ML19330B199

From kanterella
Jump to navigation Jump to search
Forwards Second Interim Rept in Response to IE Bulletin 80-06.Since 800612 Interim Rept,Util Completed Review of Primary Containment Sys,Reactor Protection Sys,Rhr Sys & Core Spray Sys.Evaluation of Other Sys Underway
ML19330B199
Person / Time
Site: Browns Ferry  
Issue date: 07/11/1980
From: Cross J
TENNESSEE VALLEY AUTHORITY
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
IEB-80-06, IEB-80-6, NUDOCS 8007310067
Download: ML19330B199 (2)


Text

', Q TENNESSEE V4kt_EgAUTHORITY CHATTANOOGk[dNNESSEE 374o1 500A Chestnut Street Tower II

  • y fj gg Mr. James P. O'Reilly, Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Region II - Suite 3100 101 Marietta Street Atlanta, Georgia 30303 Dea. Mr. O'Reilly:

OFFICE OF INSPECTION AND ENFORCEMENT BULLETIN 80 RII:JPO 50-259, -260, -296 - BROWNS FERRY NUCLEAR PLANT In response to your March 13, 1980, letter which transmitted OIE Bulletin 80-06, TVA submitted an interim report on June 12, 1980.

The June 12 response provided the results of our investigations to date and committed to monthly updates on the status of our review. Enclosed is the second interim report for the Browns Ferry Nuclear Plant.

Very truly yours, TENNESSEE VALLEY AUTHORITY

""""U

.mmy L. Cross E tecutive Assistant to the Manager of Power Subscribed an sworn t ef re me this

//

day o./

1 1980.

.4?

/NcTtap ~PUblic My Commission Expires N '$ Y / 9 7 6 7

i Enclosure 1

cc: Office of Inspection and Enforcement (Enclosure)

U.S. Nuclear Regulatory Commission Division of Reactor Operations Inspection Washington, DC 20555 i

3007310O N An Equal Opportunity Employer l

< 3 ENCLOSURE RESPONSE TO OIE BULLETIN 80-06 SECOND INTERIM REPORT BROWNS FERRY NUCLEAR PLANT INTERIM PROGRESS Since our June l',1980, rubmittal for the Biowns Ferry Nuclear Plant, TVA has completed the drawing review for the following systems:

a.

Primary Containment System b.

Reactor Protection System c.

RHR System d.

Core Spray System We are continuing our evaluation of the remaining systems to determi :

the scope of testing required.

1 O

f e

1 e

n-