NRC FORM 366 U. S. NUCLEAR REGULAT!RY COMMISSION (7 77)
LICENSEE EVENT REPORT CONTROL BLOCK: l l
l l
l l
lh (PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION) l0 lH lD lB lS l1 l@l 0l 0l 0l 0l 0l 0l 0l0 l0 l0 l0 l@l 4l 1l 1l 1l 1l@!
l l@
7 8 9 LICENSEE CODE 14 15 LICENSE NUMdER 25 26 LICENSE TYPE JO 57 CAT 68 CON'T
[ TIE S$Ry l L l@l 0 l 5 l0 l-l0 l3 l4 l6 @l 01 61 2 l 7 l 8 l l@l 0 l 7 l 2 ] 3 l 8 l O l@
7 8
60 61 DOCKET NUMBER 68 69 EVENT DATE 74 75 REPORT DATE 80 EVENT DESCp PTION AND PROB ABLE CONSEQUENCES h o 2 l(NP-33-80-65) On 6/27/80 at 1007 hours0.0117 days <br />0.28 hours <br />0.00167 weeks <br />3.831635e-4 months <br />, the output of NI-1 failed to zero.
At the l
lTTT1 I time, a fuel assembly was being moved, placing the unit in the action statement of I
~lol4l l Technical Specification 3.9.2.
Since the fuel assembly was almost entirely removed l
ITTTl lfrom the core, the assembly was removed and placed in a support rack.
All further I
1016 l l core alterations were stopped. There was no dancer to the health and safety of rhn l
l017 l lpublic or station personnel. Redundant indication was continuous 1v available from I
Io la l lNI-2.
I 7
8 9 80 SYSTEM
CAUSE
CAUSE COMP.
VALVE CODE CODE SU8 CODE COMPONENT CODE SUSCCDE SUBCODE l Il Dj@ W@ W@ lI lN lS lT lR lU l@ [Ej @ (_Z_j @
o 9 7
8 9
10 11 12 13 18 19 20 SEQUENTIAL OCCURRENCE REPORT REVISION LER/RO EVENT YE AR R EPORT NO.
CODE TYPE N O.
@ gu l8 l0 l l-l l Ol 5l 4l l/l l 0l 3l lLl l-l l0 l RE
_ 21 22 23 24 26 27 N
N 30 31 32
/N AC N
ON PL NT ME HOURS 22 S8 IT FORP 8.
SUPPLI MANUFA TURER F l@F l@
lZl@
IZi@
10101010 l lYl@
W@
lZ l@
l Zl 9l 9l 91@
33 34 35 36 37 40 41 42 43 44 47 CAUSE OESCRIPTION AND CORRECTIVE ACTIONS h g [The exact cause is unknown but may be due to an intermittent eroundine problem or com-1 i i iponent failure.
Station instrument ground problems are beine investignend Imanr m I
179-429.
NI-l was checked under Maintenance Work Order IC-479-80 and found to be
, 2 g l operating normally.
ST 5091.01 was performed satisfactorily and NI-l s.
- lared l operable at 1505 hours0.0174 days <br />0.418 hours <br />0.00249 weeks <br />5.726525e-4 months <br />.
l i 4 7
8 9 80 SA S
% POWER OTHER STATUS iO RY DISCOVERY DESCRIPTION W lH l@ l 0 l 0 l 0 l@l NA l
lAl@lControlRoomIndication l
A TIVITY CO TENT RELEASED OF RELEASE AMOUNT OF ACTIVITY LOCATION OF RELE ASE 1 6 lZ l @ W@l NA l
l NA l
7 8 9 to 11 44 45 80 PERSONNEL EXPOSURES NUMBER TYPE
DESCRIPTION
L'J.2I lo le 10 l@lz l@l NA l
So
' PERSONd'imU4ES DESCRiPTiO~@
NUMBER l0l0l0l@l NA l
t a 8 9 11 12 80 LOSS OF OR DAMAGE To FACILITY TY'E
DESCRIPTION
lZ l@l NA l
i 9 7
8 9 10 80 PUBL ICITT 8007sp 5%9 "S"
ISSUED E5CRIPTION
[1,[0_l lN l(m NA l
l l l l l l l l l l l l l :3 l7 8 9 I"
68 69 80 ;;;
DVR 80-104 ME OF PREPARER PHONE:
TOLEDO EDISON COMPANY DAVIS-8 ESSE NUCLEAR POWER STATION UNIT ONE SUPPLEMENTAL INFORMATION FOR LER NP-33-80-65 DATE OF EVENT: June 27, 1980 FACILITY: Davis Besse Unit 1 IDENTIFICATION OF OCCURRENCE:
Source Range Nuclear Instrumentation Channel 2 (NI-1)
Failure Conditions Prior to Occurrence: The unit was in Mode 6 with Power (MWT) = 0 and Lead (Gross MWE) = 0.
Drscription of Occurrence: On June 27, 1980 at about 1007 hours0.0117 days <br />0.28 hours <br />0.00167 weeks <br />3.831635e-4 months <br />, the output of NI-l failed to zero. At the time a fuel assembly was in the process of being moved and was approximately 3/4 of.the way out of the core. This placed the unit in the action statement of-Technical Specification 3.9.2 which requires all core alterations to be suspended until both source range channels are operable.
Since the fuel assembly baing moved was almost entirely removed from the core, the Shif t Supervisor determined it would be' safer to complete the fuel assembly removal. Removing the assembly removes positive reactivity from the core. To have reinserted the assembly would have added positive reactivity to the core. The assembly was removed and placed in a support rack in the refueling canal.
All further core alterations were stopped.
t Designation of Apparent Cause of Occurrence: The exact cause of this occurrence is I
unknown, but has the characteristics of being an intermittent grounding problem, or intermittent failure of an unknown compdnent.
Station instrument ground problems are currently being investigated under Facility Change. Request (FCR)79-429.
Analysis of Occurrence: There was no danger to the health and safety of the public cr to station personnel. Redundant indication was continuously available from NI-2.
Corrective Action
Maintenance Work Order (MWO) IC-479-80 was issued to trouble-ghoot and repair NI-1.
The channel was put in test and found to operate normally.
The power supply was then de-energized, and-the cables checked for shorts and opens.
The preamplifier was opened,and inspected for moisture or heat related problems. All inspection results were negative, and the channel re-energized. When power was res-tored, the channel was found'to be operating normally. ST 5091.01, Source Range Functional Check, was performed and the channel declared operable at 1505 hours0.0174 days <br />0.418 hours <br />0.00249 weeks <br />5.726525e-4 months <br />, thus removing the unit from the action statement of Technical Specification 3.9.2.
Data currently being taken under FCR 79-429 concerning station grounding problems will
+
ba evaluated.
If the problem re-occurs, portions of the FCR test involving source range channel 2 will again be performed in an attempt to isolate the intermittent problem.
Failure Data: There have been several previous similar failures of NI-1.
See Licensee' Event. Reports NP-33-77-79, NP-33-77-88, NP-33-77-100, NP-33-78-110, NP-33-79-87,
. cad NP-33-79-107.
LER #80-054
|
|---|
|
|
| | | Reporting criterion |
|---|
| 05000346/LER-1980-001, Forwards LER 80-001/01T-0 | Forwards LER 80-001/01T-0 | | | 05000346/LER-1980-001-01, /01T-0:on 800103,during Plant Heatup,Safety Features Actuation Sys Channels 1 & 3 Tripped at 1,600 Psig, Causing Level 2 Actuation.Operators Correctly Tripped Reactor Coolant Pumps.Caused by Procedural Deficiency | /01T-0:on 800103,during Plant Heatup,Safety Features Actuation Sys Channels 1 & 3 Tripped at 1,600 Psig, Causing Level 2 Actuation.Operators Correctly Tripped Reactor Coolant Pumps.Caused by Procedural Deficiency | | | 05000346/LER-1980-002, Forwards LER 80-002/03L-0 | Forwards LER 80-002/03L-0 | | | 05000346/LER-1980-002-03, /03L-0:on 800103,after Actuating of Safety Features Actuation Sys Level 2,demin Water Valve DW68318 Did Not Indicate Closed & Monitor Light Did Not Indicate Properly.Caused by Maladjusted Position Indicator Switch | /03L-0:on 800103,after Actuating of Safety Features Actuation Sys Level 2,demin Water Valve DW68318 Did Not Indicate Closed & Monitor Light Did Not Indicate Properly.Caused by Maladjusted Position Indicator Switch | | | 05000346/LER-1980-003-03, /03L-0:on 800103,during Auxiliary Feedwater Pump Test,Pump l-1 Was Declared Inoperable.Caused by Improperly Adjusted Slip Clutch Between Governor Manual Speed Adjustment Shaft & Remotely Controlled Speed Changer Motion | /03L-0:on 800103,during Auxiliary Feedwater Pump Test,Pump l-1 Was Declared Inoperable.Caused by Improperly Adjusted Slip Clutch Between Governor Manual Speed Adjustment Shaft & Remotely Controlled Speed Changer Motion | | | 05000346/LER-1980-003, Forwards LER 80-003/03L-0 | Forwards LER 80-003/03L-0 | | | 05000346/LER-1980-004-03, /03L-0:on 800107,control Rod 5-11 Absolute Position Indication Declared Inoperable Due to Fluctuating Signals.Possibly Caused by Isolation of Position Indication Cabling & Electrical Penetration | /03L-0:on 800107,control Rod 5-11 Absolute Position Indication Declared Inoperable Due to Fluctuating Signals.Possibly Caused by Isolation of Position Indication Cabling & Electrical Penetration | | | 05000346/LER-1980-004, Forwards LER 80-004/03L-0 | Forwards LER 80-004/03L-0 | | | 05000346/LER-1980-005, Forwards LER 80-005/03L-0 | Forwards LER 80-005/03L-0 | | | 05000346/LER-1980-005-03, /03L-0:on 800110,Tech Spec Late Date Passed W/O Performance of Boric Acid Flowpath Heat Tracing Weekly Test. Caused by Known Deficiency in Design of Sys Resulting in Inability to Maintain Min Temp Necessary During Startup | /03L-0:on 800110,Tech Spec Late Date Passed W/O Performance of Boric Acid Flowpath Heat Tracing Weekly Test. Caused by Known Deficiency in Design of Sys Resulting in Inability to Maintain Min Temp Necessary During Startup | | | 05000346/LER-1980-006-03, /03L-0:on 800112,found Fiberglass Insulation Stuffed Into Open Wall Ventilator Between Water Treatment Bldg & Svc Water Valve Room,Causing Fire Damper to Be Inoperable.Figerglass Removed | /03L-0:on 800112,found Fiberglass Insulation Stuffed Into Open Wall Ventilator Between Water Treatment Bldg & Svc Water Valve Room,Causing Fire Damper to Be Inoperable.Figerglass Removed | | | 05000346/LER-1980-006, Forwards LER 80-006/03L-0 | Forwards LER 80-006/03L-0 | | | 05000346/LER-1980-007, Forwards LER 80-007/03L-0 | Forwards LER 80-007/03L-0 | | | 05000346/LER-1980-007-03, /03L-0:on 800116,ref Position Verification for Group 5,rod 11,was Made 1-h & 40 Minutes Late.Caused by Operator Oversight Due to Lack of Adequate Reminder Sys. Multiple Timer Sys Will Prevent Recurrence | /03L-0:on 800116,ref Position Verification for Group 5,rod 11,was Made 1-h & 40 Minutes Late.Caused by Operator Oversight Due to Lack of Adequate Reminder Sys. Multiple Timer Sys Will Prevent Recurrence | | | 05000346/LER-1980-008-03, Gap Discovered in Wall Where Five two-inch Conduits Go from Electrical Penetration Room 2 to Cable room.Six-inch Gap Around Ventilation Duct Also Found.Caused by Improper Initial Installation | Gap Discovered in Wall Where Five two-inch Conduits Go from Electrical Penetration Room 2 to Cable room.Six-inch Gap Around Ventilation Duct Also Found.Caused by Improper Initial Installation | | | 05000346/LER-1980-008, Forwards Revised LER 80-008/03L-1 | Forwards Revised LER 80-008/03L-1 | | | 05000346/LER-1980-009, Forwards LER 80-009/03L-0 | Forwards LER 80-009/03L-0 | | | 05000346/LER-1980-009-03, /03L-0:on 800122,discovered That NI-7 Indication on Computer Group 38 Was Reading Less than Heat Balance Power,Putting NI-7 Below Instrumentation Operability Limit Line.Caused by Extremely Tight Calibr Band at 100% Power | /03L-0:on 800122,discovered That NI-7 Indication on Computer Group 38 Was Reading Less than Heat Balance Power,Putting NI-7 Below Instrumentation Operability Limit Line.Caused by Extremely Tight Calibr Band at 100% Power | | | 05000346/LER-1980-010-01, /01T-0:on 800214,reanalysis of RCS Pipe Restraints Per IE Insp Rept 50-346/79-23 Revealed Design Deficiency on Two Reactor Coolant Hot Leg Pipe Whip Restraints at Top of Each RCS Hot Leg.Caused by Design Error | /01T-0:on 800214,reanalysis of RCS Pipe Restraints Per IE Insp Rept 50-346/79-23 Revealed Design Deficiency on Two Reactor Coolant Hot Leg Pipe Whip Restraints at Top of Each RCS Hot Leg.Caused by Design Error | | | 05000346/LER-1980-010, Forwards LER 80-010/01T-0 | Forwards LER 80-010/01T-0 | | | 05000346/LER-1980-011, Forwards LER 80-011/03L-0 | Forwards LER 80-011/03L-0 | | | 05000346/LER-1980-011-03, /03L-0:on 800131,during Normal Operation, Operations Personnel Received Half Trip on Steam & Feedwater Rupture Control Sys Channels 1/3.Caused by Spurious Trip from +25 Volt Dc Power Supply PS03 in Sglic Channel 1 | /03L-0:on 800131,during Normal Operation, Operations Personnel Received Half Trip on Steam & Feedwater Rupture Control Sys Channels 1/3.Caused by Spurious Trip from +25 Volt Dc Power Supply PS03 in Sglic Channel 1 | | | 05000346/LER-1980-012-03, /03L-0:on 800201,operator Noticed Loss of Control Room Position Indication for Letdown Cooler Isolation Valve MU2A.Caused by Design Deficiency.Apparently,Someone Brushed Up Against Disconnect Breaker Switch.Switch Reposition | /03L-0:on 800201,operator Noticed Loss of Control Room Position Indication for Letdown Cooler Isolation Valve MU2A.Caused by Design Deficiency.Apparently,Someone Brushed Up Against Disconnect Breaker Switch.Switch Repositioned | | | 05000346/LER-1980-012, Forwards LER 80-012/03L-0 | Forwards LER 80-012/03L-0 | | | 05000346/LER-1980-013, Forwards LER 80-013/03L-0 | Forwards LER 80-013/03L-0 | | | 05000346/LER-1980-013-03, /03L-0:on 800208,w/reactor Startup in Progress, Personnel Noted Control Rod 5-11 Absolute Position Indication Was Not Responding.Caused by Blown Fuse F14 in Position Ref Panel | /03L-0:on 800208,w/reactor Startup in Progress, Personnel Noted Control Rod 5-11 Absolute Position Indication Was Not Responding.Caused by Blown Fuse F14 in Position Ref Panel | | | 05000346/LER-1980-014, Forwards LER 80-014/03L-0 | Forwards LER 80-014/03L-0 | | | 05000346/LER-1980-014-03, /03L-0:on 800208,pressurizer Sample Sys Containment Isolation Valve RC240B Failed to Close Twice. Caused by Improper Torque Switch Setting & Stripped Screw on Closing Contactor.Settings Readjusted & Switch Replaced | /03L-0:on 800208,pressurizer Sample Sys Containment Isolation Valve RC240B Failed to Close Twice. Caused by Improper Torque Switch Setting & Stripped Screw on Closing Contactor.Settings Readjusted & Switch Replaced | | | 05000346/LER-1980-015, Forwards LER 80-015/03L-0 | Forwards LER 80-015/03L-0 | | | 05000346/LER-1980-015-03, /03L-0:on 800210,during Normal Startup,Control Rod 5-11 Absolute Position Indication Declared Inoperable.Caused by Numerous Asymmetric Rod Alarms.Data from Current Failure Evaluated | /03L-0:on 800210,during Normal Startup,Control Rod 5-11 Absolute Position Indication Declared Inoperable.Caused by Numerous Asymmetric Rod Alarms.Data from Current Failure Evaluated | | | 05000346/LER-1980-016, Forwards LER 80-016/03L-0 | Forwards LER 80-016/03L-0 | | | 05000346/LER-1980-016-03, /03L-0:on 800213,while Reviewing Station Log,Shift Foreman Discovered That Containment Airlock Seal Leakage Test Had Not Been Performed After Last Entry Into Containment During Startup.Caused by Procedural Inadequacy | /03L-0:on 800213,while Reviewing Station Log,Shift Foreman Discovered That Containment Airlock Seal Leakage Test Had Not Been Performed After Last Entry Into Containment During Startup.Caused by Procedural Inadequacy | | | 05000346/LER-1980-017-03, /03L-0:on 800217,operations Personnel Noted That Safety Features Actuation Sys Channel 3 Borated Water Storage Tank Level Indication Was Six Feet Higher than Other Meters.Caused by Freezing of Transmitter Sensing Line | /03L-0:on 800217,operations Personnel Noted That Safety Features Actuation Sys Channel 3 Borated Water Storage Tank Level Indication Was Six Feet Higher than Other Meters.Caused by Freezing of Transmitter Sensing Line | | | 05000346/LER-1980-017, Forwards LER 80-017/03L-0 | Forwards LER 80-017/03L-0 | | | 05000346/LER-1980-018-03, /03L-0:on 800226,safety Features Actuation Sys Channel 3 Borated Water Storatge Tank Level Indication Was Discovered Reading Four Feet Higher than Other Three Channels.Caused by Inadequate Design of Freeze Protection | /03L-0:on 800226,safety Features Actuation Sys Channel 3 Borated Water Storatge Tank Level Indication Was Discovered Reading Four Feet Higher than Other Three Channels.Caused by Inadequate Design of Freeze Protection | | | 05000346/LER-1980-018, Forwards LER 80-018/03L-0 | Forwards LER 80-018/03L-0 | | | 05000346/LER-1980-019, Forwards LER 80-019/01T-0 | Forwards LER 80-019/01T-0 | | | 05000346/LER-1980-019-01, /01T-0:on 800325 Reactor Flux/Flow Trip Setpoints Were Not Verified to Be Properly Reset within 4-h of Manual Shutdown of Rcp.Caused by Attention Given to Feedwater Swings.Trip Setpoints Verified Later | /01T-0:on 800325 Reactor Flux/Flow Trip Setpoints Were Not Verified to Be Properly Reset within 4-h of Manual Shutdown of Rcp.Caused by Attention Given to Feedwater Swings.Trip Setpoints Verified Later | | | 05000346/LER-1980-020, Forwards LER 80-020/03L-0 | Forwards LER 80-020/03L-0 | | | 05000346/LER-1980-020-03, /03L-0:on 800306,control Operator Noted No Control Room Indication for Containment Vacuum Relief Isolation Valve CV5072.Caused by Breaker BE1139 Being Closed,Probably Resulting from Someone Bumping Into Breaker | /03L-0:on 800306,control Operator Noted No Control Room Indication for Containment Vacuum Relief Isolation Valve CV5072.Caused by Breaker BE1139 Being Closed,Probably Resulting from Someone Bumping Into Breaker | | | 05000346/LER-1980-021, Forwards LER 80-021/03L-0 | Forwards LER 80-021/03L-0 | | | 05000346/LER-1980-021-03, /03L-0:on 800313,during Diesel Fire Protection Pump Weekly Test,Pump Could Not Be Stopped W/Control Button. Once Stopped,Pump Could Not Be Started.Cause Not Determined by Scheme Check.Retrial of Pump Proved Successful | /03L-0:on 800313,during Diesel Fire Protection Pump Weekly Test,Pump Could Not Be Stopped W/Control Button. Once Stopped,Pump Could Not Be Started.Cause Not Determined by Scheme Check.Retrial of Pump Proved Successful | | | 05000346/LER-1980-022-03, /03L-0:on 800317,operations Personnel Noticed Loss of Control Room Indication for Containment Dihydrogen Analyzer 2 Discharge Line Valve CV5010E.Caused by Const Personnel Accidentally Opening Breaker | /03L-0:on 800317,operations Personnel Noticed Loss of Control Room Indication for Containment Dihydrogen Analyzer 2 Discharge Line Valve CV5010E.Caused by Const Personnel Accidentally Opening Breaker | | | 05000346/LER-1980-022, Forwards LER 80-022/03L-0 | Forwards LER 80-022/03L-0 | | | 05000346/LER-1980-023, Forwards LER 80-023/03L-0 | Forwards LER 80-023/03L-0 | | | 05000346/LER-1980-023-03, /03L-0:on 800327,discovered That Control Rod Groups 3 & 4 Were Moving in on Their Own.Group 3 Was 0% Withdrawn.Group 4 Was 90% Withdrawn.Caused by Component Failure.Component Replaced | /03L-0:on 800327,discovered That Control Rod Groups 3 & 4 Were Moving in on Their Own.Group 3 Was 0% Withdrawn.Group 4 Was 90% Withdrawn.Caused by Component Failure.Component Replaced | | | 05000346/LER-1980-024-03, /03L-0:on 800327,following Normally Initiated Reactor Trip,Auxiliary Feed Pump Turbine 1-2 Main Steam Isolation Valve MS-107 Closed.Cause Unknown.Further Investigation of Valve & Operator Will Be Pursued | /03L-0:on 800327,following Normally Initiated Reactor Trip,Auxiliary Feed Pump Turbine 1-2 Main Steam Isolation Valve MS-107 Closed.Cause Unknown.Further Investigation of Valve & Operator Will Be Pursued | | | 05000346/LER-1980-024, Forwards LER 80-024/03L-0 | Forwards LER 80-024/03L-0 | | | 05000346/LER-1980-025-03, /03X-1:on 800330,control Rod Group 5,rod 11 Absolute Position Indication Declared Inoperable.Caused by Fluctuating Signals Resulting in Numerous Asymmetric Rod Alarms Due to Defective Reed Switch Assemblies | /03X-1:on 800330,control Rod Group 5,rod 11 Absolute Position Indication Declared Inoperable.Caused by Fluctuating Signals Resulting in Numerous Asymmetric Rod Alarms Due to Defective Reed Switch Assemblies | | | 05000346/LER-1980-025, Forwards LER 80-025/03X-1 | Forwards LER 80-025/03X-1 | |
|