ML19331B890
| ML19331B890 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 08/08/1980 |
| From: | Hancock J FLORIDA POWER CORP. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| 3--3-A-2, 3-0-3-A-2, NUDOCS 8008130491 | |
| Download: ML19331B890 (2) | |
Text
_
~
~
M August 8, 1980 phgpygggy 3-0-3-a-2 CS-80-191 c a. n,..
.o.
Mr. J. P. O'Reilly, Director Docket No.
50-302 Office of' Inspection & Enforcement Licensee No. DPR-72 U.S. Nuclear Regulatory Commission Ref:
RII:JMP Atlanta, CA 30303 50-302/80-10
Dear Mr. O'Reilly:
4 We offer the following response to the apparent Item of Noncompliance in the referenced inspection report.
As required by 10 CFR 20.203(f) each container of licensed material shall
~
bear a durable, clearly visible label identifying the radioactive contents.
The label shall bear the radiation caution symbol and the words " CAUTION -
RADIOACTIVE MATERIAL" and shall provide sufficient information to permit individuals handling or using the containers or working in the vicinity thereof, to take pcecautions to avoid or minimize exposures.
Contrary to the above, bags of waste and drums of laundry, which were determined by the inspector to contain licensed material, were not marked with the appropriate labels.
Response: During the period on or about May 22, 1980, clear bags were used in lieu of yellow bags to contain radioactive materials because of a tempor-ary warehouse stock problem. These bags were placed in a posted lay-down area in the Auxiliary Building hot shop, but were not individually tagged. When identified by the inspector, the bags were tagged and shortly thereaf ter, the contents were transferred to yellow bags, in accordance with RP-217, Radioactive
!bterial Tagging.
Additionally, the inspector identified improperly marked drums of protective clothing thac had been returned from a vendor af ter cleaning. After identifi-cation, the " Radioactive LSA" markings were replaced with tags to be in accord-ance with 10 CFR 20.203(F).
Subsequent to the inspection, RP-217, Radioactive Material Tagging was revised to incorporate _ allowance for the use of clear-bags, if necessary.
The procedure now clearly states, "It is imperative that material so contained be. adequately tagged and segregated from non-radioactive material".
Further, a new section has been added to the procedure placing the requirement that protective clothing containers being returned from of fsite cleaning facilities shall be re-labeled Ax!
//C)
General Office 3201 wtyaourin street soum.P O Dos 14042 St Petersourg Florida 33733 813 866 5151
Notice of Violation Response - RII:JMP Page 2 in accordance with 10 CFR 20.203(F) as soon as the shipping container is opened.
The procedure was revised and the program implemented June 11, 1980.
1 Should you have further questions, please contact us.
Very truly yours, FL
.I POWER ORPORATION
. )h)(YE( -
J.)L. Hancock, Asst. Vice President
.,uclear Operations d
D. C. Poole Nuclear Plant Manager agllllll60cumentManagementBranch KFL/rc