{{#Wiki_filter:G D (f NSSS EQUIPIENT QUALIFICATION STATUS

SUMMARY

PHASE I: Evaluation of GE Supplied Documents Evaluation has been completed for the equipment for which G.E. provided documents on March 1, 1980. The results of this evaluation are: 1. Identified additional data needed from G.E. 2. Prepared a list of NSSS equipment for NRC-SQRT. 3. Identified difficiencies in the reports provided. PHASE II: Upgrading Qualification Reports By Analytical Techniques (Progress report of Phase II work is attached). About 75% of this work has been completed as of 7/25/80. Balance of the work is in progress. On a few pieces of the equipment, effort is being made to get additional information for completion of the qualification. Passive devices having difficient test reports are being qualified analytically by analysis. PHASE III:' Upgrading Qualification By Testing We are in the process of identifying equioment and devices needing retest.. Test program is being initiated. This program is' expected to be completed by September,.1980. 8'O08080

I e PHASE'IV:- Modifications This work has not been initiated when equipment does not meet the applicable loading conditions suitable modifications will be studied. PHASE V: ' Equipment Replacement This will be done only: 1. If equipment is capable of withstanding applicable loads 2. If new qualification is more than the price of a new qualified equipment. PHASE VI: Licensing Activities SQRT' documentation is being done as and when equipment qualification is completed. ( \\ e

~ SARGENT & LtnY ""l1"5!"' 8 \\ LA SALLE COUNTY NUCLEAR STATION NSSS EQUIPMENT QUALIFICATION PROGRESS REPORT I> 8-1-80 REV. 2 i: E i h

NSSS EQUIPMENT QUALI ^ ^fl0N PROGRESS REPORT I ) m V.,! LaSalle County - 1 & 2 Rev.: 2 Project No. 6093-00 Date: 8-1-80 I Equipment Data Evaluation l of Requalification ' Number Name Location CE DOCUMENTS Status Remarks B21-D002 Condensing Chamber Region PC-1 a) Stress Report meets a) New analysis using Completed

  1. 136B2798 1971 Code requirements.

PIPSYS loads performed. Model #225A6361 b) New Load evaluation b) Documentation com-not received

pleted, c) SQRT forms completed.

~ B21-D004 Condensing Chamber Region PC-1 a) Stress Report meets

  1. 136B2798 1971 Code requirements.

Model #225A6361 b) New Load evaluation not received I ll B21-DO06 Condensing Chamber Region PC-1 a) Stress Report meets o l

  1. 136B2798 1971 Code requirements.

l Model #225A6361 b) New Load evaluation not received B21-D007 Condensing Chamber Region PC-1 a) Stress Report meets

  1. 136B2798 Model #225A6361 1971 Code requirements.

b) New Load evaluation not received ) n B21-D008 Condensing Chamber Region PC-1 8, a) Stress Report meets

  1. 136B2798 1971 Code requirements'.

Model #225A6361 b) New Load evaluation not received 1 i /

s__ b] NSSS EQUIPMENT 034 ION PROGRESS REPORT LaSalle County - 1 & 2 Rev.: 2 Project No. 6093-00 Date: 8-1-80 Equipment Data Evaluation h of Requalification Number Name Location CE doi UMENTS Status Remarks B21-D009 Condensing Chamber Region PC-1 a) Stress Report meets a) New analysis using Completed.

  1. 136B2798 1971 Code requirements.

PIPSYS loads performed. M del #225A6361 b) New Load evaluation b) Documentation com-l P eted. not received c) SQRT forms completed. B21-F013A 6x10 Relief Valve Region PC-5 on a) Latest test reports Requalification yet (Crosby) + Valve Piping Sub-on modified valves to be done.

Operator, system submitted.

(MS-4) B21-F013B 6x10 Relief Valve Region PC-5 on a) Latest test reports ' Crosby' + Valve Piping Sub- 'on modified valves Operator system submitted. (MS-1) l B21-F013C ~6x10 Relief Valve Region PC-5 on a) Latest test reports ' Crosby ' + Valve Piping Sub-on modified valves Operator system submitted. (MS-3) is B21-F013D 6x10 Relief Valve Region PC-5 on a) Latest test reports l ' Crosby' + Valve Piping Sub-on modified valves Operator system submitted. (MS-2) 1 \\ a i

.~ o. _..m._ ,1 NSSS EQUIPMENT QUALI = ION PROGRESS REPORT LaSalle County - 1 & 2 Rev.: 2 Project No. 6093-00 Date: 8-1-80 Equipment Data Evaluation ~' l of Requalification Number Name Location CE DOCUMENTS Status Remarks B21-F013E 6x10 Relief Valve Region PC-5 on a) Latest test reports Requalification yet to be ' Crosby' + Valve Piping Sub-on modified valves done. Operator system submitted. (MS-3) B21-F013F 6x10 Relief Valve Region PC-5 on a) Latest test reports ' Crosby + Valve Piping Sub-or modified valves Operator system submitted. (MS-2) is B21-F013G 6x10 Relief Valve Region PC-5 on a) Latest test, reports ~ ' Crosby' + Valve Piping,Sub- .on modified valves g Operator system submitted. (MS-4) I i B21-F013d 6x10 Relief Valve Region PC-5 on a) Latest test reports ' Crosby' + Valve Piping Sub-on modified valves Operator system submitted. (MS-4) n f B21-F013J 6x10 Relief Valve Region PC-5 on a) Latest test reports ' Crosby' + Valve Piping Sub-on modified valves Operator. system submitted. (MS-1) e IL_

o NSSS EQUIPMENT QUALI: JION PROGRESS REPORT LaSalle County - 1 & 2 Rev.: 2 Project No. 6093-00 Date: 8-1-80 Equipment Data Evaluation of Requalification Number Name Location' j, GE DOCUMENTS Status Remarks 'B21-F013? 6x10 Relief Valve Region PC-5 on a) Latest test reports Requalification yet to be 'Cros by ' + Valve Piping Sub-on modified valves done. Operator system submitted. (MS-2) B21-F013L 6x10 Relief Valve Region PC-5 on a) Latest test reports ' Crosby' + Valve Piping Sub-on modified valves Operator ~ system submitt'ed. (MS-3) B21-F013M 6x10 Relief Valve Region PC-5 on a) Lates.t test reports ' Crosby ' + Valve Operator ~ Fiping Sub- 'on modified valves system submitted. (MS-2) s B21-F013N 6x10 Relief Valve Region PC-5 on a) Latest test reports ' Crosby' + Valve Piping Sub-on modified valves Operator system submitted. (MS-3) n B21-F013P 6x10 Relief Valve Region PC-5 on a) Latest test reports ' Crosby' + Valve n modified valves Piping Sub-Operator

  • system submitted.

(MS-1) b

o NSSS EQUIPMENT-QUAL ION PROGRESS REPORT j ) t LaSalle County - 1 & 2 Rev.: 2 Project No. 6093-00 Date: 8-1-80 p Equipment Data Evaluation of Requalification Number Name Location CE DOCUMENTS Status Remarks B21-F013R 6x10 Relief Valve Region PC-5 on a) Latest test reports Requalification yet to be ' Crosby ' + Valve Piping Sub-on modified valves done. Operator system submitted. (MS-3) B21-F013S 6x10 Relief Valve Region PC-5 on a) Latest test repcrts ' Crosby' + Valve Piping Sub-on modified valves Operator system submitted. ~ (MS-2) ~ B21-FO13U 6x10 Relief Valve Regioa PC-5 on a) Latest test reports ' Crosby' + Valve Piping Sub-on modified valves Operator system submitted. (MS-4) l B21-F013V 6x10 Relief Valve Region PC-5 on a) Latest test reports 'Cros by ' + Valve Piping Sub-on modified valves Operator system submitted. (MS-1) n B21-F022A 26" Globe Valve-Region PC-5 on a) Ociginal qualification

1. Requalification work Rockwell 1612JMNTY Piping Sub-is not adequate.

proceeding.

2. Additional information system b) Operability not I

(MS-1) requested. adequately addressed.

3. Test data received.

h 1. x_

o NSSS EQUIPMENT QUALI ]J ION PROGRESS REPORT LaSal' e County - 1 & 2 Rev.: 2 l Project No. 6093-00 Date: 8-:-30 1 ~ Equipment Data Evaluation of Requalification Number Name Location GE DOCUMENTS Status Remarks B21-F022B 26" Globe Valve-Region PC-5 on a) Original qualification

1. Requalification work Rockwell 1612JMNTY Piping Sub-is not adequate, proceeding.

system b) Operability not "~ requ sted.* adequately addressed.

3. Test data received.

B21-F022C 26" Globe Valve-Region PC-5 on a) Original' qualification Rockwell 1612JMNTY Piping Sub-is not adequate. b) Operability not 3 adequately addressed. B21-F022D 26" Globe Valve-Region PC-5 on a) Original qualification Rockwell 1612JMNTY Piping Sub-is not adequate. {sem b) Operability not adequately addressed. 4 B21-F028A 26" Globe Valve-Region RB-6 on a) Original qualification Rockwell 1612JMNTY Piping Sub-is not adequate. system' b) Operability not (MS-5) adequately addressed. n B21-F028B 26" Globe Valve-Region RB-6 on a) Original qualification Rockwell 1612JMNTY Piping Sub-is not adequate. system n (MS-6) b) Operability not adequately addressed. l m

m - - -- v ..._.s_.._-~ NSSS EQUIPMENT QUALIFI T N PROGRESS REPORT Rav.: 7 LaSalle County - 1 & 2 Project No. 6093-00 Date: 8-1-80 Equipment Data Evaluation j of Requali'fication Number Name Location GE Documents Status Remarks B21-F028C 26" Globe Valve-Region RB-6 on a) Original qualification

1. Requalification work Rockwell 1612JMNTY Piping Sub-is not adequate.

proceeding, . AddMonal infomation system b) Operability not i adequately addressed. 3. s received. B21-F023D 26" Globe Valve-Region RB-6 on a) Original qualification Rockwell 1612JMNTY Piping Sub-is not adequate. b) Operability not 8 adequately addressed. B21-K613A/B Power Supply Region CR-1 Report would meet our

1. Qualification & Docu-
  1. 159C4487 on Panels requirements if mentation completed.

C@M GE Model 9T66Y987 A-H13-P612

a. Test Duration is 2.

SQRT form completed. B-H13-P613 obtained.

b. Resonance Search
3. Used qualification Results are obtained.

document.for C61-POOL B21-N004A Temp. Element Region PC-4 Original Report is

a. New analysis done.

H,J/N,R,S, 'Pyco' #133D9679 Locally mounted adequate.

b. Documentation com-P,U,V Model #16-5079 on pipe.

pleted.

c. SQRT form completed.

B21N005 Flow Element Region PC-4 No Qualification Report

a. Analysis performed to A/D
  1. 21A9336AK Locally mounted Provided.

show structural integ-on pipe. rity. b. Documentation & SQRT form completed.

.ar-* ^ NSSS EQUIPMENT QUALI; 3 ION PROGRESS REPORT a LaSOlle County - 1 & 2 Rev.: 2 Project No. 6093-00 Date: 8-1-80 Equipment Data Evaluation of Requalification Number Name Location GE DOCUMENTS Status Remarks B21-N015A/D Pressure Twitch Region TB-1 a) Malfunction Test exceed 'Barksdale' #164C5359 Locally mounted our 'g' level require-Model #B2T-M12SS on pipe. ments by a big margin. May need retesting. b) Qualification tests meet our requirement in freq. range of0 0-33Hz.

  • l B21-N020A/D Pressure Switch Region RB-2 a) Malfunction Test exceed

'Barksdale' #164C5359 El. 761' on our 'g' level require-Model #B2T-M12SS Panels ments by a big margin. A-Il22-P004 b) Qualification tests B-ll22-P027 meet our requirement C-II22-P005 in freq. range of D-Il22-P026 0-3311z. B21-N023A/D Pres'sure Switch Region RB-2 a) Malfunction Test exceed 'Barksdale' #164r.5359 El 761' on ,our 'g' level require-Model #B2T-M12SS Panels ments by a big margin. A-Il22-P004 b) Qualification tests B-II22-PC27 meet our requirement C-Il22-P005 in freq. range of l D-II22-P026 0-33Hz. B21-N024A/D Level Indicator Switch Region RB-2 a) GE Documents are not a) BOP Equipment 'Barton' #159C4384 El. 761' on adequate. , Qualification Completed Model #288A Panels EMD #007919 A-II22-P004 qualify for NSSS B-Il22-P027 application. C-Il22-P005 b) SQRT form completed. D-Il22-P026 B21-N026A/F Level Indicator Trans. Region RB-2 a) GE Documents do not Switch El. 761' on show result::. May need retesting. 'Barton' #159C4383 Panels b) It is not adequate. Model #760 A-Il22-P004 B-Il22-P027 C-II22-P005 D-Il22-P026 i

. _ ~._.._ .... _ _. _ _ _ _ _ _ _ _ _ i _u.-- ~') NSSS EQUIPMENT QUALIF ON. PROGRESS REPORT LaSalle County - 1 & 2 Rev.: 2 Project No. 6093-00 Date:__ 8,1-80 Equipment Data Evaluation b of Requalification l Number-GE Documents Status Remarks Name Location k B21-N027 Level Trans. Region RB-2

1) 'g' levels adequate
1) BOP reports meet our EMD File

'Rosemount' #163C1560 El. 761' on require ents.

  1. 18299
2) High frequency Similar to 145C3240 Panel !!22-P027
  1. 14965 concerns not addressed.

Model #1151DP b). Documentation completed.

  1. 005769 c) SQRT form completed.

Completed 321-NO31A/D Level Indic. Switch Region RB-2 a) GE Documents are a) BOP Equipment Qualifi-Completed 'Barton' #159C4384 El. 761' on not adequate. cation EMD #007919 Model #288A Panels qualify for NSSS H22-P00/. -A,C application. !!22-P005-B,D b) SQRT form completed. f B21-N048A/D Pressure Switch Region RB-2 a) Switches were not a) BOP report qualifies Completed ' Static-O-Ring' El. 761' on pressurized. this device.

  1. 145C3012 Panels b) SQRT forms completed.

b) lligh frequency con- -Mode 1 #12N ll22-P026A,C 4 H22-P027B,D l i B21-NO32 Diff. Presas Trans. Region RB-8 a) 'g' levels adequate a) BOP reports meet our EMD 7ile 'Rosemount' #163C1560 El. 710'0" on .requ rements.

  1. 18299 b) Hi@ frepq m-Similar to 145C3240 Panels H22-P009

.b) Documentation completed.

  1. 14965 cerns not addressed.

Model #1152DP

  1. 005769 c) SQRT r.orms completed.

Completed e_ B21-NO33A/D Flow Trans. Region RB '.' a) 'g' levels adequate EMD File 'Rosemount' #163C1560 El. 71s on Similar to #145C3240 Panels b) liigh frequency con-

  1. 18299 cerns not addressed.
  2. 95 Model #11$2DP ll22-P009-B,D ll22-P010-A,C Completed I

~

3 NSSS EQUIPMENT QUALIFIM N PROGRESS REPORT Rev.: 2 LaSalle County - 1 & 2 Date: 8-1-80 Project No. 6093-00 1 ~ Evaluation Equipment Data of Requplification Nbmber Name Location GE Documents Status Remarks B21-NO34A/II, Flow Trans. Region RB-8 a) 'g' levels adequate a) BOP reports meet our EMD File J/N, P, R/W 'Rosemount' #163C1560 El. 710' on requirements.

  1. 18299 NE

'"9"*"*I * "~

  1. 14965 Similar to #145C3240 Panels ce ns n t addressed.

O Documentation,com-

  1. 005769 Model #1152DP H22-P009 l

P eted. Il22-P 010A,C, E,G, I Capleted H,L,N,R,T,V c) SQRT form completed. f B21-NO36A/D Level Indic. Switch Region RB-2 GE document indicates that May'need replacement 'Yarway' #159C4445 El. 761'0" on this device failed in all device and retesting. Similar to #145C3031 Panels tests. Model #4418C H22-P026 A,B (Different tests were H22-P027 C,D conducted). i B21-NO37A/D Level Indic. Switch Region RB-2 CE documents not a) BOP equipment 'Barton' #159C4384 El. 761'0" on adequate. qualification cmpleted. Model #288A Panels EMD #007919 I!22-P026 A,C qualify for NSSS H22-P027 B,D application. b) SQRT forms completed. i B21-NO38A/r, Level Indic. Switch Region RB-2 CE documents not _a) BOP equipment 'Barton' #159C4384 El. 761'0" on adequate. qualification Completed. Model #288A Panels EMD #007919 ~ Il22-P026 A qualify for NSSS H22-P027 B application. b) SQRT forms completed. B21-NO39A/li, Pressure Switch Region RB-2 a) Malfunction test exceed J/N, P, R/0,'Barksdale' #164C5359 E1. 761'0" on our 'g' level require-May need retesting. U, V Model #B2T-A12SS Il22-P026 ments by a big margin. b) Qualification tests mee our requirements in (. frequency range of 0-33Hz. /

NSSS EQUIPMENT QUALIFT ON PROGRESS REPORT g Rev.: 2 LaSalle County - 1 & 2 ' Project No. 6093-00 Date: 8-1-80 I I Evaluation Equipment Data of Requalification c-Documents Status Remarks Number Name Location B21-N044A/B Level Indic. Trans. Region RB-8 a) GE document do not show May need retesting. This is to be Switch El. 710' on results checked out 'Bart n' #159C4383 Panels b) It is not adequate. Model #760 ll22-P009 B / Il22-P010 A i B21-N045A/D Pressure Switch Region RB-2 a) Malfunction test exceeds May need retesting. 3 'Barksdale' #164C5359 El. 761' on our 'g' level require-

  1. B2T-A12SS Psnels ments by a big margin.

i Il22-P026 A.B b) Qualification tests' il22-P027 C,D meet our requirements h in frequency range of

0. 3311z.

j -{ i B21-N047A/D Pressure Switch Region RB-2 a) Switches were not a) BOP report qualifies p f ' Static-O-Ring' El. 761' on pressurized. this device. Completed {

  1. 145C3012 Panels b) SQRT forms completed.

b) liigh frequency concerns Model #12N ll22-P004 A,C l Il22-PG oS B,D i t l d I

  • B21-N051A/B Press,ure Trans.

Region RB-2 Test report may be a) Justification showing ' Bailey Meter' El. 761' on adequate. , adequacy done. Completed '

  1. 163C1292 Pancis b) SQRT forms completed.

Model #KG556 Il22-P004 A,C, Il22-P027 B,D B21-N056A/D Vacuum Switch Region TB-1

1. Resonance Search test Retesting may be j;

'Barksdale' #163C1855 Locally mounted - Qualification test necessary. 1 Similar to #145C3046

!odel #DIT-lll8SS
3. Fragility test.

, L. i ~ .n .,,w---:..,._. --w

A W @. NSSS EQUIPMENT QUALIF""" YON PROGRESS REPORT LaSalle County - 1 & 2 Rev.: 2 Project No. 6093-00 Date: 8-1-80 r-t j Equipment Data Evaluation of Requalification F GE Documents Status Remarks Number Name Location 1 B21-N060G,P, Pressure Switch Region RB-8 a) Malfunction test exceeds CC, PP 'Barksdale' #164C5359 El. 710' on our 'g' level require-May need retesting. i Model #B2T Pane ls ments by a big margin. H22-P075 b) Qualification tests Il22-P076 meet our requirement in frequency range of 0-3311z. 'fB21-N061B, Pressure Switch Region RB-8 a) Malfunction test exceeds G,H,J, 'Barksdale' #164C5359 El. 710' on our 'g' level require-May need retesting. K, L, P. Model #B2T Panels ments'by a big margin. BB,CG, II22-P075, b) Qualification tests Hil, JJ, !!22-P076 meet our requirement [ KK, LL, in frequency range of PP 0--3311z. f lB21-R004A/B Pressure Indic. Region RB-2 a) Since this device a) Documentation completed. Complete'd ' Robertshaw' #163C1184 El. 761' on is passive, only struc-b) SQRT forms completed. .I Model #713B Panels tural integrity is t Il22-P026 A

needed, ll22-P027 B b) GE report is adequate.

. J 'B21-R005 Diff. Press. Switch Region RB-8 a) Switches not pres-a) Device is passive. 'Barton' #163C1181 El. 710' on surized during test. b)'Used BOP document Completed Model #227 Panels b) High frequency ~ concerns EMD #013885 H22-P010 not cddressed. c) Documentation completed. c) 'g' levels adequate h21-N065 Pressure switch Region RB-2 a$*"v -{ "Barksdale' #164C5359 El. 761' on May need retesting. r ur Model #B2T Panels ments by a big margin. I 1122-P026 b) Qualification tests ll22-P027

j meet our requirements

.I in frequency range of j u 0-33Hz, e

NSSS EQUIPMENT 00ALIFI 10N PROGRESS REPORT g .Rev. 2 LaSalle County - 1 & 2 Date: 8-1-80 Project No. 6093-00 Equipment Data Evaluation of Requalification GE Documents Number Name Location Status . Remarks B33-C001A& Recirc. Pump Constant Region PC-4 Evaluation done a) Equipment is passive. B SD ingham' El. 740'0" b) Additional analysis was Ccapleted d "** 24 x 24 x 34 c) SQRT documentation completed. 333-C001A& Recirc.. Pump Motor Region PC-4 Evaluation done I B

  1. 21A9350 El. 740'0"

( .i 1 1 5 Sample Probe Region PC-4 CE do not have any Analysis to be performed. lB33-D014-El. 740'0" document ( 6 ,B-33-F023A 24" Gate Valve Region PC-4 on GE document not adequate. Reanalysis required. MD-SMB-2-25 Piping Su' system. Not done. t

  1. 921D875FP001 r-Atwood & Merrill Co.

B33-F023B 24" Gate Valve Region PC-4 on GE document not adequate. Reanalysis required. M0-SMB-2-25 Piping Subsystem Not done. 1

  1. 921D875FP001 RH-2 4

'Atwood & Merrill Co.' =

NSSS EQUIPMENT QUALI."^ 3 0N PROGRESS REPORT ( V) v ) N t -Rev.: 2 LaSalle County - 1 & 2 Project No. 6093-00 Date: 8-1-80 I .I Evalua t-i on i .j Equipment Data of Requalification -}- GE Documents Status Remarks

l Number Name Location B33-F060A Flow Control Valve Region PC-4 on CE document not adequate.

Reanalysis required. ?

  1. 761E426BP001 Piping Subsystem Not done.
  2. 768E575BP001 Ril-78

'ITT llammel Dahl Conoflow' II ) i2 B33-F060B Flow Control Valve Region PC-4 on GE document not adequate. Reanalysis required.

  1. 761E426BP001 Piping Subsystem
  2. 768E575BP001 RH-8

'ITT Hamme1 Dah1 Conoflow' I .I ![B33-F067A Gate Valve-MO-SMB-3-60 Region PC-4 on GE document not ade quat e. Reanalysis required. 'l

  1. 921D875JP001 Piping Subsystem Not done.

!i 'Atwood Merril Co.' Rll-1 ,B33-F067B Gate Valve-MO-SMB-3-60 Region PC-4 on GE document not adequate. Reanalysis required. 4 l

  1. 921D875JP001 Piping Subsystem Not done*

'Atwood Merrill Co.' Ril-2 7 I a) Analysis done t.o show~ Region RB-8 Only a drawing provided. structural integrity. Completed [B33-N011 Reactor Recire. Flow A/B Cont El. 710' on b) Documentation complete ( Panels c) SQRT form completed. ll22-P022 l } '

NSSS EQUIPMENT QUALIF ON PROGRESS REPORT LaSalle County - 1 & 2 Rev.: 2 Project No. 6093-00 Date: 8-1-80 Equipment Data Evaluation ,3 of Requalification GE Documents Number Name Location Status Remarks )B33-N018A Pressure Switch Region RB-5

1. Switches not pres-a) BOP report qualifies Completed

~ ' Static-O-Ring' #5N El. 673'.on surized during test. this report.

  1. 145C3011 Panels
2. liigh frequency concerns b) SQRT foms completed.

a H 2 P018 A not addressed. l I p I' B33-N018B Pressure Switch Region RB-5

1. 'g' levels adequate.

a) Used BOP document 'Barton' #145C3009 El. 763 on 9!* Completed

2. High frequency concerns not addressed.

-Documentation completed. Model #288A Panels

  1. 22-P021 B c) SQRT forms completed.

i B33-N023 TMP ELE (DBL ELE PREC Region RB-5

1. GE document not legible a) Analysis completed.

Completed A/B RTD) Locally mounted and incomplete. b) SQRT forms completed. Rosemount #159C4520 on pipe g RTD l I, a I B33-N024 Flow Transmitter Region RB-8 a) 'g' levels adequate a) BOP reports meet our EMD File f A/D 'Rosemount' #145C3240 El. 710' on . requirements.

  1. 18299 b) Hi@ fgem mem 1

Model #1151DP Panel b) Paper work showing not addressed.

  1. 005769 II22-P022 A adequacy is completed.

LI22-P009 B I?22-P006 C c) RRS to be obtained. Il22-P010 D B33-N028 Reactor Recire. Flow Region RB-6 No Qualification reports rs) Analysis done to show A/B Cont. locally mounted submitted. structural integrity. Completed

  1. 21A9346AE on pipe b) Documentation completed.

c) SQRT forms completed.

NSSSEQUIPMENTQUALIF]}0NPROGRESS-REPORT g LaSalle County - 1 & 2 .Rsv.: 2 Pro-j ec t No. 6093-00 Date: 8-1-80 f ~ [ l j Equipment Data Evalu = t i on of Requalification GE Documents Number Name Location Status Remarks } B33-N029 Reactor Recire. Flow Region RB-6 No qualification document a) Analysis done to show Cont. locally mounted submitted. structural integrity. Completed

  1. 21A9346AE on pipe b) Documentation completed.

[ c) SQRT forms completed. 1 \\ ' B33-NO30 Reactor Recire. Flow Region RB-6 No qualification document Cont. locally mounted submitted.

  1. 21A9346AE on pipe s

j i,

l}

B33-N014 Diff. Pressure Region RB-8 a) 'g' levels adequate a) BOP reports gg pg, A/D Transmitter El. 710' on mee ur requ remen s.

  1. 18299 b) High frequency concerns

? 'Rosemount' # 145C3240 a" n t addressed. b) Paper work showing '/14965 2 - C22 A-Model #1151DP H22-P009 B a equacy a needed. MW l2 c) SQRT forms completed Completed jB33-NO35 Temp. Element Region PC-4 No qualification document a) Analysis completed. Complete,d i i A/B L ally m unted submitted. 'NECI' 159C4313 g.SQRT forms completed. on pipe i 333-R001 Pressure Indicator Region RB-8 a) Since this device is a)' Documentation completed. Completed A/B

  1. 158B7009 El. 710' on passive, only struc-b) SQRT forms completed.

Similar to #163C1184 Panels tural integrity is i il22-P006 A needed. H22-P022 B b) CE report is adequate. 3 i

NSSS EQUIPMENT QUALIF ON PROGRESS REPORT LaSalle County - 1 & 2 . Rev.: 2 Project No. 6093-00 Date: 8-1-80 Equipment Data Evaluation .I-- n of Requalification GE Documents Status Remarks Number Name Location 's a) Sin e this device is a) Documentation completed. Completed Pressure Indicator Region RB-8 B33-R002 Passive, only struc-b) SQRT forms completed.; A/B

  1. 158B7009 El. 710' on ura in gri y is Similar to #163C1184 Panels

~ Il22-P006 A II22-P022 B b) GE report is adequate. I t o e f% h ~ ~ Y i r

NSSS EQUIPMENT QUALIF YON PROGRESS REPORT Rev.: 2 LaSalle County - 1 & 2 Project No. 6093-00 Date: 8-1-80 I .I Evaluation Equipment Data of Requalification GE Documents l Number Name Location Status Remarks l Cll-D001 H.C.U Region RB-8

1. Test report acceptable a) Additional required
  1. 761E500G001 El. 740'
2. Nozzle Loads not data to be obtained.

considered. b) Additional analysis '

3. Mounting details to be
needed, checked.

-l .I Cll-F010 1" Globe Valve A0 Region RB-8 No Qualification data a) Test report for operato c

  1. 21A1750P001 El. 740' on provided for the operator

& Namco Limit Switch i 'llammel Dahl' with Piping Subsystem & Namco Limit Switch. needed. ,f Namco Limit Switch b) Additional dimensional SL-3C-B2 data needed to perform g l analysis. 'h l

Cll-F0ll 2" Globe Valve A0 Region RD-5 No Qualification document l
  1. 21A1750P002 El. 740' on provided by GE.

'llammel Dahl' with Piping Subsystem l Namco Limit Switch SL-3C-B2 i C-ll-F012 Crosby 75' x 1" Relief Region RD-5 Evaluation not completed. Valve El. 740' on 9 f

  1. 21A1749P001 Piping Subsystem I

[ .r - t 01 h S&L Valves for [ Instrument Air > C-ll-F009

  1. 21A9317AC

[ 1 ![ 4

NSSS EQUIPMENT QUALIF ] ON PROGRESS REPORT g l i Rev.: 2 LaSalle County - 1 & 2 Project No. 6093-00 Date: 8-1-80 c Equipment Data Evaluation of Requalification I: GE Documents Status Remarks l-Number Name Location 1 C11-N013 Level Switch Region RB-8

1. High frequency concerns May need' retesting.

A/F ' Robertshaw' El. 740' not addressed.

  1. 145C3047 Locally mounted
2. Switch chatter noted.

Model #83843 l l s

s s
I n

lj l i ~ l t ?% 1 I i t L

^ NSSS EQUIPMENT QUALIF , TION PROGRESS REPORT i. w LaSalle County - 1 & 2 Rev.: 2 . Project No. 6093-00 Date: 8-1-80 i Equipment Data Evaluation of Requalification Number Name Location Document Status Remarks. C34-Ng Transmitter (Diff. Region RB-8 a) 'g' levels adequate a) BOP reports meet our EMD File Press.) 'Rosemount' El. 710' on requirements.

  1. 18299 b) Hi@ fgem mem Model #1151DP H22-P015 A&B-n t addressed.

b) Documentation com-

  1. 14965
  2. 163C1560 Panels
  3. 005769 l

P eted, H22-P025 C6D c) SQRT forms completed. Comp'leted C34-N004 Transmitter (Diff. Region RB-2 a) 'g' levels adequate EMD File A/D Press.) 'Rosemount' El. 710'0" on

  1. 18299 b) Hi@ fgem me
  2. 14965
  3. 163C1560 Panels Similar tci 145C3240 ll22-P004 A -

n a ressed.

  1. 005769 Model #1151DP H22-P027 B H22-P005 c l

C34-14005 Transmitter (Press.) Region RB-2

1. Resonance search in a) Documentation complet' d e

' Bailey Meter' El. 761'0" on each axis 1-100H. to show adequacy. Completed g

2. Dwell tests at 33H.

b) SQRT forms completed. del G556 1 2- 004 g l

3. Single axis malfunctior tests at 33H.

j g C34-N008. Transmitter (Press.) Region RB-2

1. Resonance search in a) Documentation completed Completed.

j ' Bailey' #163C1186 El. 761'0" on each axis 1-100H. to show adequacy. Model #KG55,6 a

2. Dwell tests at 33H.

b) SQRT forms completed. 22- 004 g

3. Single axis malfunction tests at 33H.

g C34-WOl7 Trans. (Level) Region RB-2 No Qualification report Component is passive. WIDERANGE El. 761'0" on received from CE. Analysis can be done to Statham #133D9404 Panels show structural integrity. Mode 1 PG2000 H22-P027 t i I.;_

g NSSS EQUIPMENT QUALI-ION PROGRESS REPORT LaSalle County - 1 & 2 Rev.: 2 Project No. 6093-00 Date: 8-1-80 Equi.pment Data Evaluation J of Pequalification Number l Name Location Document Status Remarks Reactor Building GE document not adequate, a) Reanalysis completed. C41-A001 Storage Tank Completed *

  1. 283 x 551 G002 El. 820'6" b)' Documentation completed.

c) SQRT, forms completed. C41-C001 Standby Liquid Cont. Reactor Building

1. Operability not a) Requalification'to be Pump #21A9342AS El. 820'6" addressed.

done.

2. Qualification not b) More data needed.

adequate. s C41-D003 Heater, Mixing Region RB-2

1. No seismic qualifica-a) Dimensional data needec
  1. 166B7320P001, tion document provided to do analysis.

a) Analysis completed. C41-F004 1" Standby Liquid Cont Region RB-2 on GE documents used b) Documentation com-Completed. A/B Valve #21A9370AB Piping Subsyster for reanalysis l P eted. Explosive Val'ves by SC-1 Conax. c) SQRT forms comp}e,ted. a) EMD BOP report quali-fies this device. C41-N003 Temp. Switch Region RB-2 Test report provided, b) Documentation com-Complet,ed. Fenwel 157C4629 Locally mounted not adequate. l P eted. I Catalog #22810 c) SQRT form completed. L_ b

~ NSSS EQUIPMENT QUALI ION PROGRESS REPORT LaSalle County - 1 & 2 Rev.: 2 Project No. 6093-00 Date: 8-1-80 ) l Equipment Data Evaluation of Requalification Number Name Location Document Status Remarks a) Proper documentation C41-N004 Pressure Trans. Region RB-2

1. Resonance search in completed to.show ade-Completed Bailey Meter #163C1186 El. 820' each axis 1-100Hz quacy.

Model #55G110 Locally mounted

2. Dwell tests at 3311z
3. Single axis malfunction b) SQRT forms completed.

test at 3311z. C41-N006 Temp. Element Region RB-2 No seismic qualification a) Since this. device is

  1. 158B7072, El. 820'_

report received from GE. 'passiva, an analysis 'Fenwel' Locally m'ounted was done to show Completed, structural integrity. b) SQRT forms completed. I I hC41-R003 Pressure Indic. Region RB-2 a) Since this device is a) Documentation com-Completed. 'Rebertshaw' El. 820' passive, only struc-pleted. q

  1. 163C1184 Locally mounted tural integrity is Model #713B needed b) SQRT forms completed.

b) GE report is adequate. ( ~ e

4, NSSS EQUIPMENT QUALIFF' TION PROGRESS REPORT ' v J Jn LaSalle County - 1 & 2 Rev.: 2' Project No. 6093-00 Date: 8-1-80 Equipment Data Evaluation of Requalification Number Name Location Documeri Status Remarks C51-J003 FLG, Drywell Region PC-1 GE did not provide Analysis to be per-Passive Penetration any documentation, formed. component

  1. 112C2398G001
  2. 159C4318 C51-J004 Valve, Guide Tube Region PC-1
1. Resonance Search test Additional documentation

'GE' #136B1302G002 may e needed to show

  1. 175A9755
2. Malfunction test to structural integrity.

10 g,s. and operability

3. Frequency Range 5-3311z C51-J008 Guide Tube & Fitting Region PC-1 GE did not. provide any Analysis !.o be performed
  1. 328X448G005 documentation.

to show structural E159C4318 integrity. C51-J009 Valve - Purge Region PC-1 GE did not provide any Analysis to be performed

  1. 117C1527G001 documentation.

to show structural

  1. 209A5005 integrity.

t Region CR-1 El. 740'0" on C51-K002 Voltage Preamplifier GE did not provide any A/II 'GE' (163C1263AA Panels documentation. II22-P030 II22-P031 Il22-P032 II? ?-P()11

Q NSSS' EQUIPMENT QUALIFT TTON PROGRESS REPORT LaSalle County - 1 & 2 Rev.: 2 Project No. 6093-00 Date:__ 8-1-80 Equipment Data Evaluation of Requalification Number Name Location Document Status Remarks C51-K601 Intermediate Range Region CR-1 Qualification document A/H Mon. El. 768'0"~on not adequate. 'GE' #368X102AA Panel H13-P635 H13-P636 C51-K605 PWR Range Neut. Region CR-1 No GE Qualification A/H, J/N, Monitoring ^ Instrument El. 768' on Panel document was provided., ~ C13-P608 R/Z C51-N002 Detector CE Region PC-1 Evaluation not done. A/H

  1. 112C3144G008 135B8363 175A7402 t

]. NSSSEQUIPMENTQUALIFI]TIONPROGRESSREPORT y. LaSalle County - 1 & 2' Rev.: 2 Project No. 6093-00 Date: 8-1-80 Equipment. Data Evaluation of Requalification Number Name Location Document Status Remarks C61-N001 Flow Transmitter Region RB-8

1. 'g' levels adequate a) BOP reports meet our EMD File

'Rosemount' #163C1560 Locally mounted requirements.

  1. 18299-similar to 145C3240
2. High frequency concerns
  1. 14965 n t addressed.

b) Documentation com-Model #1141DP

  1. 005769 pleted.

Completed c) SQRT forms completed. 9 C61-N006 Pres,s. Transmitter Region RB-8

1. 'g' levels adequate

'Rosemount' #163C1563 Locally mounted

2. High frequency concerns similar to 145C3240 not addressed.

Model #1151GP o a) Docu' mentation com-C61-P001 Remote Shutdown VB Region CR-1 Test methods adequate. pleted. 'GE' #368X360TDG001 b) SQRT forms completed. 1 u ( \\

/'T NSSS EQUIPMENT QUALIF *, TION PROGRESS REPORT \\._) (' ); m = L. LaSalle County - 1 & 2 Rev.: 2 Project No. 6093-00 Date: 8-1-80 Equipment Data Evaluation of Requalification Number Name Location Document Status Remarks, 761 on

1. Switches were not a) BOP report need to 01 king,

/D S ch at Panels pressurized. qualify this. device. Completed

  1. 145C3012 A Il22-P004 Model #12N
2. liigh frequency concernt b) SQRT forms completed.

j D Il22-P026 " ' *dd"**8*d* C H22-P005 B II22-P027 C71-N003 Turbine 1st Stage Region TB-1

1. Malfunction test excee( s

'g' level require-A/D Rr. SW 'Barksdale' Locally mounted our

  1. 164C5359 ments by a big margin May need retesting.
  2. BIT M12SS-GE
2. Qualification tests met t our requirements in fr(

quency range of 0-3311z C71-N004 Primary Cont. Press. Region RB-2

1. Only drawing provided, a) BOP report qualifies CN El. 761'6" on
2. No qualification docu-this device.

Completed

  1. 158B7054 Panel ment given.

ITT Barton ll22-P004

3. May be same as 145C300!.b) Device is Passive.

Model #288A c) SQRT forms completed. C71-N005 EHC Oil Line Pos.SW Region TB-1

1. No resonance search a) GE report may not meet A'/D GE (Namco)

Local mounted

done, the new criteria.
  1. 163C1303
2. Pseudo Biaxial dwell b) Acceptable report Completed st.

available in the BOP. c) Documentation and SQRT forms completed. a) Docuscntation com-C71-N006 Turbine Stop-Valve Region TB-1 GE Report #F-72638 is pleted. A/D Position SW Local mounted adequate. 'Barksdale' b) SQRT forms completed.

  1. 163C1090

/ b

]s NSSSEQUIPMENTQUALIFi]TIONPROGRESSREPORT I r.Salle County - 1 & 2 Rev.. 2 Project No. 6093-00 Date: 8-1-80 Equipment. Data Evaluation of Requalification Number Name Location Document Status Remarks D18-K609 Indicator & Trip Unit Region CR-1

1. Resonance Search test May need retesting.

A/D 'GE' #129B2802G011 El. 768' on up to 3511z. I$3-635A&B

2. Dwell test up to II13-P636 C & D gs (single axis)

D18-K610 Log Rad Mon Region CR-1

1. Test report not a) May need retesting.

A/D 'GB' #238X660G007 El. 768' on adequate. b) May need changes in aHed dudng moundng conHguration. e e 1 3-635 A & B est. II13-P636 C & D c) Can try to use results from #129B2802. D18-K611 Indicator & Trip Unit Region CR-1

1. Resonance Search test May need retesting.

A/B 'GE' #129B2802G016 El. 768' on Pane] up to 3511z. II13-P635

2. Dwell test up to 15 g's (single axis).

1 D18-K615 Indicator & Trip Unit Region CR-1 1.' Resonance Search test A/D 'GE' #129B2802G011 El. 768' on up to 3511z. Ilf3-635A&B we est up to 15 g's (single axis). H13-P636 C & D D18-N003 Detector, Insulated Region RB-6

1. GE report is adequate, a) Documentation com-A/D

'CE' 237X731G001 Locally mounted pleted. Completed b) SQRT forms completed. I o lf t' i a

NSSS EQUIPMENT QUALIFIIATION PROGRESS REPORT (_) LaSalle County .1 & 2 Rev.: 2 Project No. 6093-00 Date: 8-1-8_0 Equipment Data Evaluation of Requalification Number Name Locatic1 Document Status Remarks D18-N009 Sensor & Converter Region RB-2

1. Single axis resonance May need retesting.

A/D 'GE' #194X927G016 El. 790' search test 5-33Hz.

  1. 8 7 * "" *
2. Single axis dwell test at 3311s up to 15 g's.

D18-N015 Sensor & Converter Region RB-2

1. Single axis resonance A/D

'GE' #194X927G011 El. 790' search test 5-33Hz.

    1. 7 " "" *
2. Single axis dwell test at 33Hz up to 15 gs.

9

/1 NSSS EQUIPMENT QUALIFI - TON PROGRESS REPORT ().. V LaSalle County - 1 & 2 Rev.: 2 Project No. 6093-00 Date: 8-1-80 Equipment Data Evaluation of Requalification Number Name Location Document Status Remarks E12-B001A/B Heat Exchanger RIIR Region RB-5

1. Detailed dynamic anal-S&L to perform a dynamic
  1. 21A1686AB El. 694'6" ysis done, analysis using the correct
2. Response Spectrum Curve ; response spectrum curves.

used were not correct. Work is progressing. Qualification under pro-E12-C002A/C RHR Pump #21A9243CL Region RB-5 GE document not adequate. gress. Motor data yet El. 673'4" to be received from GE. E12-N004A/B Temp. Element Region RB-5 GE document not adequate. a) Analysis completed. Completed.' 'NECI' #159C4313 El. 673' b) SQRT form completed. Locally mounted on pipe E12-N005A/B Temp. Element Region RB-5 GE document not adequate. 'NECI' #159C4313 El. 673' Locally mounted on pipe E12-N006A/B Flow Orifice Assembly GE did not provide any a) Device is passive. Region RB-5

  1. 21A9376BW qualification document.

E1. 673, b) Simple analysis to Daniel 205-AE437 Locally mounted show structural on pipe integrity will be done. \\

O O O^l NSSS EQUIPMENT QUALIFICATION PROGRESS REPORT LaSalle County,- 1 & 2

    • Rev.:

2 l Project No. 6093.00. Date: 8-1-80 Equipment Data Evaluation of Requalification Number Name Location GE Documents Status Remarks E12-N008 Level Transmitter Region RB-5

l. GE documents do not May need retesting.

This is_to be A/B 'Barton' #145C3156 El. 710' show results checked out. J Similar to 159C4383 Locally mounted Model #M368

2. It is not adequate.

//002316 E12-N009 Diff. Press. Indic. Region'RB-5 L. High frequency con-a) Used BOP document A/C-Switch El. 673' cerns not addressed. EMD #007919. 'Barton' #145C3009 Locally mounted ?. 'g' levels adequate. b) Documentation Completed. Model #288A completed. c) SQRT forms completed. E12-N010 Flow Switch legion RB-5 .. Resonance Search test May need retesting. ~ A/C 'Barton' #145C3008

31. 673' on 5-33Hz.

Model #289A Pane ls

2. Single axis dwell (22-P018 A test up to 15 g's at 122-P021 B & C 33Hz.
3. High-freq. concerns not addressed.

E12-N012 Flow Orifice Ass'em-Region RB-5 JE d,id not provide any a) Device is passive 51y #21A9351BJ . Locally mounted qualification document VCK-SM, E-205-AE062 on pipe b) Simple analysts to show structural integrity will be done. E12-N013 Flow Transmitter Region RB-5

1. 'g' levels adequate a) BOP reports meet EMD File A/C

'Rosemount' #163C1560 El. 714' our requirements.

  1. 18299 8

9"*" Y similar to 145C3240 Locally mounted b) Paperwork showing

  1. 14965 Model #1151DP cerns not a & essed.

adequacy is com-

  1. 005769 l

P eted. Completed-gc)SQRT forms completed. I' l i

O' O Or NSSS EQUIPMENT QUALIFICATION PROGRESS REPORT LaSalle. County - 1 & 2 Rev.: 2 Project No. 6093-00 Date: 8-1-80 t Equipment Data Evaluation i of Requalification Number Name Location GE Documents Status Remarks E12-N014 Flow Orifice. Assembly Region RB-5, GE did not provide any a) Device is passive, l A/C

  1. 21A9351BB El. 720' qualification documents b)' Simple analysis to l
  2. VCR-SM-E-205-AE062 Locally mounted d

integrity will be done. 4 E12-N015 Flow Transmitter Region RB-5

1. 'g' levels adequate a) BOP reports meet our EMD File A/C

'Rosemount' #163C156f E1. 673' on requirements.

  1. 18299
  • "E
    • S"*" 7 Similar to 145C3240 Panels b) Paperwork showing
  1. 14965 Model #1151DP H22-P018 A adequacy is com-
  2. 005769 add s ed H22-P021 B & C pleted.

c) RRS to be obtained. Completed E12-N016 Pressure Switch Region RB-5

1. Switches not pres-a) BOP report qualifies A/C

' Static-0-Ring' El. 673' surized during test this device. Completed

  1. 145C3011 H22-P018 A
2. High frequency con-b) SQRT forms completed Model #5N H22-P021 B & C cerns not addressed E12-N018 Pressure Switch Region RB-4 GE did not provide any

' Static-0-Ring' El. 710' qualification documents 4

  1. 209A5127 Locally mountec

~ E12-N019 Pressure Indicator Region RB-5

1. Switches not pres-A/C Switch El. 705' sured during test.

"S ta ti c-0-Ring ' H22-P018 A

2. High frequency con-
  1. 145c3011 H22-P021 B & C cerns not addressed.

Model #5N x

i> NSSS EQUIPMENT QUALIFICATION.ROGRESS REPORT LaSalle County - 1 & 2 Rev.: 2 Project No. 6093-00. Date: 8-1-80 Equipment Data Evaluation of Requalification Number Name Location GE Documents Status Remarks E12-N022 Pressure Indicator Region RB-5 No qualification Since device is passive A/C Switch E1.. 705' on. document received from an analysis to show ' Robertshaw' Einels GE. structural" integrity ca:

  1. 163C1185 H22-P018 A be done.

Model #SP-222-C H22-P021 B & C E12-N026 Press. Transmitter Region RB-5

1. Resonance search in a) Documentation done A/B

' Bailey' Meter El. 705' on each axis 1-100Hz. to show adequacy. Completed

  1. 16301186 Pane 13
2. Dwell tests at 33Hz b) SQRT forms completed Model #556 H22-P018 A
3. Single axis mal-H22-P021 B function tests at 33Hz E12-N027 Temp. Element Region RB-5 GE documents not a) Since the device is A/B

'NECI" #159C4313 El. 705' adequate passive, a simple Locally mounted analysis was done to show structural integrity. b) SQRT forms completed i E12-N028 Pressure Transmitter Region RB-3

1. Resonance search in a) Documentation

' Bailey' Meter El. 673' on each axis 1-100Hz completed to show

  1. 163C1186 Panel
2. Dwell tests at 33Hz adequacy.

Model #556 H22-P029

3. Single axis mal-b) SQRT forms completed function tests at 33Hz E12-N029 Diff. Pressure Switcl Region RB-5
1. High frequency con-a) Used BOP document A/B

'Barton' #145C3009 El. 673' cerns not addressed. END #007919 Model #288 H22-P018

2. 'g' levels adequate. b) Documentation H22-P021 completed.

c) SQRT forms completed L

O O' Uo m m NSSS EQUIPMENT QUALIFICATION PROGRESS REPORT LaSalle County - 1 & 2 Rev.: 2 Project No. 6093-00 Date :: 8-1-80 Equipment Data Evaluation of Requalification Number Name Location _GE Documents Status Remarks E12-NO31 Temp. Element Region RB-5 GE document not a) Since the device is 'NECI" #159C4313 El. 673'0" adequate passive, a simple on cubicle wall analysis was done to Completed show structural integrity. b) SQRT forms completed E12-NO32 Pressure Switch Region RB-5 No qualification Since device is passive A/B ' Robertshaw' El. 673'0" on document received an analysis to show

  1. 163Cl~185' Panele from CE structural integrity Model #SP-222-C H22-P018 A can be done, H22-P021 B g

E12-NO33 Pressure Switch Region RB-5 No qualification Since device is passive A/B ' Robertshaw El. 673'0" on document received an analysis to show

  1. 163C1185 Panels from GE structural integrity Mylel #SP-222-C ll22-P018 A can be done.

i H22-P021 B E12-NO34 Pressure Trans. Region RB-5

1. Resonance search in a) Documentation A/C

' Bailey' Meter El. 673'0" on each axis 1-100Hz completed to show Completed

  1. 163C1186 Panels
2. Dwell Tests at 33Hz adequacy.

Model #556 II22-P018 A

3. Single axis mal-b) SQRT form's completed ll22-P021 B & C function tests at 33Hz.

E12-R002 Pressure Indic. Region RB-5

1. Since this device is a) Documentation com-n A/C

' Robertshaw' El. 673'0" on Passive, only struc-pleted.

  1. 163C1184 Panels tural integrity is Model #713B ll22-P018 A needed.

b) SQRT forms completed. Il22-P021 B & C

2. CE report is i

adequate.

O. O O^ NSSS EQUIPMENT QUALIFICATION PROGRESS F.EPORT LaSalle County - 1 & 2 Rev.: 2 Project No. 6093-00 Date: 8-1-80 Equipment Data Evaluation of Requalification Number Name Location GE Documents Status Remarks E21-C001 LPCS Pump Region RB-5 GE documents not a) Qualification in t 'Ingersol Rand' El. 673' adequate Progress. f

  1. 21A9243CM b) Motor data yet to.

be received from CE. E21-C001 Motor, Vert Region RB-5 Seismic test report 'GE'# 21A9222CM El. 673' not yet received from GE. E21-N001 Press Switch Region RB-5

1., Resonance Search a) Documentation needed

'Barksdale' El. 673' on test 2-33Hz. to show adequacy at

  1. 159C4(106 Panel H22-P001 high frequencies.
2. Single axis dwell Model # Pill b) May need retesting.

tests up to 29 g's at 33Hz. E21-N002 Flow Orifice Region RB-5 GE did not provide a) Device is passive Assembly #21A9351BC El. 710' any qualification m a ss E-205-AE062 Loca ly mounted document t i integrity will be done. E21-N003 Plow Transmitter Region RB-5

1. 'g' levels adequate

.a) BOP reports meet EMD File 'Rosemount' #163C1560 El. 673'on ur requirements..

  1. 18299
2. H @ fre p q b) Paperwork showing
  1. 14965 l

similar to 145C3240 Panel H22-P001 g , 8

  1. 005769
  • Y pie [ed.

addressed.- i c)SQRT forms completed. Completed i

f% O h L) \\ \\_), NSSS EQUIPMENT QUALIFICATION PROGRESS REPORT LaSalle County - 1 & 2 Rev.: 2 Project No. 6093-00 Date: 8-1-80 I Equipment Data Evaluation + of Requalification Number Name Location GE Documents Status Remarks-E21-N004 Flow Indication Region RB-5

1. Resonance search tes May need retesting.

,1 { Switch El. 673' on 5-33Hz 'Barton' #145C3008 Panel H22-P001

2. Single axis dwell Model #289 test up to 15 g's at 33Hz
3. High frequency con-cerns not addressed.

E21-N005 Pressure Switch Region RB-5 No seismic qualifica-a) Passive device ' Robertshaw' El. 673' on tion report received b) Analysis can be done

  1. 163C1185 Panel H22-P001 from GE.

to show structural Model #SP-222 integrity. E21-N006 Diff. Press. Indic. Region RB-5

1. High frequency con-a) Used BOP document Switch El. 673' on cerns not addressed EMD #007919 Completed

'Barton' , Panel H22-P001

2. 'g' levels adequate. b) Documentation
  1. 145C3009

,, "{ completed. E21-N008 Pressure Transmitter Region RB-5

1. Resonance search in a) Documentation I
  1. 163C1186 El. 673' on each axis 1-100Hz done to show Completed

' Bailey' Meter Panel H22-P001

2. Dwell Tests at 33Hz adequacy.

Model #556

3. Simple axis ' mal-b) SQRT forms completed, function tests at 33Hz E21-N009 Pressure Switch Region RB-5
1. Resonance search a) Documentation needed to show adequacy

'Barksdale' El. 673' on test 2-33Hz

  1. 159C4606 Panel H22-P001
2. Single axis dwell at high frequencies.

Model #P1H test up to 29 g's at b). May need retesting. 33Hz. s

O O ~Or NSSS EQUIPMENT QUALIFICATION PROGRESS REPORT LaSalle County - 1 & 2 Rev.: 2 ~ ~ ' Project No. 6093-00 Date: 8-1-80 Equipment Data Evaluation of Requalification 'i Number

  • Name Location GE Documents Status Remarks i

E21-R001 Pressure Indicator Region RB-5

1. Since this device is a) Documentation com-Completed

' Robertshaw' El.'673' on passive, only struc-pleted. ,I

  1. 163C1184 Panels H22-P001 tural integrity is Model #713B needed.

b) SQRT forms completed. 'l-

2. GE report is adequate.

E21-R002 ~ Pressure Indicator Region RB-5

1. Since this device is

' Robertshaw' El. 673' on passive, only struc-

  1. 163C1184 Panel H22-P001 tural integrity is Model #713B needed.
2. GE report is adequate.

4 E21-R600 Flow Indicator Region CR-1 No qualification a) EOP have. acceptable GE Catalog #180 El. document received from report in the file.

  1. 159C4540 on Panel GE b) Documentation H13-P601 completed.

c) SQRT form completed. E21-R601 Pressure Indicator Region CR-1 No qualification GE Catalog #180 El. document received from

  1. 15904540 on Panel GE H13-P601

. I 1

O' O' On NSSS EQUIPMENT QUALIFICATION PROGRESS REPORT LaSalle County - 1 & 2 Rev.: 2 Projec.t No. 6093-00 Date: 8-1-80 Equipment Data' Evaluation of Requalification Number Name Location 'GE Documents Status Remarks E22-C001 HPCS Pump Region RB-4 GE document not a) Qualification in 'Ingersol Rand' El. 694' & up adequate. progress. b) Motor data yet to be received from GE. E22-C001 Motor Vertical (HPG) Region RB-4 GE has no provided 'GE' #21A9222DA El. 694' & up the test report for this yet. E22-C002 Pump IIPCS Diesel Region DC-1 GE document not Additional' data Ser. Wtr. El. 673.' adequate. required to complete

  1. 21A1776AB Basement
1. All loads not analysis.

considered.

2. Operability not shown.

E22-C002 Motor Horizontal Region DC-1 Motor report not

  1. 21A9359AB El. 673' recei'ed from GE v

E22-F001 Cate Valve 14" (MO) Region RB-4 GE Qualifiertion report a) Analysis completed. Completed. ' Anchor Darling' E1. 694' approx. not adequate. SMB-00-25 on piping sub-

1. All loads not b) Documentation complet ed.

121A1739P001 system considered. c) SQRT forms completed. HP-03

2. Operability not shown.

i l 1

n .o O D" NSSS EQUIPMENT'0UALIFICATION PROGRESS REPORT LaSalle County - 1& 2 Rev.: 2 ~ Project No. 6093-00 Date: 8-1-80 -r Equipment Data Evaluation of Requalification Number Name Location GE Documents Status Remarks E22-F004 Gate Valve 12" (MO) Region RB-4 GE qualification report a) Reanalysis com-

  1. 21A1740P005 El. 694 on not adequate.

pleted. SMB-4-150 piping sub-

1. All loads not system considered Documentation yet__

t be done. HP-02

2. Operability not showi

~ E22-F010 Valve, Globe data Region RB-4 GE qualification report spec. 10" (MO) El. 694' on not adequate.

  1. 21A1920 piping wab-
1. All loads not SMB-3(100) system considered HP-02
12. Operability not showi E22-F011 Valve, Globe data Region RB-4 GE qualification report s pec. 10" (MO)

El. 694.' on not adequate. u

  1. 21A1920P002 piping sub-
1. All loads not SMB-3(100) system

. considered HP-02

2. Operability not showr E22-F012 Cate Valve 4" Region RB-4 ~

GE qualification report

  1. 21A1736P001 El. 694' on not adequate.

piping sub-

1. All loads not a

system considered

2. Operability not showr E22-F015 Cate Valve 18" (MO)

Region RB-4 GE qualification report a) Reanalysis completed Completed.

  1. 21A1739P002 E1. 710' on not adequate b) Documentation comple :ed.

SMB-2-60 piping sub-

1. All loads not 1

system considered c) SQRT forms completed HP-03

2. Operability not showr

[ .l t f I k b

f - ;;; J i .L__ O O O NSSS EQUIPMENT QUALIFICATION PROGRESS REPORT LaSalle County - 1 & 2 Rev.: 2 Project No. 6093-00 Date: 8-1-80 Equipment Data Evaluation of Requalification Number Name Location GE Documents Status Remarks E22-F023 Globe Valve 12" (MO) Region RB-4 GE Qualification

1. Requalification

' Anchor Darling' E1.694' on report not adequate completed

  1. llA1738P001 Piping Sub-
1. All loads not
2. Documentation yet SMB-4-150 system HP-02 considered to be done
2. Operability not sho%t 4

9 e i a I t l l, 1 6 4

O O O NSSS EQUIPMENT QUALIFICATION PROGRESS REPORT LaSalle County - 1 & 2 ,Rev.: 2 Projec,t No. 6093-00 Date: 8-1-80 Equipment Data Evaluation i-of Requalification Number Name Location 'GE Documents Status Remarks E22-K600 Power Supply (2 unit) Region: Aux. Report would meet our a)'Used qualification 'GE' Catalog D1dg. on Panel requirements if docum'ent for C61-9T66Y989 H13-P625

1. Test duration is Pool Panel.

Completed. p

  1. 159C4487 obtained b) Documentation com-
2. Resonance search pleted.

results are obtained. c)SQRT forms completed. E22-N001 Level Switch Region: CS Tank 1. Resonance Search a) Documentation com-A/B

  1. 159C4294 outside TB test 1-1000Hz pleted Model #3.5-751-IX-Local
2. Single axis dwell b) SQRT forms com-MPG-M14Y test with rela-l P eted.

tively high 'g, leve ls. E22-N002 Level Switch L cal ' A/B

  1. 159C4294 tgst 1-10g0Hz Model #3.5-751-IX-
2. Single axis dwell n

n MPG-M14Y ?" "*

    • f*I tively high g levels.

E22-N003 Pressure Switch Region RB-4 No qualification Since device is passive, ' Robertshaw' El. 673' on document received from an analysis to show

  1. 163C1185 Panel ll22-P024 CE.

structural integrity can be done. E22-N004 Pressure Transmitter Region RB-4

1. Resonance Search
1) Proper documentation

' Bailey' Meter El. 673' on in each axis 1-100Hz done to show Completed.

  1. 163C1186 Panel H22-P024
2. Dwell tests at 33Hz adequacy.

Model #556

3. Single axis mal-

)) SQRT forms completed. function tests at 33Hz. i n

r - + p (~)..- V U NSSS EQUIPMENT QUALIFICATION PROGRESS REPORT LaSalle County - 1 & 2 Rev.: 2 Project No, 6093-00 Date: 8-1-80 Equipment Data' Evaluation of Requalification Number Name Location 'GE Documents Status Remarks E22-N005 Flow Transmitter Region RB-4

1. 'g' levels adequate a) BOP reports meet our EMD File

'Rosemount' El. 673' on

2. High frequency con-requirements.
  1. 18299
  2. 145C3240 Panel H22-P024 cerns not addressed.

b) Paperwork showing

  1. 14965 adequacy is com-
  2. 005769 Completed c)

S o be obtained.

1. Resonance search E22-N006 Flow Switch Region RB-4 test 5-33Hz

'Barton' #145C3008 El. 673' on testupto15g}s ing e axis we ay e re es ing. Model #289A-5 Panel H22-P024 at 33Hz

3. High frequency con-cerns not addressed.

E22-N007 Flow Orifice Regi]n RB-4 GE did not provide a) Device is passive Assembly El. 673' any qualification b) Simple analysis

  1. 21A9351BE document.

to show structural E205 AE062 integrity will be VCK-SM done.

1. Resonance search in a) Proper documentation E22-N008 Position Transmitter Region RB-4 axis 1-100Hz done to show

' Bailey' Meter El. 673' adequacy. Completed

2. Dwell tests at 33Hz 1163C1186 Locally mounted Model #556
3. Single axis mal-b) SQRT farms completed.

function tests at 33Hz E22-N009 Biff. Press. Sw. Region RB-4

1. High frequency con-
  1. 0 9

'Barton' #145C3009 El. 673' on cerns not addressed. g g

4odel #288A Panel H22-P024
3. 'g' levels adequate.

completed. c) SQRT forms completed. 1

o o o-- NSSS EQUIPMENT QUALIFICATION PROGRESS REPORT LaSalle County - 1 & 2 ,Rev.: 2 Project No. 6093-00 Date: 8-1-80 Equipment Data' Evaluation of Requalification Number Name Location GE Documents Status Remarks E22-N010 Position Transmitter Locally

1. Resonance search in a) Froper documentation Furnished with mounted.

each axis 1-100Hz done to show Completed ^ MO-F011

2. Dwell tests at 33Hz adequacy.
  1. 163C1186
3. Single axis mal-b) SQRT forms completed.

function tests at 33Hz. E22-N012 Pressure Switch, Region: RB-4

1. Switches not pres-a) BOP report qualifies

' Static-0-Ring' El. 673' on surized during test this device.

  1. 145C3011 Panel H22-P024
2. High frequency con-b) SQRT forms completed.

Model #5N cerns not addressed i E22-N013 Pressure Indicator Region: RB-4

1. High frequency con-a) Used E0P' document Switch El. 673' on cerns not addressed.

EMD #007919. 'Barton' #145C3009 Panel H22-P024

2. 'g' levels adequate, b) Documentation Model #288A completed.

c) SQRT forms completed. E22-R001 Pressure Indicator Region: RB-4 .1. Since this device is a) Documentation ' Robertshaw' El. 673' on passive, only struc-completed.

  1. 163C1184 Panel H22-P024 tural integrity is Model #713B
needed, b) SQRT form's com-
2. CE report is
pleted, adequate E22-R002 Pressure Indicator Region: RB-4
1. Since this device is a) Documentation

' Robertshaw' El. 673' on passive, only struc-completed.

  1. 163C1184 Panel H22-P024 tural integrity is b) SQRT forms com-Model #713B
needed, l

P eted.

2. GE report is adequate.

l i 1 a 'l I

]' k. C * ^ NSSS EQUIPMENT QUALIFICATION PROGRESS REPORT 1&2 Rev.: 2 LaSalle County i Project No. 6093-00 Date: 8-1-80 Equipment Data Evaluation of Requalification Number Name Location 'GE Documents Status Remarks E22-R003 Pressure Indicator Region: Aux.

1. Since this device is a) Documentation

' Robertshaw' Bldg. passive, only struc-completed. Completed

  1. 163C1194 tural integrity is Model 713B
needed, b) SQRT form completed.
2. GE report is adequate.

E22-R603 Flow Indicator Region: Aux. No qualification a) BOP report qualifies 'GE' #159C4540 Bldg. El. 768' document received this device. Model #180 on Panel from GE. b) Documentation H13-P601 completed. c) SQRT forms completed. E22-R604 Position Indicator Region: Aux. No qualification

  1. 159C4545 Bldg. El. 768' document received Model #180 on Panel from GE.

H13-P601 t E22-R606 Position Indicator Region: Aux. No qualification 'GE' #159C4545 Bldg. El. 768' document received Model #180 on Panel from GE. H13-P601 E22-S001 Eng.-Gen. tor HPCS Region: Aux. Qualification documents Sys. Bldg. El. 768' received from CE.

  1. 21A1872AB on Panel Evaluation not completed H13-P601 l

4 Cq 0-Oo. ~ NSSS EQUIPMENT QUALIFICATION PROGRESS REPORT LaSalle County - 1 & 2 ,,Rev.: 2 Project No. 6093-00 Date: 8-1-80 Equipment Data Evaluation of Requalification Number Name Location 'GE Documents Status-Remarks E22-S002 Motor Control Center Region: Aux. Qualification documents May need retesting. IIPCS #21A930AK Bldg. received from GE. g El. 768' Panel: II13-P601 E22-S003 Elect Transformer, Region: Aux. GE documents adequate. a) Documentation com-Completed. IIPCS #21A1878 Bldg. pleted. Panel H13-P601 b) SQRT forms completed. E22-S004 Swgt. Elect. Ifet. Region: Aux. Qualification documents May need retesting. Encl. Bldg. received from GE.

  1. 21A9300AC El. 768' l

i 1

i, IO ~, I )R %) G v NSSS EQUIPMENT QUALIFICATION PROGRESS REPORT LaSalle County - 1 & 2 .Rev.: 2 Project No. 6093-00 Date: 8-1-80 Equipment Data Evaluation of Requalification Number Name Location 'GE Documents Status Remarks E31-N001 Temp. Element Region: RB-3 Test report submitted a) Additional cales. A/H, J, L 'NECI' #145C3224 El. 761' does not meet our 'perfomed to show Completed. Model #102-9039 approx. requirements. adequacy. J 00102 mounted on b) SQRT forms completed. cubicle walls E31-N002 Temp. Element Region: RB-4 Test report submitted A/H, J, K 'NEC1' #145C3224 El. 761' does noc meet our Model #102-9039 approx. mounted requirements. 00102 on cubicle walls E31-N003 Temp. Element Region: RB-4 Test report aubmitted A/II, J, K 'NECI #145C3224 El. 761.' does not meet our Model #102-9039 approx. mounted requirements. 00102 on cubicle walls E31-N004 Temp. Element Region: RB-4 Test report submitted A/B 'NECI' #145C3224 El. 690' does not meet our Model #102-9039 mounted on requirements. 00102 cubicle walls E31-N005 Temp. Element Region: Test report submitted A/B 'NECI' #145C3224 El. does not meet our Model #102-9039 Locally requirements. 00102 mounted i YL

On O^. Oo NSSS EQUIPMENT QUALIFICATION PROGRESS REPORT hSalle County - 1 & 2 Rev.: 2 Project No.. 6093-00 Date: 8-1-80 Equipment Data Evaluation of Requalification Number Name Location GE Documents Status Remarks E31-N006 Templ. Element Region: RB-4 Test report subt:rnitted a) Additional cales. A/B 'NECI' #145C3224 El. 673' does not meet our perfomed to show Completed. Hodel #102-9039 Locally requirements. adequacy. 00102 mounted b) SQRT forms completed. E31-N007 Diff. Pressure Indic. Region: RB-3

1. High frequency con-a) Used BOP document.

Sw. 'Barton' El. 673' cerns not addressed. EMD #007919

  1. 145C3009 on Panels:
2. 'g' levels adequate. b) Documentation Model #288 A H22-P017 completed.

" ~~ B H22-P Q c) SQRT fomrs completed. E31-N008 Diff. Pressure Indic. "l l Itigh frequene on-E A/D Sw. Barton cer Panels:.

  1. 145C3009 2,

,g, elvels adequate. A Il22-P015 Model #288 B ll22-P009 C H22-P006 D H22-P025 "h,R-

1. High frequency con-E31-N009 Diff. Pressure A/D Indic. Sw.

erns not addressed. ["3g2-015 'Barton' #145C3009

2. 'g' levels adequate.

Model #288 B ll22-P009 C ll22-P006 D ll22-P025 E31-N010 Diff. Pressure Region: RB-8

1. High frequency con-A/D Indic. Sw.

El. 710' on cerns not addressed. 'Barton' #145C3009 Panels:

2. 'g' levels adequate.

Model #288 A II22-P015 B ll22-P009 C ll22-P006 D H22-Ptf25 - h

f NSSS EQUIPMENT QUALIFICATION PROGRESS REPORT LaSalle County - 1 & 2 Rev.: 2 Project No. 6093-00 Date: 8-1-80 Equipment Data Evaluation of Requalification Number Name Location GE Cocuments Status Remarks E31-N011 Diff. Pressure Region: RB-8

1. High frequency con -

a) Used BOP document A/D Indic. Sw. El. 710' on cerns not addressed. EMD #007919 'Barton' #145C3009 Panels:

2. 'g' levels adequate. b) Documentation Completed Mode 1 #288 A H22-P015 B ll22-P009 completed.

C H22-P006 c) SQRT forms completed. D H22-P025 E31-N012 Diff. Pressure Region: DG-1

1. High frequency con-A/B Indic. Sw.

El. 710' on cerns not addressed. 'Barton' #145C3009 Panels:

2. 'g' levels adeqaute.

Model th!8&- - A H22-P018 B H22-P021 E31-N013 Diff. Pressure Region: RB-3

1. High frequency con-A/B Indic. Sw.

DG-1 El. 673', cerns not addressed. 'Barton' #145C3009 710', on Panels: 2. 'g' le als adequate. Model #288 A H22-P017 B ll22-P029 i E31-N015 Flow Transmitter Region: RB-2

1. 'g' levels adequate a) BOP reports are EMD File

'Rosemount' El. 761' on

2. High frequency con-available which
  1. 18299
  2. 163C1561 Panel H22-P002 cerns not addressed meet our requirements
  3. 14965 i

Model #1151DP b) Paper work showing

  1. 005769 8

adequacy is completed. Completed. c) SQRT forms completed. R-

~ NSSS EQUIPMENT QUALIFICATION PROGRESS REPORT ' LaSalle County - 1 & 2 ' Rev.: 2 Project No. 6093-00 Date: 8-1-80 Equipment IIta Evaluation of Requalification Number Name Location GE Documents Status Remarks E31-N018 Temp. Element 'NECI' Region RB-4, Test report submitted a) Additional cales. A/D

  1. 145C3224 RB-3 El. 673' does not meet our performed to show

. Completed Panel locall.y. requirements. adequacy. mounted b) SQRT forms completed Region RB-3,

1. Switches not pres-a) BOP report qualifies n

E31-N022 Pressure Switch DC-A El. 673', surized during test this device. A/D 'S ta ti c-O-Ring ' 710' Panels:

2. High frequency con-b) SQRT forms completed.
  1. 145C3011 A, B H2_-P017 cerns not addressed C, D H22-P029 E31-N024 Temp. Element Region RB-3 Test report submitted a) Additional cales.

A/B 'NECI' #145C3224 locally mounted does not meet our performed to show requirements.. adequacy. b) SQRT forms completed. E31-N025 Temp. Element Region RB-4 Test report submitted A/B 'NECI' #145C3224 locally mounted does not meet our requirements. E31-N026 Temp. Element Region RB-4 Test report submitted A/B 'NECI' #145C3224 El. 710' does not meet our locally mounted requirements. l = l.

O O O~ NSSS EQUIPMENT QUALIFICATION PROGRESS REPORT LaSalle County - 1 & 2 Rev.: 2 Project No. 6093-00 Date: 8-1-80 Equipment Data Evaluation of Requalification Number Name Location GE Documents Status Remarks E31-N027 Temp. Element Region RB-4, Test report submitted a) Additional cales. A/D 'NECI" #145C3224 RB-3, El. 694' does not meet our performed to show Completed on wall outside requirements. adequacy. the cubicle b) SQRT forms completed i E31-N028 Temp. Element Region RB-6 Test report submitted A/D 'NECI' #145C3224 Aux. Bldg. does not meet our El. 710' requirements. Locally mounted l E31-N029 Temp. Element Region RB-6 Test report submitted A/D 'NECI' #14503224 Aux. Bldg. does not meet our El. 746' requirements. Locally mounted I E31-NO30 Temp. Element Region RB-6 Test report submitted A/D 'NECI' #145C3224 Aux. Bldg. does not meet our El. 749' requirements. Locally mounted E31-NO31 Temp. Element Region RB-6 Test report submitted A/D 'NECI' #145C3224 Aux. Bldg. does not meet our El. 735',-716' requirements. Locally mounted l 4

? 0 0 O~ NSSS EQUIPMENT QUALIFICATION PROGRESS REPORT LaSalle County - 1 & 2 Rev.: 2 ~ ~ Project No. 6093-00 Date: 8-1-80_ Equipment Data Evaluation of Requalification Number Name Location GE Documents Status Remarks t E31-NO35 Flow Transmitter Region RB-2

1. 'g' levels adequate a) BOP reports are EMD File

'Rosemount' El.' 761' 2-ligh frequency available which

  1. 18299
  2. 163C1561 Panel H22-P002 concerns not meet our require-
  3. 14965 Model #1151DP addressed ments.
  4. 005769 1.

b) Paper work showing Completed adequacy is complete 1. c) ener fneme enmnineoa E31-NO36 Flow Transmitter Region RB-8

1. 'g' levels adequate

'Rosemount' El. 710'

2. High frequency
  1. 163C1561 Panel H22-P10 concerns not Model #1151DP addressed Region CR-1
1. Resonance Search a) Documentation com-E31-N600 Diff. Temp. Switch El. 768' Panels test pleted.

is A/H, J, K Riley 86 #159C4623 A, C E G J

2. Single axis dwell b) SQRT forms completed test B,D,F,H,K on H13-P642 Region CR-1
1. Resonance Search E31-N601 Temp Switch El. 768' Panels test A/H, J, K Riley #159C4623 A,C,E,G,J
2. Single axis dwell on H13-P632 test B,D,F,H,R on H13-lo92 E31-N602 Temp. Switch Region CR-1
1. Resonance Search A/B Riley #159C4623 El. 768' test Panels:
2. Single axis dwell A H13-P632 test B H13-P642 n

Y

O O O l-NSSS EQUIPMENT QUALIFICATION PROGRESS REPORT LaSalle County - 1 & 2 ,Rev.: 2 Projec,t No.- 6093.-00 Date: 8-1-80 Equipment Data Evaluation of Requalification Number Name Location GE Documents Status Remarks E31-N603 Diff. Temp. Switch Region CR-1

1. Resonance Search a) Documentation com-A/B Riley 86, #159C4623 El. 768' Panel:

test pleted. Completed A Ill3-P632

2. Single axis dwell b) SQRT forms com-B 1113-P642 test i

pleted. E31-N604 Temp. Switch Region CR-1

1. Resonance Search A/D Riley 86, #159C4623 El. 768' Panel:

test A, B II13-P632

2. Single axis dwell C, D II13-P642 test a) Document tion needed E31-N605 Diff. Flow Switch Region CR-1
1. Resonance Search a

A/B ' Bailey Meter' El. 768' Panel: test to show adequacy.

  1. 159C4660 A II13-P632
2. Single axis dwell b) SQRT forr completed.

Model #745 B II12-PC43 test 1-10011z I

3. Malfunction limit tes*

E31-N608 Temp. Switch Region CP-1

1. Resonance Search A/D Riley #159C4623 El. 768' Panel:

test n A, C H13-P632 2. Single axis dwell B, D II13-P642 test l I

O O O NSSS EQUIPMENT QUALIFICATION PROGRESS REPORT LaSalle County - 1 & 2 Rev.: 2 Project No. 6093-00 Date: 8-1-80 Equipment Data Evaluation of Requalification Numl>cr Name Location GE Documents Status Remarks E31-N612 Temp. Switch Region CR-1

1. Resonance Search a) Documentation com-A/B Riley #159C4623 El. 768' Panel:

test pleted. A H13-P632

2. Single axis dwell Completed B H13-P642 test b) SQRT form completed.

E31-N613 Diff. Temp. Switch Region CR-1

1. Resonance Search A/B Riley #159C4623 El. 768' Panel:

test A H13-P632

2. Single axis dwell

~ ~ ~ ~ ~ B H13-PC42 test E31-N614 Diff. Temp. Switch Region CR-1

1. Resornnce Search A/D Riley #159C4623 El. 768' Panel:

test A, C H13-P732

2. Single axis dwell B, D H13-P642 test E31-N615

.Diff. Tenp. Switch Region CR-1

1. Resonance Search A/D Riley # 159C4623 El. 768' Panel:

test A&B H13-P632

2. Single axis dwell C&D H13-P642 test E31-R620 Diff. Flow Region CR-1 No qualification reports a) BOP report qualifies Indicator El. 768' Panel: received from GE.

this device. GE Model 180 A H13-P632 b) Documentation

  1. 159C4540 completed.

c) SQRT forms completed j l so -

o o o~> HSSS EQUIPMENT QUALIFICATION PROGRESS REPORT LaSalle County - 1 & 2 Rev.: 2 Project No. 6093-00 Date: 8-1-80 Equipment Data Evaluation of Requalification Numper Name Location GE Documents Status Remarks E31-K600 Power Supply Region: CR-1 Report would meet our 'a) usedqualification 'GE' #159C4487 Ex. 768' requirements if locument for C61-Poo.1 Model #9T66Y987 Panel: H13-P632

1. Test duration is Completed obtained.

b) Documentation l

2. Resonance search.

completed results are obtained. c) SQRT form completed E31-K602 Square Root Converter Region: CR-1 CE report adequate a) Documentation ' Bailey Meter' El. 768' completed.

  1. 159C4486 Panel: H13-P632 b) SQRT forms completed.

Model #750010AAAEl E31-K603 Square Root Converter Region: CR-1 GE report adequate ' Bailey Meter' El. 768'

  1. 159C4486 Panel: H13-P632 Model #750010AAAEl E31-K604 Diff. Flow Summer Region: CR-1 GE report adequate

' Bailey Meter' El. 768'

  1. 159C4659 Panel: H13-P632 E31-K605 Square Root Converter Region: CR-1 GE report adequate-

' Bailey Meter' El. 768'

  1. 15904486~

Panel: H13-P632 Model #750010AAAEl e

+ 4 lll; '1l b l 9 g I O s kr 0 a 8 m e 2 1 R 8 ~ e v t e a n R D o i e t b acs y iu a ft m ia lt g n aS i u i. t d q s e T e ed R R t e O e e P R n E R S t S t s E se R s et G t t O n l n R o hl e P i ce m rw t u N af ad c e O uo o S y I l OT D b a e A v E cd C E G ne I aw F no I ol L sl A eo U Rf Q l T e N n E n 1 a22 M o - P34 P i R 66 t C' PP I U a 8 - - Q c n633 E o o71 1 L .HH 6 ig S el S REAB S N 'a h t c a t D iw' t Sl 6 n a A . n 5 2 e e m m cg 5 ii3P 0 p a 1 0 i N dS4H n 0f / u I e3 - 3 q l Cl 9 E e g5 e y0 mn4d t 6 i E1 o S n T' #M u. o o C N O r 1 D e t, e 2/ l c b 6A l e m R aj u S o N 1 a r 3 L P E l i1

(3 i"3 Q,) 0 ~ NSSS EQUIPMENT QUALIFICATION PROGRESS REPORT LaSalle, County - 1 & 2 ,Rev.: 2 Projept No. 6093-00 Date: 8-1-80 i Equipment Dat'a Evaluation of Requalification Number Name Location GE Documents Status Remarks E32-B001 Heater, MSIV-LCS Region: RB-4 Evaluation completed, a) Additional documenta-

  1. 2 h3581P001 El.

tion' completed. GE document adequate. g b) SQRT form completed, a I E32-C001 Blower Region: RB-4

  1. 21A3762P001 El. 673

E32-C002 Blower Region: RB-4

  1. 21A3762P001 El.

E32-K601 Power Supply Region: CR-1 Report would meet our .a)'Used qualification 'GE' #159C4487 El. 731' on requirements if report for C61-P001 Model #9T66Y987G03 Panel H13-P655

1. Test duration is to qualify.

obtained b) Documentation com-

2. Res> nance Search pleted.

results are obtained g ggg r_ g E32-K602 Power Supply Region: CR-1 Report would meet our 'GE' #159C4487 El. 731' on requirements if n Model #9T66Y987CO3 Panel H13-P654

1. Test duration is obtained
2. Resonance Search results are obtained I

l 1 J

O O 0 NSSS EQUIPMENT QUALIFICATION PROGRESS REPORT LaSalle County - 1 & 2 Rev.: 2 Project No. 6093-00 Date: 8-1-80 Equipment' Data Evaluation of Requalification Nurcber Name Location GE Documents Status Remarks E32-N006 Flow Element Region: RB-4 Analysis adequate. Additional analysis A,~E, J,'N 'S.K. Instr.' El. 673' required to show

  1. 169C8338 Locally mounted adequacy to new loads.

Similar to 163C1107 on pipe 163C1158 E32-N050 Press Trans. Region: RB-2

1. 'g' levels adequate reports are

'Rosemount' El. 761' on

2. High frequency con-
      1. 1
  1. 163C1564 Panel H22-P026 cerns not addressed meet ur requiremente Completed Similar~io'145C3240 -

8Perwor3 showing Model #1151GP E c) SQRT forms completed. E32-N051 Press Trans. Region: RB-6

1. 'g' levels adequate A,E,J,N

'Rosemount' El.

2. High frequency con-
  1. 163C1558 on Panel cerns not addressed Similar to 145C3240 H22-P073 Model #1151AP E32-N053 Flow Trans.

Region: RB-6 inalysis adequate Additional analysis A,E,J,N 'S.K. Inst.' El. 663' on required to show

  1. 169C8339 Panel H22-P073 adequacy to new loads.

Similar to 163C1107 163C1158 332-N054 Diff. Press. Trans. Region: RB-6 'g' levels adequate ' a) BOP reports are 'Rosemount' El. 663' on

. High frequency con-available which
  1. 163C1561 Panel H22-P073 cerns not addressed meet our requirements Completed Similar to l'5C3240 s) Paper work showing Model #1151DP adequacy.is completed
) SQRT forms completed.

( 1 l

p (] d V U NSSS EQUIPMENT QUALIFICATION PROGRESS REPORT LaSalle County - 1 & 2 Rev.: 2 Project No. 6093-00 ~ Date: 8-l-80 Equipment Data Evaluation of Requalification Numb.e r-Name Location GE Documents Status Remarks E32-N055 Press. Trans. Region: RB-2

1. 'g' levels adequate a) BOP reports are

'Rosemount' E1.'673'-4" on

2. High frequency con-available which

,i

  1. 163C1564 Panel H22-P074 cerns not addressed meet our requirementa Completed j

Similar to 145C3240 b) Paper work showing Model #1151GP adequacy is complete <l. c) SQRT forms completed E32-N056 Press. Trans. Region: RB-2

1. 'g' levels adequate

'Rosemount El. 673'-4" on

2. High frequency con-
  1. 163C1558 Panel H22-P074 cerns not addressed Similar to 145C3240 Model #1151AP E32-N058 Press. Trans.

Region: RB-2

1. 'g' levels adequate

'Rosemount' El. 761.' on

2. High frequency con-
  1. 163C1564 Panel #22-P027 cerns not addressed Similar to 145C3240 Model #1151GP E32-N059 Diff. Press. Trans.

Region: RB-2

1. 'g' levels adequate.

'Rosemount' El. 761' on

2. High frequency con-6163C1561 Panel H22-P074 cerNs not addressed.

Similar to 145C3240 Model #115'1DP E32-N060 Pres s. Trans. Region: RB-2

1. 'g' levels adequate

'Rosemount, El. 761' on

2. High frequency con-
  1. 163C1564 r"

Panel H22-P026 cerns not addressed Similar to #145C3240 Model #1151GP j ) [ a

O O O NSSS EQUIPMENT QUALIFICATION PROGRESS REPORT LaSalle County - 1 & 2 Rev.: 2 Project No. 6093-00 Date: 8-1-80 Equipment Data Evaluation of Requalification Nus"Jae r Name Location GE Documents Status Remarks E32-N061 Press. Trans. Region: Aux.

1. 'g' levels adequate a) BOP reports are A,E,J,N

'Rosemount' Bldg. El. 673'

2. High frequency con-available which
  1. 163C1564 on Panel ce.rns not addressed meet our requirements Completed p

Similar to 145C3240 F22-P073 b) Paper work showing F Model #1151GP adequacy is complete ( c) SQRT forms completed. E32-N600 Time delay switch Region: CR-1 Resonance Search test BOP qualification A,E,J,N ' Eagle Signal' El. 761' on followed by dwell test. report may be

  1. 145C3043 Panel H13-P655 available.

E32-N601 Time delay switch Region: CR-1 Resonance Search test BOP qualification A,E,J,N ' Eagle Signal' El. 761' on followed by dwell test report may be

  1. 145C3043 Panel H13-P655 available.

E32-N602 Time delay switch Region: CR-1 Resonance Search test BOP qualification A,E,J,N ' Eagle Signal' El. 761' on followed by dwell test report may be

  1. 145C3043 Panel H13-P655 available.

i E32-N604 Time delay switch Region: CR-1 Resonance Search test BOP qualification ' Eagle Signal' El. 761' on followed by dwell test report may be

  1. 145C3043 Panel H13-P654 available.

r e

n

NSSS EQUIPMENT QUALIFICATION PROGRESS REPORT LaSalle County - 1 & 2 Rev.: .2 Project No. 6093-00 'Date: 8-1-80 Equipment Data Evaluation of Requalification Number Name Location GE Documents Status Remarks E32-N650 Press. Switch Region: CR-1

1. Resonance Search a) Documentation com-I

' Bailey Meter' El. 761' on test 1-100Hz. pleted. -l

  1. 159C4660 Panel H13-P655
2. Single axis dwell Completed SQRT forms com-Model #745 test.

P eted. l

3. Malfunction limit test.

E32-N651 Press. Switch Region: CR-1

1. Resonance Search A,E,J,N

' Bailey Meter' El. 761' on test 1-100Hz.

  1. 159C4660 Panel H13-P655
2. Single axis dwell n

Model #745 test. l3. Malfunction limit test. E32-N653 Flow Switch Rcgb~.. CR-1

1. Resonance Search A,E,J,N

' Bailey Meter' El. 761.' on test 1-100Hz.

  1. 159C4660 Panel H13-P655
2. Single axis dwell n

Model #745

test,
3. Malfunction limit test.

E32-N654 Diff. Press. Switch Region: CR-1

1. Resonance Search

' Bailey Meter' El. 761' on test 1-100Hz.

  1. 159,C4660 Panel
2. Single axis dwell Model.#745 Ill3-P655 test.
3. Malfunction limit test.

E32-N655 Press. Switch Region: CR-1

1. Resonance Search

' Bailey Meter' El. 761' on test 1-100Hz. 7

  1. 159C4660 Panel H13-P654
2. Single axis dwell u

n Model #745 test.

3. Malfunction limit test.

+ 3

O' G1 f)J Q L J NSSS EQUIPMENT'0UALIFICATION PROGRESS REPORT '~ LaSalle County - 1 & 2 Rev.: 2 i Project No. 6093,00 Date: 8-1-80 Equipment Data Evaluation of Requalification Number Name Location GE Documents Status Remarks E32-N656 Press. Switch Region: CR-1

1. Resonance Search a) Documentation com-

'Bailiey Meter' El. 761' on test 1-100Hz. pleted.

  1. 159C4660 Panel H13-P654
2. Single axis dwell b) SQRT forms com ---

Model #745 test. i P eted.

3. Malfunction limit tesh E32-N658 Press. Switch Region: CR-1
1. Resonance Search

' Bailey Meter' El 761' on test 1-100Hz.

  1. 159C4660 Panel H13-P654
2. Single axis dwell Model #745 test.

~

3. Malfunction limit test-E32-N659 Diff. Press. Switch Region: CR-1
1. Resonance Search

' Bailey Meter' El. 76L' on test 1-100Hz.

  1. 159C4660.

Panel Ill3-P654 2.-Single axis dwell Model #745 test.

3. Malfunction limit 5

test. E32-N660 Press. Switch Region: CR 1. Resonance Search ' Bailey Meter' El. 761' on test 1-100H4

  1. 159C4660 Panel H13-P655
2. Single axis dwell test.
3. Malfunction limit f

test. f E32-N661 Press. Switch Region: CR-1

1. Resonance Search A,E,J,N

' Bailey Meter' El. 761' on test 1-100Hz.

  1. 159C4660 Panel H13-P655
2. Single axis dwell test.
3. Malfunction limit I

test. i n--

O O O NSSS EQUIPMENT QUALIFICATION PROGRESS REPORT LaSalle County - 1 & 2 , Rev.: 2 Projegt No. 6093-00 Date: 8-1-80 Equipment Data Evaluation of Requalification Number Name Location ~GE Documents Status Remarks E32-R601-Multivolt to current Region: CR-1

1. Resonance Search May h' ave to be A,E,J,N conv.

El. 761' on test 1-60Hz retested. ' Bailey Meter' Panel H13-P655

2. Single axis dwell
  1. 164C5630 test Model #740
3. Duration of test not

~ known E32-R651 Press Indicacor Region: CR-1 No qualification report a) BOP document qualifie i A,E,J,N 'CE' #164C5288 El. 761' on provided by CE. this device. Completed Panel H13-P601 b) Documentation complet 3d. c) SQRT forms completed. E32-R653 Flow Indicator Region: CR-1 No qualification report A,E,J,N 'GE' #164C5188 El. 761 on provided by CE. Panel H13-P601 1 E32-R654 Diff. Press Indic.. Region: CR-1 No qualification report 'GE' #164C5288 El. 761' on provided by CE. Panel H13-P601 E32-R655 Press Indicator Region: CR-1 No qualification report n 'CE' #164C5288 El, 761' on provided by CE. Panci H13-P601 't

O O O NSSS EQUIPMENT QUALIFICATION PROGRESS REPORT LaSalle County - 1 & 2 ,Rev.: 2 1 Projec.t No. 6093-00 Date: 8-1-80 Equipment Data Evaluation ^ of Requalification Number Name Location 'GE Documents Status. Remarks E32-R656 Press Indicator Region: CR-1 No qualification report a) BOP document qualifi< s 'GE' #164C5288 El. 761' on provided by GE. this device. Completed Panel H13-P601 b) Documentation complet ed. J c) SQRT forms completed l E32-R658 Press Indicator Region: CR-1 No qualification report 'GE' #164C5288 El. 761' on provided by GE. Panel H13-P601 k E32-R659 Diff. Press Indic. Region: CR-1 No qualification report 'CE' #164C5288 El. 761' on provided by GE. Panel H13-P601 E32-R660 Press Indicator Region: CR-1 No qualification report 'GE' #164C5288 El. 761' on provided by GE. Panel H13-P601 E32-R661 Press Indicator Region: CR-1 No qualification report 'GE' #164C5288 El. 761' on provided by GE. Panel H13-P601 j l i 1

'Q f) (~) '~ J v v NSSS EQUIPMENT QUALIFICATION PROGRESS REPORT LaSalle County - 1 & 2 ,,Rev.: 2' Project No. 6093-00 .Date: 8-1-80 Equipment Data Evaluation of Requalification Number Name Location GE Documents Status Remarks E51-C001 RCIC Pump Region: RB-3 Report is adequate for a) Requalification com-

  1. 21A9243BU El. 673' Ramshead loading pleted.

b) Documentation in progress. L E51-C002 Aux. STM Turbine Region: RB-3 Test report shows that Drives #21A9201 AV El. 673'- the equipment failed New test report not structurally and func-yet received. tionally during test. a) Used qualification E51-K600 Power Supply Region: CR-1 Test report may be document for C61- 'GE' #159C4487 El. 768' adequate. Completed Model #9T66Y987G03 Panel: H13-P61' P001 to qualify. b) Documentation com-pleted. c) SQRT form completed, i E51K601 SQ Root Converter. Region: CR-1 GE report adequate a) Documentation com- ' Bailey Meter' El. 768' pleted to show Completed

  1. 159C4486 Panel: H13-P601 adequacy.

Model #750020AAAEl b) SQRT form's completed. E51-K603 Inverter DC to AC Region: CR-1

1. Resonance Search

' Topaz' #145C3027 El. 768' test 5-33Hz Panel: H13-P612

2. Fragility level Completed l

test d)

(n) ) m ~. t < LJ J O. NSSS EQUIPMENT QUALIFICATION PROGRESS REPORT LaSalle County - 1 & 2 ,Rev.: 2 Projec.t No. 6093-00 Date: 8-1-80 Equipment Data' Evaluation of Requalification Number Name Location 'GE Documents Status Remarks E51-N001 Flow Orifice Assembl: i Reh on: RB-3 GE did.not provide a) Device is passive

  1. 21A9351 BD El. 691' any qualification b) Simple analysis to Locally mounted document.

show structural in-J on pipe tegrity will be done esonance Search E51-N002 Flow Switch Region: RB-3 f

  1. 7 "**

"E*

  1. 45c3008 Pane test up to 15 g s Model #289 H22-P017 at 33Hz
3. High frequency con-cerne-net nddreeced.

E51-N003 Flow Transmitter Region: RB-3

1. 'g' levels adequate a) BOP reports are EMD File

'RosemounL' El. 673' on

2. High frequency available which
  1. 18299
  2. 145C3240 Panel:

concerns not meet our requirements. #14965 Model #1151DP H22-P017 addressed b) Paper work showing

  1. 005769 adequacy is completed c) SQRT forms coupleted.. Completed E51-N004 Pressure Transmitter Region: RB-3
1. Resonance search in a) Proper documentation

' Bailey Meter' El. 673' on each axis 1-100Hz to show adequacy. Completed

  1. 163C1186 Panel H22-P017
2. Dwell tests at 33Hz
5) SQRT forms completed.

Model #556

3. Single axis mal-function test at 33Hz E51-N005 Pressure Transmitter Region: RB-3
1. Resonance search in

' Bailey Meter' El. 673' on each axis 1-100Hz n n

  1. 163C1186 Panel H22-P017
2. Dw<ll tests at 33Hz Model #556
3. Single axis mal-function test at 33Hz I

i

y (a) () v v NSSS EQUIPMENT QUALIFICATION PROGRESS REPORT LaSalle County - 1 & 2 Rev.: 2 ~ ~ ~ Project No. 6093-00 Date: 8-1-80 Equipment Data Evaluation of Requalification Number Name Location GE Documents Status Remarks E51-N006 Pressure Switch Region: RB-3

1. Switches not pres-a) BOP report qualifies

' Static-O-Ring' E1.'673' on surized during test. this device. Completed

  1. 145C3011 Panel H22-P017
2. High frequency con-b) SQRT form completed.

cerns not addressed. E51-N007 Pressure Transmitter Region: RB-3

1. Resonance Search in a) Proper documentation

~ 'CE/MAC' - 556 E1. 673' on each axis 1-100Hz. to show adequacy.

  1. 163C1186 Panel H22-P017
2. Dwell test at 33Hz.

b) SQRT forms completed

3. Single axis malfunc-tion test at 33Hz.

E51-N008 Pressure Transmitter Region: RB-3

1. Resonance Search in

' Bailey Meter' El. 673' on each axis 1-100Hz.

  1. 163C1186 Panel H22-P017
2. Dwell test at 33Hz.

Model #556

3. Single axis malfunc-tion test at 33Hz.

E51-N009 Pressure Switch Region: RB-3

1. Resonance Search May need retesting.

A/B 'Barksdale' El. 673' on test.

  1. 145C3046 Panel H22-P017
2. Quality test.

Model #D2H

3. Fragility test.

E51-N010 Level Switch Region: RB-3

1. Resonance Search a) Documentation

'Magnetrol' El. 673' test 1-100Hz. completed. Completed

  1. 159C4361 Locally mountet
2. Single axis dwell b) SQRT forms completed, Model #5.0-751 test with relatively high 'g' icvels.

n ( i

' (~) f~h ()) - V G Q NSSS EQUIPMENT QUALIFICATION PROGRESS REPORT LaSalle County - 1 & 2 Rev.: 2 Project No. 6093.00 Date: 8-1-80 I Equipment Data' Evaluation of Requalification Number Name Location GE Documents Status Remarks E51-N012 Pressure Switch Region: RB-3

1. Resonance Search A/D

'Barksdale' El. 673' on test' May need retesting.

  1. 145C3046 Panel
2. Qualification test Model #D2H A, C H22-P017
3. Fragility test B, D H22-P029 E51-N020 Pressure Switch Region: RB-3
1. Resonance Search

'Barksdale' El. 673' on test, 2-33Hz

  1. 159C4606 Panel H22-P017
2. Single axis dwell Model #DlH test up to 29 g's at 33Hz E51-N021 Pressure Switch Region: RB-3
1. Resonance Search

'Barksdale' E1. 673' on test

  1. 145C3046 Panel H22-P017
2. Qualification test Modal #D2H
3. Fragility test

\\ E51-NO34 Pressure Switch Region: RB-3 No Seismic Qualifica-a) Device is passive. ' Robertshaw' El. 673' on ' tion report received b) Analysis can be done

  1. 163C1185 Panel H22-P017 from GE.

to show structural 4 Model #SP-222-C integrities. E51-R001 Pressure Indicator Region: RB-3

1. Since this device is a) Documentation

' Robertshaw' El. 673' on passive, only struc-c mP eted. Completed l

  1. 163C1184 Panel H22-P017 tural integrity is Model #713 B needed.

b) SQRI forms com-

2. CE report is pleted.

adequate. I i

\\) '\\. ) \\_) NSSS EQUIPMENT QUALIFICATION PROGRESS REPORT LaSalle County - 1 & 2 Rev.: 2 Project No. 6093-00 Date: 8-1-80 Equipment Data' Evaluation of Requalification Number Name Location GE Documents Status Remarks E51-R002 Pressure Indicator Region: RB-3

1. Since this device-

' Robertshaw' El. 673' on is passive, only a) Documentation Completed

  1. 163C1184 Panel H22-P017 structural integrity completed.

g Model #713 B is needed. b)SQRf forms completed.

2. GE report is adequate.
l. Resonance Search E51-R003 Prbssure Indicator Region: RB-3 2-200-2 with high

' Robertshaw' El. 673' on e e g leyet

  1. 163C1184 Panel H22-P017
2. Pseudo biaxial Model #713 B dwell test for i

5 min at all resonarces. E51-R004 Pressure Indicator Region: RB-3 ' Robertshaw' El. 673' on

  1. 163C1184 Panel H22-P017

_a_ Model #713 B. 4 E51-R005 Temp. Indicator Region: RB-3 .l. GE document not

1. Device is passive.

' Weed' El. 673' adequate

2. Simple analysis
  1. 145C3103 Local
2. Part of drawing not can be done if provided drawing is available.

i E51-R600 Flow Control Region: CR-1

1. Resonance Search
1) Documentation Completed

' Bailey Meter' El. 768' test 1-100Hz. completed.

  1. 163C1392 mounted on
2. Single axis dwell

)) SQRT forms completed. l Model #701 Panel H13-P601 test with high I g's. . j n l t

^ NSSS EQUIPMENT QUALIFICATION PROGRESS REPORT LaSalle County - 1 & 2 Rev.: 2 Project No. 6093-00 Date: 8-1-80 h Equipment Data Evaluation of Requa1ification Numbe r-Name Location GE Documents Status Remarks F18-E001 Fuel Prep Machine Region: RB-1 GE document adequate. a) Evaluation completed.

  • h
  1. 283X759G001 El. 843' Completed b) Documentation com-Refueling Floot pleted.

F18-E0ll General Purpose Region: RB-1 No Qualification a) Device is passive. Grapple El. 843' report submitted. b) An analysis to be don e.

  1. 148F478G001 Pool c) Data available from design report.

D f e 4

[j () h \\ d ( NSSS EQUIPMENT QUALIFICATION PROGRESS REPORT LaSalle County - 1 & 2 Rev.: 2 Project'No. 6093-00 Date: 8-1-80 Equipment Data Evaluation of Requalification Number-Name Location GE Documents Status Remarks F19-E008 Dryer & Separator Region: RB-1 No Qualification report a) Device is passive. Sling Refueling Flooi provided by GE. b) Analysis yet to be

  1. 767E438P002 done.

i i F19-E009 Ilead Stron3 ack Region: RB-1 No Qualification report b Carousel Refueling Flooi provided by GE.

  1. 765E425G001 i

W 1 -e

e IJ 4 s kr 0 a 8 m e 2 1 R 8

: e

. e v t eb e a n v R D o io i st t s a at cs pe iu y ft s ia i s lt i aS es cy u i l e q van T e eno R R dad O P )) E ab R S S t. E rE R s oG G t p O n n ey R o e rb P i m t nd u N af oe c O uo it o t t I l D T a aicm A v E ib C E G f u I i s F l I at L uo A Qn U Q l T o 1 o N P E n B M o k t P i n t

3 e I

U a n4 m Q c o8 p E o i .i L g u S el q REE S S N e a l t p a p D ar t G n 2 2 e e d0 m m o0 0 p a RG 1 0 i N 3 u l9 o5 - 3 q rE 9 E t7 y0 n6 t 6 o7 n C# u o o C N 2 r e t 0 e l c 0 b E l e m a j u 0 S o N 2 a r F L P It d

NSSS EQUIPMENT QUALIFICATION PROGRESS REPORT LaSalle County'- 1 & 2 Rev.: 2 Project Nc. 6093-00 Date: 8-1-80 Equipment Data Evaluation of Requalification Number Name Location GE Documents Status Remarks F21-E003 Refueling Platform Region: RB-1 Finite element Reanalysis in progress. Equip. El. 843' analysis report not

  1. 762E897G001 Refueling Floor included.

.M.wh m y. e 4 l e

^ ( NSSS EQUIPMENT OUALIFICATION PROGRESS REPORT LaSalle County - 1 & 2 Rev.: 2 ~ ~ Project No. 6093-00 Date: 8-1-80 Equipment Data Evaluation of Requalification Number-Name Location GE Documents Status Remarks F22-E009 Defect Fuel Storage Region: RB-1 Qualification document a) Device is passive, Cont. El. not provided by GE. b) Analysis yet to be

  • l
  1. 117C2072G004 Spent fuel pool done.

b F22-E0ll Equipment Storage Region: RB-1

1. GE report meet the a) Analysis completed.

Rack El. criteria.

  1. 283X7710001 Spent fuel pool 2. Qualifications to o

ne new loads to be done.

  • D F22-E012 Fuel Storage Vault Region: RB-1 3)
  1. 283X773G001 El.

~ Refueling Floor I g. 4 e mee. L

O O O~ NSSS EQUIPMENT QUALIFICATION PROGRESS REPORT LaSalle County - 1 & 2 Rev.: 2 Projec.t No. 6093-00 Date: 8-1-80 Equipment Data' Evaluation of Requalification Number Name Location GE Documents Status Remarks w. G33-NO35 Fl'ow Element Region: RB-7 Seismic Qualification a) Device is passive.

  1. 145C3227 El.

report not received b) Analysis yet to be Vickery Simms/ Daniel Locally mounted from GE. done. f G33-N040 Flow Element Region: RB-7 Seismic Qualification 3

  1. 145C3227 El.

report not received Vickery Simms/ Daniel Locally mounted from GE. 4 + a i E.

O O C NSSS EQUIPMENT QUALIFICATION PROGRESS REPORT LaSalle County - 1 & 2 Rev.: 2 Project No. 6093-00 Date: 8-1-80 Equipment Data Evaluation of Requalification Number Name Location GE Documents Status Remarks H13-P601 Reactor Control Region: Aux. Qualification Document a) Analysis completed. Cooling BB Bldg. submitted - not b) Documentation yet

  1. 328X501TDG001 El. 768' adequate.

to be done. H13-P603 Reactor Control BB Region: Aux. Qualification Document

  1. '128X503TDG001

. Bldg. submitted - not El. 768' ade quate. H13-P608 Power Range Monit. Region: Aux. Qualification Document

1. Dynamic analysis to Work has Cab.

Bldg. submitted - not be performed on the started.

  1. 328X105TDG001 El. 768' adequate.

worst case Bench Board Panel and the Vertical Panel.

2. Obtain acceleration for Tnstrumant T.n e n t nn.

H13-P609 RPS Div. Al & A2 Region: Aux. Qualification Document

1. Dynamic analysis t Work he, Logic VB Bldg.

submitted - not be performed on the started.

  1. 328X509TDG001 El. 768' adequate.

worst case Bench Board Panel'and the i Vertical Panel, i

2. Obtain acceleration for Tnstrnmone T.n e n e nn-ana s

H13-P611 RPS Div. 3 & 4 Logic Region: Aux. Qualification Document p g t Work has VB Bldg. submitted - not worst case Bench started.

  1. 328X511TDG001 El. 768' ade qua te.

Board Panel and the Vertical Panel. i

2. Obtain acceleration i

for Tncernmone Ynene nn

--~ . 1"\\ P) ~ .G (&' \\_ NSSS EQUIPMENT QUALIFICATION PROGRESS REPORT LaSalle Coun :y - 1 & 2 Rev.: _2 Project No. 6093-00 Date: 8-1-80; Equipment Data Evaluation of Requalification Number Name Location GE Documents. Status Remarks H13-P612 FW & Recire. Instr. Region: Aux. Qualification Docuacnt

1. Dynamic analysis to Work has Panel Bldg.

submitted - not be performed on the started.'

  1. 32",:iS12TDG001 El. 731'
adequate, worst case Bench Board Panel and the Vertical Panel.
2. Obtain acceleration fnr T n c e r,,mo n e Y nr o e f..a H13-P613 NSSS Process Instr.

Region: Aux. Qualification Document Panel Bldg. submitted - not

  1. 328X513YDG001 El. ??i' ade qua te.

H13-P618 Div. 2 RRR Relay VB Region:,RB-5 Qualification Document

  1. 328X518TDG001 El. 673' submitted'- not adequate.

H13-P621 Reac. Core. Isin. Region: RB-8 Qualification Document Clg. R1y. VB El. 731' submitted - not

  1. 328X521TDG001 adequate.

H13-P622 Inboard Valve Region: RB-8 Qualification Document Relay VB El. 731' submitted - not

  1. 328X522TDG001 adequate.

O O c0 - NSSS EQUIPMENT QUALIFICATION PROGRESS REPORT LaSalle County - 1 & 2 Rev.: 2 Project No. 6093-00 Date: 8-1-80 Equipment Data Evaluation of Requalification Number Name Location GE Documents Status Remarks H13-P623 Outboard Valve Region: RF-8 Qualification Document om j p th Work has Relay VB El. 731' submitted - not worst case Bench started.

  1. 328X523TDG001 ade quate.

Board Panel and the-Vertical Panel.

2. Obtain acceleration for Tnntrurone T.nenei nn.

H13-P624 Area Radn. Common. Region: Aux. Qualification Document Mon. Pariel Bldg. ~68' submitted - not

  1. 328X400TDG001 adequate.

H13-P625 HP Core Spray Relay Region: Base-Qualification Document VB #328X525TDG001 ment Sup. Bldg. submitted'- not El. 687' ad. equate. I H13-P628 Div.31 Part. & Ads. Region: Aux. Qualification Document VB #195B9780G001 Bldg. submitted - not El. 731' adequate. ^l 1 1 H13-P628 Auto Depress Ch. A Region: Aux. Qualification Document Rly. VB Bldg. submitted - n)t

  1. 328X528TDG001 El. 731' adequate.

t i i

j' \\ 0. Q) ! G ,n NSSS EQUIPMENT QUALIFICATION PROGRESS REPORT LaSalle County - 1 & 2 Rev.: 2 Project No. 6093-00 Date: 8-1-80 Equipment Data Evaluation of Requalification Number Name Location GE Documents Status Remarks H13-P629 Div. 1 LPCS & RHR Region: Aux. Qualification Document

1. Dynamic analysis to Work has Relay VB Bldg.

submitted - not be performed on the started.

  1. 328X529TDG001 El. 731'
adequate, worst case Bench Bend Panel and the.

Vertical Panel.-

2. Obtain acceleration fnr T n c e ri,mn n - Tneer ;nn H13-P631 Div. h Prt. ADS VB Region: Aux.

Qualification Document

  1. 195B7780G002 Bldg.

submitted - not n n El. 7'I' adequate. H13-P631 Auto Depress Ch. Region: Aux. Qualification Document B R1y VB Bldg. ' submitted.- not n n

  1. 328X531TDG001 El. 731' adequate.

H13-P632 Div. 1 Leak Detectio-1 Region: Aux. Qualification Document .VB Bldg. submitted - not n n

  1. 328X532TLG001 El. 768' adequate.

i H13-P635 Div. 1 Rad. Mon. Region: Aux. Qualification Document Inst. Panel Bldg. submitted - not

  1. 328X506TDG001 El. 768' adequate.

T Q ,r13 e J u) w l NSSS EQUIPMEL ' QUALIFICATION PR GRESS REPORT LaSalle County, - 1 & 2 ~' Rev.: 2 i Project No. 6093-0,0 Date: 8-1-80 4 Equipment Data Evaluation of Requalification Number Name Location GC Documents Status Remarks H13-P636 Div. II Rd. Mon. Region: Aux. Qualification Document

1. Dynamic analysis to Work-has Inst. Panel Bldg.

submitted - not be performed on the started.

  1. 328X533TDG001-El. 768' adequate.

worst case Bench Board Panel and the Vertical Panel. ~

2. Obtain acceleration f or ;

Tnn ernmone T.nenei nn. H13-P642 Div. II Leak Detec-Region:' Aux. Qualification Document 3 tion VB Bldg. submitted - not

  1. 328X542TDG001 El. 768' adequate.

t H13-P654 MSIV Lkg. Div. II Region: Aux. Qualification Document Cont. VB Bldg. submitted - not

  1. 386X332TDG001 El. 731' adequate.

.i ^ I ' H13-P655 MSIV Lkg. Div. I Region: Aux. Qualification Document Cont. VB Bldg. submitted - not

  1. 386X333TDG001 El. 731' adequate.

1 8 k l l i a

O O

D NSSS EQUIPMENT' QUALIFICATION PROGRESS REPORT LaSalle County - 1 & 2 Rev.:

2 Project No. 6093-00 Date: 8-1-80 Equipment Data Evaluation of Requalification Number Name Location GE Documents Status Remarks H13-P644 LL. Set Point Main Region: CR-1 Qualification Document

1. Dynamic analysis to Work has be performed on the Panels Aux. Elec.

submitted - not worst case Bench started. Equip. Room adequate. Board Panel and the Vertical Panel. ~~

2. Obtain acceleration

~or-T n = P riimo n e T.nr, r i r n - H13-P645 LL. Set Point Main Region: CR-1 Qualification Document

1. Dynamic analysis to Work has Panels Aux. Elec.

submitted - not be performed on the started. Equip. Room adequate. worst case Bench Board Panel and the Vertical Panel.

2. Obtain acceleration :or TrnPr,*monP T.ne n ei nn.

9 e ) i OL

t n Ol NSSS EQUIPMENT QUALIFICATION PROGRESS REPORT LaSalle County - 1 & 2 Rev.: 2 ~ ~ ~ Project No. 6093-00 Date: 8-1-80 Equipment Data Evaluation of Requalification Nu mb.e r' Name Location GE Documents Status Remarks 4 H22-P001 PCS Local Panel Region: RB-5

1. Test Report for one a) Apequacy Documenta-
  1. 368X262TDG001 El. 673' rep. Panel H22-P004 b) Dyn m e analysis on

\\ is adequate. one each of 30", 48" b

2. 'g' levels for and 72" wide panels Instrument obtained.

done to obtain In-strument 'g' levels. H22-P002 Reactor Water Clnup. Region: RB-2

1. Test Report for one LCL PNL El. 761' rep. Panel H22-P004 c)D cumentation yet to be done.
  1. 368::263TDG001 is adequate.
2. 'g' levels for Instrument obtained.

H22-P004 RV LVL & Press. LCL Region: RB-2

1. Test Report for one PNL A El. 761.'

rep. Panel H22-P004 ~

  1. 368X264TDG001 is adequate.
2. 'g' levels for Instrument obtained.

H22-P005 RV LVL & Press. LCL Region: RB-2

1. Test Report for one PNL C El. 761' rep. Panel H22-P004
  1. 368X265TDG001 is adequate.

n

2. 'g' levels for Instrument obtained.

H22-P006 Recirc Local Panel A Region: RB-8

1. Test Report for one
  1. 368X266TDG001 El. 710'

-rep. Panel H22-P004 is adequate.

2. 'g' levels for Instrument'obtained.

i i .} s

g-O O' NSSS EQUIPMENT QUALIFICATION PROGRESS REPORT LaSalle County - 1 &' 2 Rev.: 2 ~ Project No. 6093-00 Date: 8-1-80 Equipment Data Evaluation of Requalification Number Name Location GE Documents Status Remarks H22-P009 Jet Pump Local-Region: RB-8

1. Test report for one a) Adequacy Documenta -

H Panel B El. 710' rep. Panel H22-P004 tion done. r I

  1. 368X267TDG001 is adequate.

b) Dynamic analysis on'

2. 'g' levels for one each of 30", 48" b

Instrument obtained. and 72" wide. panels done to.obtain In-strument 'g' levels. H22-P010 Jet Pump Local Region: RB-8

1. Test Report for one c) Documentation yet to Panel A El. 710' rep. Panel H22-P004 be done.
  1. 368X268TDG001 is adequate.
2. 'g' levels for Instrument obtained.

H22-P0ll SBLC Instr. Panel Region: RB-2

1. Test Report for one El. 820' rep. Panel H22-P004 i is adequate.
2. 'g' levels for Instrument obtained.

H22-P015 Main Steam Flow Region: RB-8

1. Test Report for one LCL PNL A El. 710' rep. Panel H22-P004 a
  1. 368X270TDG001 is adequate.
2. 'g' levels for Instrument obtained.

H22-P017 RCIC Local Panel A Region: RB-3

1. Test Report for one
  1. 368X272TDG001 El. 673' rep. Panel H22-P004 is adequate.
2. 'g' levels for Instrument obtained.

I L.

D O O NSSS EQUIPMENT QUALIFICATION PROGRESS REPORT LaSalle County - 1 & 2 Rev.: 2 Project No. 6093-00 Date: 8-1-80 I . Equipment Data Evaluation of Requalification Number Name Location GE Locuments Status Remarks II22-P018 RIIR Local Panel A Region: RB-5

1. Test Report for one a) Adequacy Documenta-
  1. 368X273TDG002 El. 673' rep. Panel II22-P004 tion done, is adequate.

b) Dynamic analysis on

2. 'g' levels for one each of 30", 48" Instrument obtained.

and 72" wide panels done to obtain In-strument 'g' levels. H22-P021 RHR Local Panel B Region: RB-5

1. Test Report for one c) Documentation yet to
  1. 368X274TDG001 El. 673' rep. Panel H22-P004 be done.

is adequate.

2. 'g' levels for Instrument obtained.

H22-P022 Recire. Local Region: RB-8

1. Test Report for one Panel B El. 710' rep. Panel H22-P004
  1. 368X275TDG001 is adequate.
2. 'g' levels for Instrument obtained, h.12-P024 HPCS Local Panel Region: RB-4
1. Test Report for one
  1. 368X276TDG001 El. 673' rep. Panel H22-P004 is adequate.
2. 'g' levels for Instrument obtained.

= "} ~ flSSS EQUIPMENT QUALIFICATION PROGRESS REPORT LaSalle County - 1 & 2 Rev.: f2 Project No. 6093-00 Date: 8-1-80 Equipment Data Evaluation of Requalification Number Name Location GE Documents Status Remarks H22-PG25 Main Steam Flow Region: RB-8 1 Test Report for one a) Adequacy Documenta-LCL Panel D El. 710' rep. Panel H22-P004 tion done.

  1. 368X277TDG001 is adequate.

b) Dyncmic analysis on

2. 'g' levels for one each of 30", 48" Instrument obtained.

and 72" wide panels done to obtain In-strument 'g' levels. H22-P026-RV LVL & Press. LCL Region: RB-2

1. Test Report for one c) Documentation yet Panel D El. 761' rep. Panel H22-P004 to be done.
  1. 368X278TDG001 is adequate.
2. 'g' levels for n

Instrument obtained. H22-P027 RV LVL & Press. LCL Region RB-2

1. Test Report for'onc Panel B El. 761.'

rep. Panel H22-P004

  1. 368X279TDG001 is adequate.

n

2. 'g' levels for Instrument obtained.

H22-P028 HPCS Desl. Gen. Prot. Region: DG-1

1. Test Report for one Rly VB El. 710' rep. Panel H22-P004
  1. 328X508TDG001 is adequate.
2. 'g' levels for Instrument obtained.

H22-P029 RCIC Local Panel B Region: RB-3

1. Test Report for one
  1. 368X280TDG001 El. 673' rep. Panel H22-P004 is adequate.
2. 'g' levels for Instrument obtained.

u --

.Od CJ (~) v NSSS EQUIPMENT QUALIFICATION PROGRESS REPORT _ LaSalle County -- l & 2 Rev.: 2 Project No. 6093-00 Date: 8-1-80 Equipment Data Evaluation of Requalification Number Name Location GE Documents Status Remarks H22-P030 SRM & IRM Preamp. Region RB-8

1. Test duration not Additonal analysis g,g g, Encl. A-D El. 740' known.

will be performed to started.

  1. 328X530TDG001
2. Test requirement show adequacy.

not adequate. H22-P031 SRM & IRM Preamp. Region RB-8

1. Test duration not Additional analysis Encl. A-D El. 740' known.

will be performed to

  1. 328X53 g D01 _
2. Test requirement show adequacy.

not adequate. H22-P032 SRM & IRM Preamp. Region RB-8

1. Test duration not Additional analysis Encl. A-D E1. 740' known.

will be performed to

  1. 328X530TDG001
2. Test requirement show adequacy.

not adequate. H22-P033 SRM & IRM Preamp. Region: RB-8

1. Test duration not Additional analysis n

Encl. A-D El. 740' known. will be performed to

  1. 328X530TDG001
2. Test requirement show adequacy.

not adequate.

1. Test Report for a) Adequacy Documenta-tion done.

H22-P073 MSIV Lkg. Cont. Region: Aux. one rep. Panel Div. I Bldg. H22-P004 is b) Dynamic analysis on ~ u LP E1, 673' adequate. one each of 30", 48"

  1. 386X334G001
2. 'g' levels for and 72" wide, panels IUP" levels.

I"~ "" E Instrument obtained. strument g c) Documentation yet to be done.

i O O O NSSS EQUIPMENT 00ALIFICAT10N PROGRESS REPORT -' LaSalle County - 1 & 2 ,,Rev.: 2 Project No. 6093-00 Date: 8-1-8,0 Equipment Data Evaluation of Requalification Number Name Location 'GE Documents Status Remarks ll22-P074 MSIV Lkg. Cont. Div. Region: RB-4

1. Test. Report for one a) Adequacy Documenta-2LP El. 673' rep. Panel H22-P004 tion'done.

Work has

  1. 386X335G001 is adequate, b) Dynamic analy*is on started.

'1

2. 'g' levels for one each of 30d, 48" Instrument obtained.

and 72" wide panels.. done to obtain In-strument 'g' levels. Il22-P075 LLS/SRV Div. 11 Region: Aux. c) Documentation yet to n be done, n Rack Bldg.

  1. 442X211G002 El. 761'

!!22-P076 LLS/SRV Div. II Region: Aux. Rack El. 761'

  1. 442X211G001 4

.i i e

m , ~ \\) ~ (() " NSSS EQUIPMENT QUALIFICATION PROGRESS REPORT LaSalle County - 1 & 2 Rev.: 2 Project No. 6093-00 Date: 8-1-80 Equipment Data Evaluation of Requalification Number Name Location GE Documents Status Remarks

1. Single axis, Single a)Used qualification of 145C3040 On Panels freq. test.

C61-P001 and quali-H13-P601

2. Resonance Search fied this device.

Completed 174B9070 Switch 'CE' H13-P603 test. b) Documentation com-Model CR2940 H13-P609

4. Malfunction test up l c)SQRT forms completed,
3. Dwell test.

pleted. 145C3208 H13-P611 en 70 3'n_ 145C3040 On Panels

1. Single axis, Single

" ~ Switch 'GE' n 174B9070 H13-P628 2. e Model CR2940 t H13-P629 es

3. Dwell test.

145C3208 H13-P631

4. Malfunction test up

.n 9n e'e 143c3040 on Panels

1. Single" axis, Single r q.

est. Switch 'CE, n 174B9070 H13-P642

2. Resonare Search Model CR2940 test.

145C3208 3.. Dwell test.

4. Malfunction test ap to 20 g's.

On Panels Test report not Since device is passiw 145C3230 Switch (Push Button: H13-P601 adequate. an analysis could be ' Cutler Hammer' H13-F603 performed. i O

-f. NSSS EQUIPMENT ' QUALIFICATION PROGRESS REPORT '~ LaSalle County, - 1 & 2 Rev.: 2 { ProjectNo. 6093-00 Date: 8-1-80 Equipment Data Evaluation of Requalification Number Name Location GE Documents Status Remarks 136B3137. Relay 'GE' On Panels

1. Fragility test at a) BOP qualification

'HFA' H13-P629 various frequencies report used. til3-P631 performed with b) Documentation showing, Completed H22-P028 respect to Contact , adequacy completed. Chatter time of c) GE data completed'.~ ~ .1, 1 & 19 MS. d)SQRT forms completed. 145C3209 Conector On Panels

1. Resonance Search "GE' Model # CR105 H13-P609 test (5-33)

H13-P611

2. Dwell test in each Retesting is needed.

axis up to 12 g's. 145C3035 Relay - Time On Panels Qyalification report received f m GE. Delay 'GE' H13-P609 Model # GR2820 H13-P611 H13-P618 i H13-P621 H13-P628 H13-P629 H13-P631 ^ H13-P028 d o, ll

O O <O - NSSS EQUIPMENT QUALIFICATION PROGRESS REPORT LaSalle County - 1 & 2 Rev.: 2 Project No. 6093-00 Date: 8-1-80 Equipment Data Evaluation of Requalification Number Name Location GE Documents Status Remarks 145C3238 Relay On Panels

1. Single axis, Single Agastat H13-P612 frequency dwell testr SQRT Documentation Model # GP

!!13-P613 at 1, 5, 10, 15, 20, comple ted Completed II13-P622, P623 25 & 30 Hz H13-P655, P654

1. Fragility test at
i 159C4251 Relay-GE 'HMA' On Panels vari us frequencies a) BOP qualification H13-P618 Performed with report used.

H13-P621 b) Documentation show-Completed respect to Contact II13-P625 Chatter time of ing adequacy done. c) GE data also used, .1, 1 & 10 MS. d)SQRT forms completed. 159C4251 Relay-GE 'HMA' On Panels

1. Fragility test at H13-P6d8 various frequencies H13-P631

' performed with H13-P632 res pec t to Contact H13-P642 Chatter time of .1, 1 & 10 MS. 159C4251 Relay-GE 'HMA' C11-P001

1. Fragility test at i

various frequencies performed with res pect to Contact Chatter time of .1, 1 & 10 MS.

( NSSS EQUIPMENT buALIFICATION PRbGRESS REPORT l' LaSalle County,- 1t.2-Rev.: 2 8-1-80 Project No. 6093-00 Date:_ ( Equipment Data Evaluation of Requalification Number Name Location GE Documents Status Remarks a) BOP report used. 164C5288 Indicator On Panel No Seismic Qualifica-H13-P601 tion report received b) Documentation com-Completed from GE. pleted. c) SQRT forms com-pleted. 169C8044 Switch On Panel No Seismic Qualifica-H13-P603 tion report received from GE. 3 " l 216X494 Range Switch On Pane,1 Seismic Qualifica-

  1. 216X494G.008 Ill3-P603 tion report not adequate.

t 136B3137 Relay GE 'HFA' On Panels

1. Fragility test at a) BOP qualification II13-P609

'various frequencies report used. Ill3-P611 Performed with b) Documentation show-Completed H13-P618 res pect to Contact ing adequacy done. H13-P621 Chatter time of c) CE data also used. .1, 1 & 10 HS. d)SQRT forms completed. H13-P622 j H13-P623 H13-P625 H13-P628 i 3' 1 .s l

e f) f s% [ (V s ( V., }. NSSS EQUIPMENT' QUALIFICATION PROGRESS REPORT LaSalle l County - 1 & 2 Rev.: 2 i Project No. 6093-00 Date: 8-1-80 Equipment Data Evaluation of Requalification Number Name Location GE Documents Status Remarks 272A9869 Switch 'SBM' On Panels Accept'able report.- 262A6893 II13-P601 available in BOP. 262A 3A39 C 0 a) Qualified using BOP Completed 234A9337 report. b) SQRT form completed. 249A1391 Switch 'SBM' On Panels 249A1392 II13-P601 249A1394 !!13-P602 a 249A1396 C61-P001 149A1479 Switch 'SBM' On Panels 249A1690 II13-P601 287A4825 1113-P602 272AS443 C61-P001 272A8458 Switch 'SBM' On Panels 272A8486 lil3-P601 272A8485 II13-P602 C61-P001 ~ 163C1392 controller On Panels QUALIFICATION TEST SQRT Documentation Ill3-P601 REPORT Received Completed Completed C61-P001 i 1 f r m.

( ) e NSSS EQUIPMENT QUALIFICATION PROGRESS REPORT LaSalle County,- 1& 2 Rev.: 2 i Project No. 6093-00 'Date: 8-1-80 Equipment Data Evaluation of Requalification Number Name Location GE Documents Status Remarks a) BOP report used. 235A1134 SB-1 Control On Panel No Seismic Qualifica-249A1307 Switch C61-P001 tion report received b) Documentation com-Completed. GE from GE. pleted. c) SQRT form completed. 164C5258 Indicator GE-180 On Panels

1. Resonance Search Documentation to show H13-P632 test.

adequacy is completed Completed H13-P642

2. Single axis dwell test at all frequencies.

a) GE Qua'lification 145C3238 Switch On Panal Seismic Qualifica-adequate Completed I Agastat H13-P623 tion report received b) Documentation Model GP from CE. completed c) SQRT form completed 1 4 4 4 -}}