ML19330B030

From kanterella
Jump to navigation Jump to search
Forwards Status Rept on Facility SER Inputs.Inputs on 24 Items Are Still Outstanding.Ser Will Not Be Ready in Time for Commission 800728 Briefing Unless Approx Input Dates Are Improved
ML19330B030
Person / Time
Site: Sequoyah 
Issue date: 07/18/1980
From: Kenyon T
Office of Nuclear Reactor Regulation
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
NUDOCS 8007300052
Download: ML19330B030 (1)


Text

.

3EGElddid 000!3 Fi!.E CON aut 1s a30 30CEl.1 Docket No. 50-327 MEMORANDUM FOR:

Darrell G. Eisenhut, Director Division of Licensing THRU:

Robert L. Tedesco, Assistant Director for Licensing A.. Schwencer, Chief, Licensing Branch No. 2 Division of Licensing FROM:

Thomas Kenyon, Licensing Branch No. 2, Division of Licensing

SUBJECT:

STATUS REPORT ON SEQUOYAH UNIT NO. 1 1.

Plant Status Low Power Test No. 1, 2, 3, 4, 5, 7, 8, 9A, and 98 have been completed satisfactorily.

I/E witnested all the above tests at least tudes through. Tests 7 and 98 are to be repeated this weekend. Test 6 will be performed for the first time about 7/21/80. Mr. N. Anderson, PTRB, was present to witness some of the tests.

2.

Safety Review Status Not all SER inputs, which were due on or befom today (7/18/80), have been mceived. Attached is a copy of the status report on SER inputs on the full power issues. Inputs on 19 issws am complete while inputs on 24 items are still outstanding. Promised input dates are approximate. Unless these dates are improved, the SER will not be ready in time for the Commissica briefing scheduled for the week of July 28,1980.

l W Kenyon l

Licensing Branch No. 2 Division of Licensing

)

Enclosure:

Amendment: As Stated Above g 1 ec: HRDenton i

EGCase 00 i

RTedesco CD h

U U

ASchwencer D

NRR Division Dimetors NRR Assistant Directors x

B. Grime <

\\

\\

i

.0.

OFFICE A '.

.. KeDyQn.

.RIe Co..

Chwender.

SURNAME 8 0 07 8 O'OOSSL/ -

W

- 'D*-

S!*

NaC FORM 318 (9-76) NRCM 0240 WU.S. GOVERNMENT PRINTING OFFI En 1979 269-36