Advises of Review of Proposed Full Power License.Change Recommended to Tech Spec 3.0.3 Re Limiting Condition for Operation
ML19331B721
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 08/07/1980
From: Christenbury E
NRC OFFICE OF THE EXECUTIVE LEGAL DIRECTOR (OELD)
To: Mattson R
Office of Nuclear Reactor Regulation
References
NUDOCS 8008120663
Download: ML19331B721 (1)


Text

8 o

UNITED STATES

~,,

[

g NUCLEAR REGULATORY COMMISSION E

WASHINGTON, D. C. 20S55 g

August 7,1980 T77 W

6[O, p 3 MEMORANDUM FOR: Roger J. Mattson Director of Safety Technology Office of Nuclear Reactor Regulation FROM:

Edward S. Christenbury Chief Hearing Counsel 3ffice of the Executive Legal Director

SUBJECT:

FORM 0F SEQUOYAH FULL POKER LICENSE We have previously reviewed and worked with Jack Wetmore of your office in developing the Sequoyah full power license. We are continuing to work with the project management staff to assure that the license is supported by the safety evaluation and, contains those conditions and technical specifications required by that evaluation.

We have previously reviewed this proposed license and would make one additional change in the technical specifications, to have section 3.0.3 read:

When a Limiting Condition for Operation is not met, except as provided in the associated ACTION requirements, the unit shall be placed in a MODE in which the Specification does not apply, or_ by placing it, as applicable in...

Further, we continue to believe that the terms P-3, P-4, P-5, etc. should be defined or reference made to documents where the meaning of those notations appear.

We sincerely appreciate the cooperative efforts of Jack Wetmore in working to make this license a model from the points of view of clarity and enforce-at,ility as the Commission asked.

Edward S. Christenbury[

Chief Hearing Counsel Office of the Executive Legal Director 8 0 0812 0 6 G 3 l