ML19331B608

From kanterella
Jump to navigation Jump to search
Forwards LER 80-083/03L-0
Date released: 12/11/2019 Download: ML19331B608


LER 80-083/03L-0:on 800713,w/reactor Mode Switch in Run Mode at Power Level of 2241 Mwt,Surveillance Procedure HNP-1-3103 Not Performed within Required Grace Period.Caused by Personnel Error.Surveillance Immediately Performed
ML19331B626
Person / Time
Site: Hatch 
Issue date: 08/05/1980
From: Nix R
GEORGIA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19331B626 (2)
Forwards LER 80-083/03L-0
ML19331B607
Person / Time
Site: Hatch 
Issue date: 08/05/1980
From: Manry M
GEORGIA POWER CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19331B607 (1)