ML19329F129
| ML19329F129 | |
| Person / Time | |
|---|---|
| Site: | Midland |
| Issue date: | 04/15/1974 |
| From: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Howell S CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| Shared Package | |
| ML19329F131 | List: |
| References | |
| NUDOCS 8006200660 | |
| Download: ML19329F129 (3) | |
See also: IR 05000329/1974004
Text
?
s
.
.
.
4
o
UNITED STATES
e'
ATOMIC ENERGY COMMISSION
.
DIRECTORATE OF REGULATORY OPERATIONS
,.
o
REGION lli
s*
799 ROOSEVELT ROAD
mmg
GLEN ELLYN. ILLINOIS 60137
(312)85s-2660
. _ .
'APR 15 1974
Consumers Power Company
Docket No. 50-329
ATTN: Mr. Stephen H. Howell
Docket No. 50-330
Vice President
1945 West Parnall Road
)
'
Jackson, Michigam 49201
Gentlement
This refers to the inspection conducted by Messrs. R. A. Rohrbacher
and M. W. Dickerson of this office on March 6 and 7, 1974, of activities
,
at Midland Plant construction site authorized by AEC Construction Permits
'
No. CPPR-81 and No. CPPR-82 and to the discussion of our findings with
Messrs. Keeley, Cooke, Slager and others of your staff at the conclusion
of the inspection.
A copy of our report of this inspection is enclosed and identifies the
areas a - 4aed during the inspection. Within these areas, the inspection
consisted of a selective e-f antion of procedures and representative
records, interviews with plant personnel, and observations by the inspectors.
During this inspection, it was found that certain of your activities appear
to be in violation of AEC requirements. The item and reference to the
pertinent requirements are listed under Enforcement Action in the Summary
of Findings Section of the enclosed inspection report. Prior to the con-
clusion of the inspection, the inspector determined that corrective action
had been taken with respect to this violation and that measures have been
taken to assure that a similar, future violation will be avoided. Conse-
quantly, no reply to this letter is required, and we have no further
questions regarding this matter at this time.
In accordance with Section 2.790 of the AEC's " Rules of Practice," Part 2,
Title 10 Code of Federal Regulations, a copy of this letter and the
,
enclosed inspection report will be placed in the AEC's Public Document Room.
If this report contains any information that you or your contractors believe
to be proprietary, it is necessary that you make a written application to
,
this office, within twenty days of your receipt of this letter, to withhold
'
such information from public disclosure. Any such application must include
a full statement of the reasons for which it is claimed that the information
is proprietary, and should be prepared so the proprietary information
O
THIS DOCUMENT CONTAINS
P00R QUAL.lTY PAGES
800620,0 h O
,
_
- , . - _ _ _ _ . _
.
_ _ - _ .
_ _ _ _ _ _ _ _ _ _ _ -
__
-
..
.,
. . --
Consumers Power Company
-2-
APR 1 5 1974
identified in the application is contained in a sep:. tate part of the docu-
ment. Unless we receive an application to withhold information or are
otherwise contacted within the specified time period, the written material
identified in this paragraph will be placed in the Public Document Room.
Should you have any questions concerning this inspection, we will be glad
to discuss them with you.
Sincerely yours,
i
'
James G. Keppler
Regional Director
Enclosure:
RO Inspection Rpts No.
050-329/74-04 and
No. 050-330/74-04
bec:
R0 Chief, FS&EB
RO:HQ (4)
'
Licensing (4)
4 Central Files
RO Files
Local PDR
'
DTIE
OGC, Beth, P-506A
Ronald Callen
Mr. M. Cherry
J. Murray, GC
Mr. W. E. North
O
.
_
-
-
-
.
-