Responds to NRC Re Violations Noted in IE Insp Repts 50-387/79-31 & 50-388/79-16.Corrective Actions:Issued Nuclear Dept Instruction 1.2 Revision 0, Mgt of Plant Mods & Repair Per ASME B & PV Code
ML19330C539
Person / Time
Site: Susquehanna  
Issue date: 06/13/1980
From: Sabol A
PENNSYLVANIA POWER & LIGHT CO.
To: Robert Carlson
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML19330C532 List:
References
PLA-493, NUDOCS 8008080476
Download: ML19330C539 (2)


Text

.

-+

7 PP&L T WO N o R T H NIN T H ST R E E T, AL L E N tow N, PA. 18101 P H o N E: (2 6 5) 8 21 5151 I

)

I June 13, 1980 Mr. Robert T. Carlson Chief RC &'ES Branch U. S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406 SUSQUEHANNA STEAM ELEX:TRIC STATION NRC INSPECTION OF SEPTEMBER 10-OCTOBER 5, 1979 REPORT NOS. 50-387/79-31 AND 50-388/79-16 ERs 100450/100508 FILE 840-4 PLA-493

Dear Mr. Carlson:

Reference is to your letter of January 18, 1980 which forwarded combined Inspection Reports 50-387/79-31 and 50-388/79-16 and PP&L's response thereto (Ref. PLA-456 dated February 29, 1980).

In PLA-456 we committed to conduct a review of our system for managing modifi-cations such as the one performed on the recirculation risers and to provide a description of how PP&L coordinates its activities for accomplishing such work.

As a result of the review, PP&L has concluded that its original approach, which consisted of management directives via internal correspondence, required clearer and broader guidance. Therefore, PP&L has prepared and issued Nuclear Department Instruction (NDI) 1.2, Revision 0, Management of Plant Modifications and Repair Under the ASME B&PV Code. This procedure, which responds to (Draft) QA Manual procedure SP-14, Rev. A, Modification Control, describes the responsibilities of key managers and provides direction for the accomplishment of those responsibili-ties in support of modifications to systems, equipment and components. NDI 1.2 has been approved by upper management and will be the basis for accomplishing future modifications to ASME code items.

Although we had originally planned to respond to your concern by March 31, 1980, it took longer than expected to address and resolve this issue due to the press of other priorities and for processing the procedure through PP&L's formal review and approval cycle. However, all work that should have been controlled by NDI 1.2 was held in abeyance until the procedure was approved for use on the project.

We trust the Commission will find the actions taken to resolve the concern expressed in your January 18, 1980 letter are adequate.

Very truly yours, A. R. Sa 1 Manager-Nuclear Quality Assurance P E N N S Y LV A NI A POWER & LIGHT Co AP ANY 8003060.9l&

r:

i,,:.

,._.4':.

8' Mr. Robert T.-Carlson

-2.

June 12, 1980 CIM:meb

'cc:

Mr.. Robert M. Gallo D. S. Nuclear Regulatory Commission.

P..O. Box 52 Shickshinny, Pennsylvania 18655 i

4 l