Forwards Insp Repts 50-329/74-01 & 50-330/74-01 on 740110-11.Noncompliance Noted
ML19329F294
Person / Time
Site: Midland
Issue date: 02/07/1974
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Howell S
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
Shared Package
ML19329F295 List:
References
NUDOCS 8006240661
Download: ML19329F294 (3)


See also: IR 05000329/1974001

Text

]I

I

\\

U NITED STATES

h.

i

ATOMIC ENERGY COMMISSION

I

e

)[g

DIRECTORATE OF REGULATORY OPERATIONS

l

REGION lli

3d

799 ROOSEVELT ROAD

mg

GLEN ELLYN ILLINOIS 60137

Q12) 85s-2840

FEB

7 1974

Consumers Power Company

Docket No. 50-329

l

ATTN: Mr. Stephen H. Howell

Docket No. 50-330

Vice President

1945 West Parnall Road

l

l

Jackson, Michigan

49201

Centlemen:

i

This letter refers to the inspection conducted by Hessrs. Vetter, Rohrbacher,

and Wil14=== of this office, and Mr. Whitosell of our Regulatory Operations

Headquarters staff, on January 10-11, 1974, of construction activities at

the Midland site authorised by AEC Construction Permits No. CPPR-81 and

CPFR-82. This also refers to the discussion of our findings with you and

other imembers of your staff at the conclusion of the inspection on

January 11, 1974.

A copy of our report of this inspection is enclosed and identifies the areas

l

amamined during the inspection. Within these areas, the inspection con-

l

sisted of a selective ====ination of procedures and representative records,

interviews with plant personnel, and observations by the inspectors.

During this inspection, it was found that certain of your activities appear

to be in violation of AEC requirements. The item and reference to the

pertinent requirements are listed under Enforcement Action in the Suussary

of Pindings Section of the enclosed inspection report. Prior to the

conclusion of the inspection, the inspectou determined that corrective

action had been taken with respect to the violation and that appropriate

measures have been taken to assure that a similar, future violation will

l

be avoided. Consequently, no reply to this letter is required, and we

have no further questions regarding this specific matter at this time.

l

Whereas the matters covered by this inspection relate to certain of the

l

commitments made by Consumers Power Company in the " Answer to Order to

l

Show Cause," it should be recognised that the information contained in

the enclosed report is not an AEC conclusien with respect to the adequacy

'

of your response. Consumera, Power Company's " Answer to Order to Show Cause"

l

is still under review by the AEC and you will be informed of the results

of this review.

l O-

THIS DOCUMENT CONTAINS

POOR QUAUTY PAGES

,8006240[Q

. -

.-.

0,

'

,,

O

Consumers Power Company

-2-

FEB

7 1974

l

In accordance with your telephone statement on January 29, 1974, to be

confirmed in a letter from you, Consumers Power Company has waived the

right to apply for withholding proprietary information from public disclosure

with respect to the enclosed report. Accordingly, a copy of the enclosed

report has been placed in the AEC's Public Document Room.

In addition,

copias of the enclosed inspection report have been mailed to Mr. H. R. Reis,

and to Mr. Myron M. Cherry.

No reply to this letter is necessary; bovover, should you have questions

concerning this inspection, we vill be glad to discuss them with you.

Sincerely yours,

James G. Keppler

Regional Director

O

Enclosures

RO Inspection Report No.

050-329/74-01 and No. 050-330/74-01

cc

Mr. A. H. Aymond, President and

Chairman of the Board, w/ enclosure

i

bec: R0 Casief, FS&EB

RO:HQ (4)

Licensing (4)

DR Central Files

RO Files

PDR

Local PDR

NSIC

DTIE

-

OGC, Beth, P-506A

Ronald Callen

J. Murray, GC (2)

Dr. Wayne E. North

Mr. Myron M. Cherry

O

!

. - -

- - - - - . .

. - - - . - - . - - - - . . - - -

n

.