| Site: | Fort Saint Vrain |
| Issue date: | 08/01/1980 |
| From: | Gahm J PUBLIC SERVICE CO. OF COLORADO |
| To: | |
| Shared Package | |
| ML19331B857 | List: |
| References | |
| NUDOCS 8008130420 | |
| Download: ML19331B858 (6) | |
Text
.
.3 TNTHLY OPERAftNC INMRMATION DISTRIBUTION
/(m
\\
/
Number o{ t" ies Di re c t o r - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
.0 (original of P Letter)
Of fice of Inspection and Enforcement C. S. Nuclear Rasulatory Commission Ashington, D.C.
20555 1
(P Letter)
Karl V. Seyfrit. Direct or Region IV Office of Inspection and Enforcement Muclear Regulatory Commission 611 Ryan Plass Drive Suite 1000 Arlington, Texas 76012-Di r e c t o r - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 2 (P Letter)
Office of Management Information and Program Control U. 5. Nuclear Regulatory Cocalission Washington, D.C.
20555 1
(P Letter)
Ted Cintula U. S. Nuclear Regulatory Commission 12105 National Maryland Bank Building Washington, D.C.
20555
- 7. Bushnell, Site Manage-1 (P Letter)
General Atomic Company P. O. Box 426 Platteville, Colorado 80651 NRC Resident Site Inspector 1
(P Letter)
Senior Vice Presidant. Room 770
1 (P Letter)
Vice President. Electrical Engineering ani Planning, 39th Avenus - - - - - - - - - 1 (P Letter)
" ice President Production Division. 3elieviev - - - -
- - - - - - - - - - - - - 1 (P Letter)
Quality Assurance Manager 1
(P Letter)
S ite En ginee ring Coo rdina to r - - - - - - - - - - - - - - - - - - - - - - - - - - - 1 (P Letter)
Nuclea r Proj ect Manage r. Montballo - - - - - - - - - - - - - - - - - - - - - - - - 1
(? Letter)
Cary Raeves, Public Relations. Room 950
1 (Original of Memo)
Sill Shinkle. Property Accounting, Holly Iervice Center 1
(Original of Memo)
Richard A. Petzke. Nuclear Project Depart annt. Montbello + - - - - - - - - - - - 1 (Original of Memo)
Supervisor Licensing and Administrative Services.
Nuclear Project Department. Montballo - - - - - - - - - - - - - - - - - - - - - 1 (P Letter)
Supervisor. Project Engineering. Nuclear Project Depart:: tent, Montballo - - - - - - 1 (P Letter)
Documents Control Technician, Montbello 2
(2 P Letters)
Correspondence Coordinator. Nuclear Project Department, Montballo 1
(? Letter)
Nuclear P roduction Mana ger - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1 (y legger)
O p e ra tio ns Mana ge r - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1 (P Letter)
Administrative Services Manager 1
(P Letter)
PORC Committee - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1 (P Letter)
PFiles--------------------------------------
1 (P Letter)
Re co rd S t o ra ge - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -.- - - - 2 (P Letter) 1 (P Letter)
Technical Services Review Technical Services Refe rence Notebooks - - - - -. - - - - - - - - - - - - - - - - 1 Monthly Operations Report Polder - - - - - - - - - - - - - - - - - - - - - - - - - 1 Monthly Ope rating Information File - - - - - - - - - - - - - - - - - - - - - - - - 0 (Original of Report and 1 Copy of P Letter)
Cas Coole d Re ac tor As s ocia tes- - - - - - - - -
- - - - - - - - - - - - - - - - 1 (P Letter)
Attenticut Mr. Dan Tueh 3344 North Torrey Pines Court
. Suite 300 L4Jolla, California 92037 Electric Powe r Rese arch Ins titute- - - - - - - - - - - - - - - - - - - - - - - - - 1 (P Letter)
Attention:
Mr. Melvin E. Lapides 3412 Hillview Avenue P. O. Sox 10412 hio Alto. California 94303 S008130 f
cetunse cA:A uPOR:
occxz; so.
50-267 DA 800801 ccxrtrito n J. W. Gahm
- ILEPH0xt (303) 785-2253 cPtunse s: Airs soirs 1.
Unit same:
Fort St. Vrain 2.
Reporting Period:
800701 through 800731
.3.
Licensed Thermal Power (st):
842 4
Nameplate Rating (cross We):
342 5.
Oesign Electrical Racing C:st We):
330 6.
Maximus :ependable Capac1:7 (cross We):
342 7.
Maximus :ependable Capacity (Net We):
330 3
3.
!! changes occur is capacity Ratings (Items Number 3 through 7) since Last Report, cive Reasons:
None f
4 7.
Power f.evel To Which Restricted. If Any (Net We): 231
?
- 10. 3easons for 5estrictions. If Any:
Nuclear Regulatorv Comission restriction 70%
pending resolution of temperature fluctuations.
This Monta Year to Date Cumulative n. acurs is a porti=g Peried' 744 5.111 9.528
- u. su=ner of sours asse:or was critical 698.3 3.723.7 6.256.5
- 13. Reactor Raseri. shu: deva sours 0.0 0.0 0.0
- 11. sours Generator on-Lia.
403.7 2.457.2 3.439.4
- 13. :nic Reserve shutd vn Hours 0.0 0.0 0.0
- 16. cross Thermal taargy cenerated (:.3) 163.303 1.132.594 1.610.549
- 17. cross nee:rical Energy ceserated (ws) 49,390 362.336 503.132 is. Nec nectrical Zsergy cenerated es.1) 42.780 333.107 456,691
- 11. :ait servie ractor 54.3%
48.1%
36.1%
- 3.
nic Availability Tactor 54.3%
48.1%
36.1%
- . tait capacity raetor (est=g x c set) 17.4%
- 19. 7':
14.5%
- . Unit capaci:y ractor (tsing :st res) 17.4%
19.7%
14.5%
- 23. Unit Tor:ed outage aate 45.7%
31.1%
46.1%
24 shu:devns scheduled over Nex: 6 Nachs ( ype. Date, and Duration of Iach): August 30 through September 30, complete reautred surveillance testing.
- 23. --If shut Ocwn at End Jf Iepor: Pericd Estiaated Date of Startu$ 3 N/A
- 6. :si:s !a :est sta:a (Prior to ccemercial Operation):
Torecast Achieved 13:nAL cuncA:.:n N/A N/A
- xInAL ILIcn:n n N/A N/A c:>esac:A:. cPIRAncs
'N/A N/A 4
- 1.,,
e
.LI.N.IT Slurl1EMtrl ANil IWER _REldK R.W, :1 Inicati mi.
50-267 im T NAME Fort St. Vrain siu E 800801 avranus my J. W. Gahm Tu.e s imine (303) 785-2253 unwr emerna _.luly, 1980.._,.
gg suomNc IM 4Al SYSTEM Clet'ONENT m8 BAA I E 1Yl'E t*NAtlON MEASON kFKrt
- 8.EM #
0814 0 81
- CAtBSE Anis O*NECTIVE ACTI(W 10 PNEVI'NT kel'UNRt38t'E B0-13 800708 F
3:19.9 11 3
N/A N/A N/A A reactor scram and turbine trip oc-curred due to simultaneous trip of all four circulators.
HO-14 800723 F
.4 11 N/A N/A N/A N/A Turbine tripped dim to low main steam pressure. I:cactor not sleut down.
SUMMA!!Y: Continue power generation at less than 70%
I w
AVERAGE DAILY UNIT POWER LEVEL Docket No.
50-267 Unit Fort St. Vrain Date 800801 Completed By J. W. Gahm Telephone (303) 785-2253 Month Julv, 1980 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (We-Ne t)
(3ge-Net) 1 87 17 2 iO8 13 3 112 19,
4 93 20 3 106 21 6 114 22 13 7
135 23 79 a
23 24 119 9 25 120 10 26 120 11 27 120 12 28 130 13 29 148
.14 30 132 15 31 123 16
- Generator on line but no net generation.
REFUELING -INFORMATION 1.
Name of ' Facility.
Fort St. Vrain, Unit No. 1 2.
Scheduled date for next refueling shutdown.
June 1, 1981 3.
Scheduled date for restart following refueling.
September 1. 1981 4.
- Jill refueling or resumption of operation thereafter require a technical specification change or other license amendment?
No If answer is yes, what, in general, will these be?
I If answer is no, has the reload The Plant Operations Review Committee will fuel design and core configura-review any questions associated with the tion been reviewed by your Plant core reload.
Safety Review Consittee to deter-j mine whether any unreviewed i
safety questions are associated
}
with the core reload (Reference 10CFR Section 30.59)?
I If no such review has.taken place when is it scheduled?
Januarv 1,1981 5.
Scheduled date(s) for submitting proposed licensing action and supporting information.
6.
Important licensing considera-tions associated with refueling, e.g., new or different fuel de-sign or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating pro-cedures.
f 7.
The number of fuel assemblies a) 1482 HIGR fuel elements (a) in the core and (b) in the spent fuel storage pool.
b) 130 spent HTGR fuel elements 8.
The present licensed spent fuel Capacity is limited in size to about one-pool storage capacity and the third of core (approximately 500 HTGR ele-size of any increase in licensed ments). No change is planned.
storage capacity that has been
. requested or is planned, in
' number of fuel assemblies.
REFUELING INFORMATION (CONTINUED) 9.
The projected date of the 1986 under the Three Party Agreement (Con-last refueling that can be tract AT (04-3)-633) between DOE, Public discharged to the spent fuel Service Compacy of Colorado (PSCo), and pool assuming the present General Atomic Company.*
l licensed capacity.
- The 1986 date is based on the understanding that spent fuel discharged during the term of the Three Party Agreement will be shipped to the Idaho National Engineering Laboratory for storage by DOE at the Idaho Chemical Processing Planc (ICPP). The storage capacity has evidently been sized to accomodate fuel which is expected to e
be discharged during the eight year period covered by the Three Party Agreement.
4 e
s