PM-79-899, Forwards Final Startup Testing Rept Covering Testing & Results of Fuel Loading Through Power Testing Up to 100% Power & Warranty Demonstration
| ML19331B511 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 10/02/1979 |
| From: | Manry M GEORGIA POWER CO. |
| To: | James O'Reilly, Stello V NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| Shared Package | |
| ML19331B512 | List: |
| References | |
| PM-79-899, NUDOCS 8008120372 | |
| Download: ML19331B511 (1) | |
Text
Gecrgia Power Cornsany Pest Olnen Gor 442 s
,w Bamicy.Georqu3 5 3 Telephort'Jld 3t3a./ /tlI 912$37 9444 L
Georgia Power Edwin t. Hatch Nuchar Plant the sotthctn ecctre sys:cm October 2,1979' PM-79-899 PLANT E. I. HATCH
~~
Hatch 2 Startup Test Report Mr. James P. O'Reilly Region II, USNRC Office of Inspection and Enforcement 230 Peachtree St. NW., Suite 1217 Atlanta, Georgia 30303 Mr. Victor Stello' c/o Distribution Services Branch, DDC, ADM U.S. Nuclear Regulatory Comission Washington, D.C.
20555 Office of Management Info, and Program Control U S. Nuclear Regulatory Commi.ssion
.NPIC Washington, D.C..
20555
Dear fir:
Please find enclosed the final submitted portion of the HNP-2 Startup Testing Report.
This portion of the Startup Testing Report ccvers the testing and results of fuel loading through pcwer testing up to 100*.' powar and the Warranty demnstration.
This submittal completes the startup testing report require-ments of the Technical Specifications.