ML19331C251
| ML19331C251 | |
| Person / Time | |
|---|---|
| Site: | Zimmer |
| Issue date: | 07/02/1980 |
| From: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Borgmann E CINCINNATI GAS & ELECTRIC CO. |
| Shared Package | |
| ML19331C252 | List: |
| References | |
| NUDOCS 8008140463 | |
| Download: ML19331C251 (2) | |
See also: IR 05000358/1980009
Text
.
,
J~
># M4
UNITED STATES
9)g
NUCLEAR REGULATORY COMMISSION
{
S
REGION lli
f
799 ROOSEVELT ROAD
D
5
g
GLEN ELLYPe, ILLINOIS 60137
UUL
2 1980
.
Docket No. 50-358
-
"
r.
h[.g$
M
Cincinnati Gas and Electric
[
Company
b
ATTN:
Mr. Earl A. Borgmann
Vice President, Engineering
9
Services and Electric
Production
Sh
139 East 4th Street
Cincinnati, OH 45201
Gentlemen:
This refers to the investigation conducted by Messrs. G. A. Phillip,
K. D. Ward and T. E. Vandel of this office on April 7-9 and 30,
May 1-2 cnd 20, 1980, of activities at the Wm. H. Zimmer Nuclear Power
Station authorized by Construction Permit No. CPPR-88 and to the dis-
cussion of our findings with Mr. B. K. Culver and others at the conclu-
sion of the onsite portion of the investigation on May 2, 1980.
This investigation related to allegations concerning installed safety-
related piping. The enclosed copy of our investigation report identi-
fies areas examined during the investigation. Within these areas, the
investigation consisted of an examination of pertinent records and
procedures, independent evaluations and interviews with personnel.
During this investigation, certain of your activities appeared to be in
noncompliance with NRC requirements, as described in the attached
l
Appendix A.
This notice is sent to you pursuant to the provisions of Section 2.201
of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal
Regulations. Section 2.201 requires you to submit to this office within
thirty days of your receipt of this notice a written statement or expla-
nation in reply, including for each item of noncompliance:
(1) correc-
tive action taken and the results achieved; (2) corrective action to be
taken to avoid further noncompliance; and (3) the date when full com-
pliance will be achieved.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part
2, Title 10, Code of Federal Regulations, a copy of this letter, the
enclosures, and your response to this letter will be placed in the NRC's
-
Public Document Room, except as follows. If the enclosures contain
'
information that you or your contractors believe to be proprietary, you
'
must apply in writing to this office, within five days of your receipt
of this letter, to withhold such information frem public disclosure.
The application must include a full statement of the reasons ~for which
the information is considered proprietary, and should be prepared so
that proprietary information identified in the application is contained
in an enclosure to the application.
.8008140 %
pr-
-
Cincinnati Gas and Electric
Company
-2-
2 GCA
Wewillgladlydiscussanyquestionyouhaveconcerningthis}
investigation.
-
_.
Sincerely,
3
%'f
/
James G. Keppler
Director
Enclosures:
1.
Appendix A, Notice
of Violation
2.
IE Inspection
Report No. 50-358/80-09
cc w/encls:
Mr. J. R. Schott, Plant
Superintendent
Central Files
Reproduction Unit NRC 20b
Local PDR
Harold W. Kohn, Power Siting
Commission
Citizens Against a Radioactive
Environment
Helen W. Evans, State of Ohio
l
l
-
l
,
?
l
l
l
l
l
[