Interim Deficiency Rept Re Concrete Block Walls in Control Bldg.Affected Walls Removed Except Main east-west Walls, Whose Replacement Determined Not Necessary If Addl Stiffeners Added.Wall Const to Be Completed by 801001
ML19330C508
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 06/27/1980
From: Koester G
KANSAS GAS & ELECTRIC CO.
To:
References
NUDOCS 8008080445
Download: ML19330C508 (1)


Text

r 7.zo KANSAS GAS AND EUCTM COWANY QLtrere L. motSTtr' vict petssment.opemarious June 27, 1980 Mr. W.C. Seidle, Chief Reactor Construction and Engineering Support Branch U.S. Nuclear Regulatory Conunission Region IV 611 Ryan Plaza Drive

' Suit'e 1000 '

Arlington, Texas 76012 KMLNRC-009 RE: Docket No. 50-482 Subj: Interim Repor^ Transmitted 1/24/80 and Updated by letter of 4/30/80, both transmitted to W.C. Seidle by G.L. Koester

Dear Mr. Seidle:

The referenced report concerning concrete block walls in the Control Building at Wolf Creek was previously submitted to your office pursuant to 10CFR50.55(e). A description of the deficiency, an analysis of the safety implications and details of the initial corrective actions proposed or taken were included in the Interim Report.

l This letter further updates O e status of actions completed and new being taken in regard to the concrete block walls. All affected walls as identified in Nonconformance Report 1NN-1536-C have been removed )

with the exception of the main east-west wall and its connecting duct chase located on column line C-5 at elevation 1984'-0, the main east-west wall and its connecting duct chase located adjacent to column line C-5 at elevation 2000'-0, and the duct chase located on column line C-5 at elevation 2032'-0. Bechtel has analyzed the three walls and has determined that their replacement is not necessary, provided additional stiffners are added. Design of these ad4hiotal stiffners was completed in late June,1980, and their insta'J a. ion is proceeding.

Completion of the installation of the additJ;n,1 9, fners and recon-struction of the removed concrete block wallb is c 4.ently scheduled for October 1,1980. At that time a final report will be prepared and submitted; or, if further work remains, an update on the p c gram will be made. In the interim, please advise if you need additional information. l l

g Yours very truly,