ML19330B712

From kanterella
Jump to navigation Jump to search
Responds to NRC 800724 Telcon Re Criteria for Plugging Condenser Tubes.Procedure FNP-2-AOP-25.0, Condenser Leakage & Table 12 of Procedure FNP-0-CCP-102,revised to Add Feedwater Ph & Cation Conductivity Limits,Encl
Date released: 12/10/2019 Download: ML19330B712


Abnormal Operating Procedure,Condenser Leakage, Revised
ML19330B716
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 07/25/1980
From:
ALABAMA POWER CO.
To:
References
Download: ML19330B716 (7)
Responds to NRC 800724 Telcon Re Criteria for Plugging Condenser Tubes.Procedure FNP-2-AOP-25.0, Condenser Leakage & Table 12 of Procedure FNP-0-CCP-102,revised to Add Feedwater Ph & Cation Conductivity Limits,Encl
ML19330B711
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 07/29/1980
From: Clayton F
ALABAMA POWER CO.
To: SCHWENCER A
Office of Nuclear Reactor Regulation
References
Download: ML19330B711 (3)