ML19331C251

From kanterella
Jump to navigation Jump to search
Forwards IE Investigation Rept 50-358/80-09 on 800407-09,30, 0501-02 & 20 & Notice of Violation
ML19331C251
Person / Time
Site: Zimmer
Issue date: 07/02/1980
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Borgmann E
CINCINNATI GAS & ELECTRIC CO.
Shared Package
ML19331C252 List:
References
NUDOCS 8008140463
Download: ML19331C251 (2)


See also: IR 05000358/1980009

Text

.

,

J~

># M4

UNITED STATES

9)g

NUCLEAR REGULATORY COMMISSION

{

S

REGION lli

f

799 ROOSEVELT ROAD

D

5

g

GLEN ELLYPe, ILLINOIS 60137

UUL

2 1980

.

Docket No. 50-358

-

"

r.

h[.g$

M

Cincinnati Gas and Electric

[

Company

b

ATTN:

Mr. Earl A. Borgmann

Vice President, Engineering

9

Services and Electric

Production

Sh

139 East 4th Street

Cincinnati, OH 45201

Gentlemen:

This refers to the investigation conducted by Messrs. G. A. Phillip,

K. D. Ward and T. E. Vandel of this office on April 7-9 and 30,

May 1-2 cnd 20, 1980, of activities at the Wm. H. Zimmer Nuclear Power

Station authorized by Construction Permit No. CPPR-88 and to the dis-

cussion of our findings with Mr. B. K. Culver and others at the conclu-

sion of the onsite portion of the investigation on May 2, 1980.

This investigation related to allegations concerning installed safety-

related piping. The enclosed copy of our investigation report identi-

fies areas examined during the investigation. Within these areas, the

investigation consisted of an examination of pertinent records and

procedures, independent evaluations and interviews with personnel.

During this investigation, certain of your activities appeared to be in

noncompliance with NRC requirements, as described in the attached

l

Appendix A.

This notice is sent to you pursuant to the provisions of Section 2.201

of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal

Regulations. Section 2.201 requires you to submit to this office within

thirty days of your receipt of this notice a written statement or expla-

nation in reply, including for each item of noncompliance:

(1) correc-

tive action taken and the results achieved; (2) corrective action to be

taken to avoid further noncompliance; and (3) the date when full com-

pliance will be achieved.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part

2, Title 10, Code of Federal Regulations, a copy of this letter, the

enclosures, and your response to this letter will be placed in the NRC's

-

Public Document Room, except as follows. If the enclosures contain

'

information that you or your contractors believe to be proprietary, you

'

must apply in writing to this office, within five days of your receipt

of this letter, to withhold such information frem public disclosure.

The application must include a full statement of the reasons ~for which

the information is considered proprietary, and should be prepared so

that proprietary information identified in the application is contained

in an enclosure to the application.

.8008140 %

pr-

-

Cincinnati Gas and Electric

Company

-2-

2 GCA

Wewillgladlydiscussanyquestionyouhaveconcerningthis}

investigation.

-

_.

Sincerely,

3

%'f

/

James G. Keppler

Director

Enclosures:

1.

Appendix A, Notice

of Violation

2.

IE Inspection

Report No. 50-358/80-09

cc w/encls:

Mr. J. R. Schott, Plant

Superintendent

Central Files

Reproduction Unit NRC 20b

PDR

Local PDR

NSIC

TIC

Harold W. Kohn, Power Siting

Commission

Citizens Against a Radioactive

Environment

Helen W. Evans, State of Ohio

l

l

-

l

,

?

l

l

l

l

l

[