Notice of Violation from Insp on 760419-21,0503,06-07,13-14 & 20 & 0607-08
ML19329F320
Person / Time
Site: Midland
Issue date: 08/02/1976
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML19329F317 List:
References
50-329-76-04, 50-329-76-4, 50-330-76-04, 50-330-76-4, NUDOCS 8006250408
Download: ML19329F320 (3)


Text

7 A

i ENCLOSURE Consumers Power Company License No. CPPR-81 License No. CPPR-82 NOTICE OF VIOLATION Based on the results of inspections conducted during April and May,1976, of quality assurance activities related to your Midland site, it appears that certain of your activities as indicated below were not conducted in full compliance with NRC requirements. These items are considered to be infractions.

1.

10 CFR Part 50, Appendix B, Criterion V, states in part,

" Activities affecting quality shall be prescribed by documented. instructions, procedures,.or drawings...."

Contrary to this requirement, documented instructions were not available for the drilling and placement of rcinforce-ment steel dowels which were being imbedded in concrete structure to replace omitted rebar.

2.

10 CFR Part 50, Appendix B, Criterion V, states in part, j

" Activities affecting quality shall be prescribed by

/

document'ed instructions,. procedures, or drawings..

and shall be accomplished in accordance with documented instructions, procedures, or drawings...."

Bechtel Power Corporation Field Inspection Procedure G-3, which implements the requirements of Criterion V, states in Section 4.10.1 and 4.10.3 that, "The PFQCE (Project Field Quality Control Engineer) shall route a copy of the completed NCR to the organization responsible for control of the activity which apparently caused the nonconformance.

Each such organization will evaluate the feedback informa-tion provided by the NCR and initiate whatever corrective action may be warranted to prevent recurrence." and "The PFQCE shall also route a copy of the completed NCR to the site QAE for his evaluation and use in determining the need for corrective action to prevent recurrence."

Contrary to these requirements, nonconformance reports concerning reinforcement steel deficiencies were not adequately evaluated to determine the need for corrective action to prevent recurrence, either by the organization responsible for control of the activity or by the quality assurance engineer.

,8006250 I

m

/}

( j 3.

10 CFR Part 50, Appendix B, Criterion X states in part, "A program for inspection of activitics affecting quality shall be established and executed by or for the organization performing the activity, to verify conformance with the documented instructions, procedures, and drawings for accomplishing the activity.

Examinations, measure-ments, or tests of material or products processed shall be performed for each work operation where necessary to assure quality.

Contrary to the above, ir. some instances,Jnstallation of reinforcement steel on rafety-related structures re-quiring inspection were not adequately inspected to verify conformance with applicable drawings.

i s

4.

10 CFR Part 50, Appendix B, Criterion XVI, requires that,

" Measures shall be established.to assure that conditions adverse to quality, such as failures, malfunctions, deficiencies, deviations, defective material and equipment, and nonconformances are prom'ptly identified and corrected.

In the case of significant conditions adverse to quality, the measures shall assure that the cause of the condition is determined and corrective action taken to preclude repetition. The identification of'the significant

(~}

condition adverse to' quality, the cause of the condition,

(,/

and the corrective' action taken shall be documented and reported to appropriate levels of management."

\\

Contrary to this requirement, Nonconformance Report No. 260 issued on December 23, 1974, id resolved on November 3, 1975, covering the omission of reinforcement steel in several wall areas within the auxiliary building, did not contain l

a meaningful evaluation relative to the signifance of the problem and its reportability pursuant to the requirements of 10 CFR Part 50, Paragraph 50.55e.

5.

10 CFR Part 50, Appendix B, Criterion XVII requires in part that, " Sufficient records shall be maintained to furnish evidence of activities affecting quality. The record shall include at least the following:

Operating logs and the results of reviews, inspections, tests, audits, monitoring of work performance, and materials analyses.... Inspec-tion and test records shall, as a minimum, identify the inspector or data recorder, the type of observation, the results, the acceptability, and the action taken in connection with any deficiencies noted.

Records shall be identifiable and retrievable.

p*.

O I

l l

--~

w i

l j

i j

3-dontrary to this requirement,.the results of reviews, in-j terim inspections and monitoring of reinforcement steel installations were'not documented with regard to the type of observation or the findings, nor did they_contain the action taken in connection with any deficiencies noted..

4 e

e

(

4 9

a e

s e

e S

e I

1 i