ML19329F308

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-329/76-01 & 50-330/76-01 on 760113-16
ML19329F308
Person / Time
Site: Midland
Issue date: 02/03/1976
From: Hunnicutt D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Howell S
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
Shared Package
ML19329F305 List:
References
NUDOCS 8006250388
Download: ML19329F308 (2)


See also: IR 05000329/1976001

Text

_

_ _ _

e

'

m.

.

)D

[I 9 , .; , i ;

7

.us

-r

-

l

-

,

.

..

,

f.

,

'

UNITED STATES

O

NUCLEAR REGULATORY COMMISSION

'

REGloN lli

799 ROOSEVELT ROAD

CLEN ELLYN. ILLINOIS 60137

.

FEB

3 1976

Consumers Power Company

Docket No. 50-329

ATIN: lir. Stephen H. Howell

Docket No. 50-330

Vice President

1945 West Parnall Road

Jackson, Michigan 49201

.

.

Gentlemen:

This refers to the inspection conducted by lir. Yin of this

office on January 13-16, 1976, of activities at the Ifidland

Plant Construction site authorized by NRC Construction Permits

No. CPPR-81 and No. CPPR-82 and to the discussion of our

findings with Mesaro. Cooke, and Slager and others of your

staff at the conclusion of the inspection.

A copy of our report of this inspection is enclosed and identi-

fies the areas examined during the inspection. Within these

O

areas, the inspection consisted of a celective examination of

procedures and representative records, interviews with plant

'

personnel, and observations by the inspector.

During this inspection, it was found that certain of your

activities appear to be in noncompliance with 12C requirements.

The items and reference to the pertinent requirements are

listed under Enforcement Action'in the Summary of Findings

section of the enclosed inspection report.

,

This notice is sent to you pursuart to the provisicus of

Section 2.201 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations. Section 2.201 re-

quires you to submit to this office within thirty days of

your receipt of this notice, a written statement or explana-

tion in reply, including

(1) corrective steps which have

been taken by you, and the results achieved; (2) corre tive

t'

steps which vill be taken to avoid further itens of noncom-

pliance, and (3) the date when full coupliance vill be

achieved. Such a statement or explanation should be provided

for each of the items listed,

i

l C.

.

8

8006250

.

!

  • ~

~

~

l

_,

wt

.-

._

__

.

,.

.

1

F

FEB

3 19i6

'

(

Consumers Power Company

-2-

.

In accordance with Section 2.790 of the NRC's " Rules of

Practice," Part 2, Title 10, Code of Federal Regulations, a

copy of this notice, the enclosed inspection report, and your

response to this notice will be placed in the NRC's Public

Document Room, except as follows.

If this report contains

information that you or your contractors believe to be

proprietary, you must apply la writing to this office, within

twenty days of your receipt of this notice, to withhold such

information from public disclosure. The application must

include a full statement of the reasons for which the infor-

mation is considered proprietary, and should be prepared so

that proprietary information identified in the application

is contained in an enclosure to the application.

Should you have any questions concerning this inspection, we

will be glad to discuss them with you.

Sincerely yours,

O

D. H. Hunnicutt, ChieZ

Reactor Construction and

Engineering Support Branch

.

'

'

Enclosure

.

IE Inspection Reports

.

No. 050-329/76-01

-

and No. 050-330/76-01

bec w/ encl:

PDR

'

Local PDR

NSIC

TIC

Ronald Callen, Michigan Pub'Ic

Service Co::nission

Dr. Wayne E. North

Myron M. Cherry, Chicago

_

$

O

'

.%