate the capability for sluicing the resins out of the liner for further processing.
As the resolution of the waste disposal issue has already been given high priority and discussions between the NRC and DOE have been ongoing and will continue (with your participation) in the future, we do not see the need, at this time, to establish a more formal interagency task force as you suggested.
Contingency Plan for Alternate Storage of Reactor Building Sump Water In your letter (TLL 315), you stated that you were reviewing the options available for removal of the reactor building sump water in the event that action becomes It was not intended in my May 28 letter to suggest that construction necessary.
of additional tank facilities was the only alternative to transfer the sump water.
If a satisfactory contingency plan for handling an emergency situation can be devcloped utilizing existing TMI facilities, obviously this should be considered as the preferred alternative.
In my May 28 letter I requested that you advise within two weeks when we may expect a contingency plan for our review. Since this plan has not yet been received, I expect to obtain a commitment date from you within one week.
s
o Mr. R. C. Arnold AUG 6 1980 Periodic Oversite Concerning the GPU recommendation of Marcn 4,1980 (H. Dieckamp to J. Ahearne),
reiterated in your June 30 letter, for formation of an oversight group with representatives from GPU, NRC and the Commonwealth of Pennsylvania to review and evaluate the status of cleanup activities, I agree periodic status reviews should be scheduled. It is suggested that monthly, or bimonthly, management review meetings be held.
I have designated Dr. Bernard J. Snyder, Program Director, TMI Program Office to be the senior NRC representative for this purpose.
I also agree that representation from the Commonwealth of Pennsylvania is desirable and have discussed that possibility with Mr. Clifford Jones, Secretary, Pa. DER.
We would welcome any thoughts you might have on these matters.
Sincerely, Harold R. Denton, Director Office of Nuclear Reactor Regulation cc:
H. Dieckamp, GPU Service List Attached C. Jones, Pa. DER 6
l 1
a
i l
l Metropolitan Edison Co. Mr. R. W. Conrad Mr. G. K. Hovey Pennsylvania Electric Ccgany Director, Unit 2 1007 Broad Street Metropolitan Edison Comany Johnstown, Pennaylvania 15907 P.O. Box 480 Middletown, Pennsylvania 17057 J. B. Lieberman, Esquire Berlock, Israel, Lieberman Mr. J. J. Barton 26 Broa &ay Manager, Site Operations, Unit 2 New York, New York 10004 Metropolitan Edison Cogany P.O. Box 480 George F. Trewbridge, Esquire Middletown, Pennsylvania 17057 Shaw, Pittme, Potts & Trowbridge 1800 M Street, N.W.
Mr. R. W. Heward Washington, D. C.
20036 Manager, Radiological Control, Unit 2 Metropolitan Edison Cogany Ms. Mary V. Southard, Chairperson P.O. Box 480 Citizens for a Safe Environment Middletown, Pennsylania 17057 P.O. Box 405 Harrisburg, Pennsylvania 17108 Mr. B. Elam Manager, Plant Engineering, Unit 2 Dr. Walter H. Jordan Metropolitan Edison Company 881 W. Outer Drive P.O. Box 480 Oak Ridge, TN 37830 Middletown, Pennsylvania 17057 Dr. Linda W. Little Mr. R. F. Wilson 5000 Hermitage Drive Director, Technical Functions Metropolitan Edison Comany Raleigh, NC 27612 P.O. Box 480 Karin W. Carter, Esquire Middletown, Pennsylvania 17057 505 Executive House P.O. Box 2357 Mr. L. W. Harding Harrisburg, Pennsylvania 17120 Supervisor of Licensing Metropolitan Edison Cogany The Honorable Mark Cohen P.O. Box 480 512 E-3 Main Capital Building Middletown, Pennsylvania 17057 Harrisburg, Pennsylvania 17120 Mr. E. G. Wallace Ellyn Weiss, Esquire Licensing Manager Sheldon, Harmon & Weiss GPU Service Corporation 1725 I Street, N.W., Suite 506 100 Interpace Parkway Washington, D. C, 20006 Parsippany, New Jersey 07054 Mr. Steven C. Sholly Mr. I. R. Finf rock, J r.
304 S. Market Street Jersey Central Power & Light Cogany Mechanicsburg, Pennsylvania 17055 Madison Avenue at Punch Bowl Road Morristown, New Jersey 07950 Mr. The. 's Gerusky Bureau or Radiation Protection P.O. Box 2063 Harrisburg, Pennsylvania 17120 1
,~
t Metropolitan Edison Co. John Levin, Esquire s
a 04 ad ord r ace 5
Phile..> lphia, Pennsylvania 19149 Harrisburg, Pennsylvania 17120 Ms. Jane Lee R.D. 3, Box 3521 J rdon D. Cunningham, Esquire Etters, Pennsylvania 17319 Fox, Farr and Cunningham 2320 N. Second Street Walter W. Cohen, Consumer Advocate Harrisburg, Pennsylvania 17110 Department of Justice Strawberry Square,14th Floor Ms. Kathy McCaughin Harrisburg, Pennsylvania 17127 Three Mile Island Alert, Inc.
23 South 21st Street Robert L. Knupp, Esquire Harrisburg, Pennsylvania 17104 Assistant Solicitor Ms. Marjorie M. Aamodt Knupp and Andrews R.D. #5 P.O. Box P 407 N. Front Street Coatesville, Pennsylvania 19320 Harrisburg, Pennsylvania 17108 Ms. Karen Sheldon Sheldon, Harmon, Roisman & Weiss John E. Minnich, Chairperson 1725 I Street, N.W., Suite 506 Dauphin Co. Board of Commissioners Washington, D. C.
20006 Dauphin County Courthouse Front and Market Streets Earl B. Hoffman Harrisburg, Pennsylvania 17101 Dauphin County Comissioner Dauphin County Courthouse Robert Q. Pollard Front and Market Street Chesapeak Energy Alliance Harrisburg, Pennsylvania 17101 609 Montpelier Street Baltimore, Maryland 21218 Government Publications Section State Library of Pennsylvania Chauncey Kepford Box 1601 Education Building Judith H. Johnsrud Environmental Coalition on Nuclear Power Harrisburg, Pennsylvania 17127 433 Orlando Avenue State College, Pennsylvania 16801 Dr. Edward O. Swartz Board of Supervisors Ms. Frieda Berryhill, Chairperson Londonderry Township Coalition for Nuclear Power Plav RFD #1 Geyers Church Road Middletown, Pennsylvania 17057 Postponement 2610 Grendon Drive Wilmington, Delaware 19808 U.S. Environmental Protection Agency Region III Office ATTN: EIS C0ORDINATOR Holly S. Keck Anti-Nuclear Group Representing York Curtis Building (Sixth Floor) 6th and Walnut Streets 245 W. Philadelphia Street York, Pennsylvania 17404 Philadelphia, Pennsylvania 19106
'y o
Metropolitan Edison Co Dauphin County Office Emergency Preparedness Court House, Room 7 Front and Market Streets Harrisburg, Pennsylvania 17101 Department of Environmental Resources ATTN: Director, Office of Radiological Health P.O. Box 2063 Harrisburg, Pennsylvania 17105 Governor's Office of State Planning and Development ATTN: Coordinator, Pennsylvania Clearinghouse P.O. Box 1323 Harrisburg, Pennsylvania 17120 Mrs. Rhoda D. Carr 1402 Marene Drive Harrisburg, Pennsylvania 17109 Mr. Richard Roberts The Patriot 812 Market Street Harrisburg, Pennsylvania 17105 Mr. Robert B. Borsum Babcock & Wilcox Nuclear Power Generation Division Suite 420, 7735 Old Georgetown Road Bethesda, Maryland 20014 Mr. William A. Lochstet 119 Eaet Aaron Drive State Lllege, Pennsylvania 16801 Ivan W. Smith, Esquire Atomic Safety and 1icensing Board U.S. Nuclear Regulatory Comission Washington, D. C.
20555 Atomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Comission Washington, D. C.