ML19329F327

From kanterella
Jump to navigation Jump to search
Forwards Rept of Insp on 760624 & 25,evaluating Nonconforming Reinforcing Steel at Facility Per 760504 Request
ML19329F327
Person / Time
Site: Midland
Issue date: 07/14/1976
From: Seyfrit K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To: Hunnicutt D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML19329F317 List:
References
NUDOCS 8006250416
Download: ML19329F327 (1)


Text

. _ _ _

l <*

O

. Q U "'"

O V

JUL 14 M*J D. U. hunnicutt, Chief, Rc.ctor Construction cdd i

Engineering Suppert Branch, IE:III EVALUATION C:: NCICOUro.TII1!C EElliF0ECIUG STEEL AT CONSUID2S POUCR CafPAHY, HIDLMD, Uli1TS 1 AND 2 DOCEET NOS. 510-329/330 (AITS F30132111) i Enclosed in the reporc of the inspection completed by R. Shevaaher of ny ctcff on June 24 cud 25, 1976, when he acepepcaicd I. Yin of your a

staff to the Lcchtel office 2 in Ann Arbor, !Ilchinen. This assicconce ou the above cubject was provided in response to a request contained in a ictecr directed to no by D. W. Esycs, dated May 4, 1976.

The enclosed report can either be used as is for e details section or integrated into a inrger report sfulch your office ui2hc vich to preparo.

In etsnary,18 has been concluded that the sixteen itens listed in the !!ay 4,1976 Ictter should be considered as reco1ved.

O Karl V. Seyfrit. Chief Reactor Technical Assistence Ersuch Offica of Inspection and Enforecsont

Enclosure:

Details Section: Inspection at acchtel (Ann Arbor) on MidL'nd, Units 1 and 2

,cc w/cnclosure:

j R. Warnick, IE:11Q if i

I fi t

l M

l i'm RIP 681 F3 0182 R1 2

II:RTD IE:RTB mesh.wmaker tvscyfrie

- 8006250pg mak 7/ /76 7/ /76

--,--n-

---n-

,e,n,,

_y

.y

-