ML19330C029

From kanterella
Jump to navigation Jump to search
Final Deficiency Rept Re Erroneous Output Readings in Model 1151A Pressure Transmitters Supplied by Rosemount,Inc. Transmitters Will Be Replaced.Further Corrective Actions Will Be Summarized in Bechtel Rept,GGNS-72
ML19330C029
Person / Time
Site: Grand Gulf  Entergy icon.png
Issue date: 07/22/1980
From: Julie Ward
BECHTEL GROUP, INC., BECHTEL POWER CORP.
To:
Shared Package
ML19330C025 List:
References
IEB-80-16, VB-80-0268, VB-80-268, NUDOCS 8008070440
Download: ML19330C029 (2)


Text

.

. .~

.r~y

<"> Bechtel Power Corporation Engineers-Constructors 15740 Shady Grove Road Gaithersburg, Maryland 20760 301-258 3000 .

u G2, r:r July 22, 19s0 JUL 2 81980 Of fice of Inspection & Enforcement cc:wce[.

, .. ,c . , , .

U.S. Nuclear Regulatory Cocsission Region II 101 Marietta Street, N.W .

Suite 3100 Atlanta , Georgia 30303 Attention: Mr. J. P. O 'Reilly , Director

Dear Mr . O 'Re illy :

Nuclear QA Is Applicable Middle South Energy, Inc.

Grand Gulf Nuclear Station Bechtel Job No. 9645 File: 0260/0512 Final Re port for Bechtel Power Corporation Deficiency Report No. J-80/01 in Compliance with 10CFR 21' V3-80/0268 Our letter of April 24, 1980, forwarded to you , in accordance with 10CFR Part 21, a report of a deficiency at the Grand Gulf Nuclear Station concerning Fase=ount 1151A pressure transmitters. Our letter also stated that we are investigating -

the matter and would report further within 90 days .

Since that time , your of fice has issued IE Bulletin No. 80-16 which identifies the Rosemount 1151A pressure transmitter problem.

On the Grand Gulf Nuclear Station, further investigation has revealed that there are ten (10) each Rosemount ll51A transsitters on Unit 1 and Unit 2 purchased by the Bechtel Power Corporation which are basic cesponents and =ay produce erroneous outputs when over-ranged or under-ranged in their present applications. Our corrective action will consist of replacing these transmitters with new transmitters

.t.ich do not have this same ambiguous characteristic in the, over-range and under-range condition , and which are qualified in accordance with IEEE 223-1974 and 1EEE 344-1975. Further details of the follow-up action specific to the Grand Gulf Nuclear Station (GCNS) will be su-=ari:ed in Bechtel Management Correc tive Ac tion Re po rt , GGNS-72 and will be available for your review at tha CGNS construction site , i For other Eechtel Power Corporation projects with construction per=its , f urther reports will be provided to you in response to IE 3ulletin 30-16.

g T I > , . .

1.,

i. 1 q

%. g. ,:

s  !

\ ==,/

8008070$O

r .

l i

e . - -

Bechtel Power Corporation  ;

U.S. Nuclear Regulatory Com::21ssion July 22 1980 Bechtel Job No. 9645 VB-50/02'68 This completes our response to the reporting requirements of 10CFR 21.

Should you require any additional info:mation, please so advise.

Very truly yours ,

J. . Jar P oject Manager JCClub b ec: J. 'P. McGaughy , Jr.

fil L. F. Dale , 2 C. K. McCoy -

T. H. Cloninger J J . Reaves A. Zaccaria J. M. Kocies B. K. Kanga Dr. D. C. Gibbs R. A. O 'Neil L. E. Ruhland D. M. Lake R. E. Brosm .

R. L. Scott

/

1 3e e LJ