ML19331B512

From kanterella
Jump to navigation Jump to search
Forwards Final Startup Testing Rept Covering Testing & Results of Fuel Loading Through Power Testing Up to 100% Power & Warranty Demonstration
Date released: 12/11/2019 Download: ML19331B512


Final Startup Testing Rept.
ML19331B513
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 10/04/1979
From: Tehranchi F
GEORGIA POWER CO.
To:
References
Download: ML19331B513 (756)
Forwards Final Startup Testing Rept Covering Testing & Results of Fuel Loading Through Power Testing Up to 100% Power & Warranty Demonstration
ML19331B511
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 10/02/1979
From: Manry M
GEORGIA POWER CO.
To: OREILLY J P, STELLO V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
Download: ML19331B511 (1)