Responds to Ltr to President Carter Expressing Concerns. Public Hearing Will Be Conducted to Determine Facility Operation.Portion of PA Public Util Commission 800523 Order, Re Allocation of Financial Burden,Encl
ML19331C287
Person / Time
Site: Crane Constellation icon.png
Issue date: 07/15/1980
From: Reid R
Office of Nuclear Reactor Regulation
To: Wildermuth C
AFFILIATION NOT ASSIGNED
Shared Package
ML19331C281 List:
References
NUDOCS 8008140505
Download: ML19331C287 (2)


Text

~.

Enclosure

- '

  • j.n usuq D

UNITED STATES g

p, NUCLEAR REGULATORY COMMISSION b

E WASHING TON, D. C. 20555

%....,o kUULY 1 3 saa Docket No. 50-289 Mr. Charles A. Utidermuth P. O. Box 426 Fleetwood, PA 19522

Dear Mr. Wildermuth:

I am writing in response to your recent letter to President Carter which was forwarded to the Nuclear Regulatory Comission (NRC).

In your corre-spondence, you expressed your attitudes and sentiments regarding issues involving the Three Mile Island Nuclear Station.

As you may be aware, the NRC has ordered that a public hearing be conducted to determine whether t.he facility should be operated and, if so, under what conditions.

The public hearing is scheduled to begin this fall.

During the hearing, the technical issues appropriate to assure public health 4

and safety will be addressed.

The NRC staff is currently involved in the on-going review of technical information concerning the restart of Unit 1.

Based upon the current status of the proceedings, the development of a record on which the NRC can make a decision regarding restart is not expected before the early part of 1981.

The Pennsylvania Public Utility Comission (PUC) issued on May 23, 1980, a sequel to the PUC's June 19, 1979 Order regarding the allocation of the financial burden resulting from the March 28, 1979 accident at Three Mile Island Nuclear Station, Unit No. 2.

The following excerpt from the May 23, 1979 Order may be of interest.

"The basic conclusion of the Comission in this order is that Met Ed should continue to operate as a public utility.

The Commission will provide Met Ed the means of financial rehabilitation.

However, we will write no blank checks on its ratepayers.

We find that THI-1 is no longer used and useful and that the base rates of both Met Ed and Penelee should be reduced.

This order, with its provisions for a fully current recovery of energy costs and an accelerated amortization of deferred energy costs provides an adequate framework for Met Ed's recovery.

Respondent nust convince its bank creditors that it has the will and the ability to rehabilitate itself.

Above all, Met Ed must demonstrate candor and a willingness to address its problems and the initiative and ability to find solutions to those problems. The very real fears and concerns of its customers and neighbors nust be allayed.

Met Ed's cost must be reduced through load management and conservation-inducing rate structure change.

Met Ed must aggressively pursue the return to. service cf TMI-I or an early decision on its conversion to the use of an alternative fusi.

If these things are done, the Commission is confident that Met Ed will nct only survive but will regain its financial health.

8008)4o 5 0 5

Finally, we emphasize that this order does not end our regulatory The management investigation of the GPU Coapanies at Docket concern.

No. I-79080320 continues.

Further, we will continue to closely monitor the operations of~ Met Ed, Penelee and the GPU Conpanies to assure the continued provision of safe, adequate and reliable service to Pennsylvania ratepayers at reasonable rates."

While we are, of course, concerned about financial impacts on i.onsumers, the NRC's primary responsibility is the assurance of public health and safety.

State public utility comissions and the Federal Energy Regulatory Comission have primary responsibility regarding the financial aspects of electric pwer generation.

The former Atomic Energy Comission (AEC) had a Congressional mandate to develop and promote nuclear energy.

When the AEC was abolished in 1974, the NRC was created by Congress for the sole purpose of regulating the commercial production of nuclear energy. The U. S. Department of Energy (DOE) is now responsible for the Federal Government's nuclear research and development activities.

Consequently, coments and questions about the future of this energy source should be directed to that agency.

Your coments and interest in these matters are appreciated.

Sincerely,

&f

.G Robert W. Reid, Chief Operating Reactors Branch f4 Division of Licensing l

[

~

/

/

H a

h q