ML19330B752

From kanterella
Jump to navigation Jump to search
Forwards LER 80-057/03L-0
Date released: 12/10/2019 Download: ML19330B752


LER 80-057/03L-0:on 800703,during Performance of Standby Liquid Control Relief Valve Test,Valve 1-C41-FO29B Did Not Lift.Caused by Valve Setpoint Drift.Setpoint Adjusted & Penetrant Test Performed Satisfactorily
ML19330B759
Person / Time
Site: Brunswick 
Issue date: 07/30/1980
From: Tollison A
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19330B759 (1)
Forwards LER 80-057/03L-0
ML19330B751
Person / Time
Site: Brunswick 
Issue date: 07/24/1980
From: Tollison A
CAROLINA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19330B751 (1)