ML19331B518

From kanterella
Jump to navigation Jump to search

Forwards 800730, Amended Licensed Operator Requalification Program, Revision 1 & Control Operator Training Program, Revision 1
ML19331B518
Person / Time
Site: Point Beach  
Issue date: 08/07/1980
From: Fay C
WISCONSIN ELECTRIC POWER CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML19331B519 List:
References
TASK-1.A.2.1, TASK-2.B.4, TASK-TM TAC-44188, TAC-44189, TAC-44538, TAC-44539, NUDOCS 8008120382
Download: ML19331B518 (1)


Text

'

a-4 s

j WISCONSIN Electnc mm cwmr 231 W. MICH4AN, P.O. B012046. MILWAUKEE. WI 53201 August 7, 1980 Mr. Harold R.

Denton, Director Office of Nuclear Reactor Regulation U. S. NUCLEAR REGULATORY COMMISSION Washington, D.

C.

20555

Dear Mr. Denton:

DOCKET NOS. 50-266 AND 50-301 QUALIFICATION OF REACTOR OPERATORS POINT BEACH NUCLEAR PLANT UNITS 1 AND 2 Your letter dated March 28, 1980, provided revised criteria to be used by the NRC Staff in evaluating reactor operator training and licensing. to that letter detailed the revised criteria and specified effective dates for their implementation.

The topic of licensing examinations and the requirements of your March letter were subsequently incorporated by reference into the "Five Additional TMI-2 Related Requirements To Operating Reactors" promulgated by Mr. Eisenhut's letter dated May 7, 1980.

On June 11, 1980, we responded to the May 7 letter and committed to providing revised descriptions of the control operator training program and the licensed operator requalification program for the Point Beach Nuclear Staff by August 1, 1980.

These descrip-tions are provided in the enclosures to this letter.

As mentioned in our June 11 letter, it is empha-sized that these enclosures, the " Amended Licensed Operator Requalification Program" and the " Control Operator Training Program", are interim revisions and subject to change.

The uncertainty and changing training requirements, staffing requirements, and suggested program guidelines have made it impossible for us to finalize these programs for your review at this time.

Should you have any questions regarding these interim program descriptiona, please let us know.

Very truly yours,

$UA C. W. Fay, Director b

Nuclear Power Division

[

Attachments Copy to NRC Resident Inspector Point Beach Nuclear Plant

/

8008120, p s z