Text
o nc,
.
o
UNITED STATES
j,
g
,
NUCLEAR REGULATORY COMMISSION
g
3,
g
REGION ill
y
- p
,
799 ROOSEVELT ROAD
Q
% . . . . ,d*g
GLEN ELLYN, ILLINOIS 60137
JUL
9 G80
.
Docket No. 50-346
Toledo Edison Company
ATTN:
Mr. Richard Crouse
Vice President - Nuclear
Edison Plaza
300 Madison Avenue
Toledo, OH
Gentlemen:
This refers to the inspection conducted by Mr. A. G. Januska of this office
on June 5, 1980, of activities at Davis-Besse Nuclear Power Station, Unit 1,
authorized by NRC Operating License No. NPF-3 and to the discussion of our
findings with Mr. D. Briden at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. The inspection consisted of a telephone discussion and
closeout of results of Confirmatory Measurements Samples collected during
a previous inspection.
No items of noncompliance with NRC requirements were identified during the
course of this inspection.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the en-
closed inspection report will be placed in the NRC's Public Document Room,
except as follows.
If this report contains information that you or your
l
contractors believe to be proprietary, you must apply in writing to this
l
office, within twenty days of your receipt of this letter, to withhold
l
such information from public disclosure. The application must include
a full statement of the reasons for which the information is considered
'
proprietary, and should be prepared so that proprietary information identi-
fied in the application is contained in an enclosure to the application.
l
!
1
.8008140L63
.
.
_
_
_
1
.
Toledo Edison Company
-2-
,
We will gladly discuss any questions you have concerning this
inspection.
'
'
Sincerely,
~
.
h
A. B. Davis, Chief
Fuel Facility and
Materials Safety Brench
Enclosure:
IE Inspection
Report No. 50-346/80-20
cc w/ enc 1:
Mr. T. D. Murray, Station
Superintendent
Central Files
Reproduction Unit NRC 20b
q
i
Local PDR
Harold W. Kohn, Power
Siting Commission
Helen W. Ev,'-<,
State
'
of Ohio
1