Text
_ _
_ , _
. _
.-
_ _ _ _ _ _
_
_.
_
_
-
9,
UNITED STATES
[
g
,
NUCLEAR REGULATORY COMMISSION
REGION I
7.
\\*****
631 PARK AVENUE
KING OF PRUS$lA, PENNSYLVANIA 19406
Docket Nos. 50-245
50-336
Northeast Nuclear Energy Company
ATTN: Mr. W. G. Counsil
Senior Vice President - Nuclear
Engineering and Operations
P. O. Box 270
Hartford, Connecticut 06101
Gentlemen:
Subject:
Combined Inspection 50-245/80-07 and 50-336/80-05
This refers to the inspection conducted by Mr. J. Shedlosky of unis office on
May 4 through May 31, 1980 at the Millstone Nuclear Power Station,
Waterford, Connecticut, of activities authorized by NRC License Nos. DPR-21
and DPR-65 and to the discussions _of our findings held by Mr. Shedlosky with
Mr. Opeka and other members of your staff.at the conclusion of the inspection.
Areas examined during this inspection are described in the Office of Inspection
and Enforcement Inspection Report which is enclosed with thiscletter. Within
th'ese areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, measurements made by the
inspector, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were obse.ved.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Pa-t 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosed inspection
report will be placed in the NRC's Public Document Room.
If this report contains
ry information that you (or your contractor) believe to be proprietary, it is
necessary that you make a written application within 20 days to this office to
withhold such information from public disclosure. Any suc". application must be
accompanied by an affidavit executed by the owner of the bformation, which
,
'
identifies the document or part sought to be withheld, and which contains a
statement of reasons which addreases with specificity the items which will be
considered by the Conimission as listed in subparagraph (b)(4) of Section 2.790.
l
The information sought to be withheld shall be incorporated as far as possible
into a separate part of the affidavit.
If we do not hear from you in this
i
regard within the specified period, the report will be placed in the Public
Document Room.
l
800731036)
_.
---
-
--
._
-
.
--.-.
--
__
.
.
Northeast Nuclear Energy Company
2
JUN 1 s 1980
No reply to this letter is required; however, if you should have any
questions concerning this inspection, we will be pleased to discuss them
with you.
Sincerely,
//
v
Ed
. Brunner, Chief
R
tar Operations and Nuclear
upport Branch
-
Enclosure:
Office of Inspection and Enforcement Combined
Inspection Report Number 50-245/80-07 and 50-336/80-05
cc w/ encl:
J. F. Opeka, System Superintendent Nuclear Operations
.
E. J. Mroczka, Station Superintendent
D. G. Diedrick, Manager of Quality Assurance
J. R. Himmelwright, Licensing Safeguards Engineer
e
-
_ . , - . -