ML19330B070

From kanterella
Jump to navigation Jump to search
Forwards QA Program Insp Rept 99900712/80-01 on 800325-26 & Notice of Deviation
ML19330B070
Person / Time
Issue date: 04/14/1980
From: Potapovs U
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Capra L
SYSTEMS CONTROL, INC.
Shared Package
ML19330B065 List:
References
REF-QA-99900712 NUDOCS 8007300192
Download: ML19330B070 (2)


Text

._

(] J '-.# "'%,,'s UNITED STATES NUCLEAR REGULATORY COMMISSION V

  • 1 REGloN IV

't' Y

611 RY AN Pt.AZA DRIVE. SulTE 1000 2

%j

', f ARLINGTON, TEXAS 76012 14 APR fce0 N %.=

Docket No. 99900712/80--01 Systems Control Division of M. J. Electric, Inc.

Attn:

Mr. L. A. Capra Senior Vice President PO Box 788 Iron Mountain, Missouri 49801 Gentlemen:

This refers to the QA Program inspection conducted by Mr. L. E. Ellershaw of this office on March 25-26, 1980, of your facility at Iron Mountain, Michigan, associated with the fabrication of nuclear instrument panels and to the dis-cussions of our findings with Mr. '4. J. Brule, you, and members of your staff at the conclusion of the inspection.

This inspection was made to confirm that, in the areas inspected, your QA Program is being effectively implemented. The Lepection effort is not designed to assure that unique quality requirements imposed by a customer are being i=plemented; nor to assure that a specific product, component or service provided by you to your customers, is of acceptable quality.

As you know, the NRC requires each of its licensees to assume full responsibility for the quality of specific products, components or services procured from others.

You should therefore not conclude that the NRC's inspection exempts you from inspections by an NRC licensee or his agents nor from taking effective cor-rective action in response to their findings.

Areas examined and our findings are discussed in the enclosed report.

'41 thin these areas, the inspection consisted of an examination of procedures and representative recoras, interviews with personnel, and observations by the inspecto r.

During the inspection it was found that the implementation of your QA Program failed to meet certain NRC requirements. The specific findings ed references to the pertinent requirements are identified in the enclosures to this letter.

Please provide us within thirty (30) days of your receipt of this report a written statement containing, (1) a description of steps that have been or will be taken to correct these items, (2) a description of steps that have been or will be taken to prevent recurrence, and (3) the date your correceive actions and preventive measures were or will be completed.

8007300l4 A

g a

Systems Control 2

In accordance with Section 2.790 of the Commission's " Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, a copy of this letter with enclosure and your reply, together with the enclosed inspection report will be placed in the Commission's Public Document Room.

If this report contains any information that you believe to be proprietary, it is necessary that you nake a written application within thirty (30) days to this office to withhold such information from public disclosure.

Any such application nust include a full statement of the reasons on the basis of which it is claimed that the informa-tion is proprietary, and should be prepared so that proprietary information identified in the application is contained in a separate part of the document.

If we do not hear from you in this regard within the specified period, the report will be placed in the Public Document Room.

Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely, N.

p

/

7tt0

^

Uldis Potapovs, Chier Vendor Inspection Branci,

Enclosures:

1.

Notice of Deviation 2.

Inspection Report No. 99900712/30-01 4

- -