Forwards IE Insp Rept 70-1100/80-03 on 800428-0501 & Notice of Violation.Notice of Violation Withheld (Ref 10CFR2.790)
ML19330A645
Person / Time
Site: 07001100
Issue date: 05/22/1980
From: Martin W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Lichtenberger
ABB COMBUSTION ENGINEERING NUCLEAR FUEL (FORMERLY
Shared Package
ML19330A643 List:
References
NUDOCS 8007280743
Download: ML19330A645 (2)


Text

- ~ ~. ~.

(^'7., -.

v UNITED STATES ao

  • o NUCLEAR REGULATORY COMMisslON R EGION I n

631 PARK AVENUE xius or Prussia, eennsvi.vania is40s gg Docket No. 70-1100 Combustion Engineering, Inc.

ATTN: Mr. H. V. Lichtenberger Vice President - Nuclear Fuel Nuclear Power Systems - Manufacturing P. O. Box 500 Windsor, Connecticut 06095 Gentlemen:

Subject:

Inspection 70-1100/80-03 This refers to the inspection conducted by Mr. I. Cohen of this office on April 28 - May 1,1980 of activities authorized by NRC License No. SNM-1067 and to the discussions of our findings held by Mr. Cohen with Mr. T. Bowie of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the Office of Inspection and Enforcement Inspection Report which is enclosed with this letter.

Wi thin these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observations by the inspector.

i Our inspector also verified the steps you had taken to correct the Items of Non-compliance brought to your attention in letters dated December 13, 1979 and March 26,1980. We have no further questions regarding your actions at this time.

Based on the results of this inspection, it appears that one of your activities was not conducted in full compliance with NRC requirements, as set forth in the Notice of Violation, enclosed herewith as Appendix A.

.This item of noncompliance has been categorized into the levels as described in our correspondence to you dated December 31, 1974.

This notice is sent to you pursuant to the provisions of Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations.

Section 2.201 requires you to submit to this office, within twenty (20) days of your receipt of this notice, a written statement or explanation in reply including:

(1) corrective steps which have been taken by you and the results achieved; (2) corrective steps which will be taken to avoid further items of noncompliance; and (3) the date when full compliance will be achieved.

soonso 7D

ww EN-w

  • e.senemi-we ew.

aw-

+wemr--.-

g.

Combustion Engineering, Inc.

2 2 2 MAY 1980

. In accordance with Section 2.790(d) of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations, documentation of findings of jour control and accounting procedures for safeguarding special nuclear materials and your facility security procedures are exempt from disclosure; therefore, the en-closures to this letter, and your response to this letter will not be placed in the Public Document Room and will receive limited distribution.

Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely, n

Walter G. f1artin, Chief Safeguards Branch

Enclosures:

1.

Appendix A, Notice of Violation (Contains 2.790 Information) 2.

Office of Inspection and Enforcement Inspection Report Number 70-1100/80-03 (Contains 2.790 Info)

.