ML19329F119

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-329/74-10 & 50-330/74-10 on 741002 & 03.No Noncompliance Noted
ML19329F119
Person / Time
Site: Midland
Issue date: 10/29/1974
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Howell S
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
Shared Package
ML19329F120 List:
References
NUDOCS 8006200649
Download: ML19329F119 (3)


See also: IR 05000329/1974010

Text

_

_-

--

-_

!

[,

UNITED STATES

~

. (y .

?

ATOMIC ENERGY COMMISSION

1

.

  • pQ *

DIRECTORATE OF* REGULATORY OPERATIONS

\\V

REGION 111

  1. '8ff s l'

799 ROOSEVELT ROAO

TELEPHONE

GLEN ELLYN. ILLINOIS 60137

(312) 858 2660

0CT 2 9 1974

Consseners Pcwor Campany

Docket No. 50-329

ATIN

Mr. Stephen H. Howell

Docket No. 50-330

Vice President

1945 West Parnall Road

Jackson, Michigan

49201

Gentlemen:

This refers to the inspection conducted by Messrs. Hunnicutt, Rohrbacher,

vandel and Yin of this office on October 2 and 3, 1974, of activities at

the Midland Plant construction site authorized by AEC Construction

Permits No. CPPR-81 and No. CPPR-82 and to the discussion of cur findings

with you, Messrs. Emeley, Cooks, others of your staff and representatives

of the Bechtel Corporation at the conclusion of the inspection.

A copy of our report of this inepection is enclosed and identifies the

areas ====4=ad during the inspection. Within these areas, the inspection

consisted of a selective awamination of procedures and representative

records, interviews with personnel, and observations by the inspectors.

No violations of AEC requirements were identified within the scope of

this inspection.

In accordance with Section 2.790 of the AEC's " Rules of Practice," Part

2 Title 10, Code of Pederal Regulations, a copy of this letter and the

acciosed inspection report will be pieced in the AEC's Public Document

Room. If this report conemina say information that you or your contractors

believe to be proprietary, it is necessary that you =d: . wntren

appliestion to this office, within twenty days of your receipt of this

letter, to withhold such information from public disclosure. Any such

application must include a full statement of the reasons for which it is

c1=4=ad that the information is proprietary, and should be prepared so

i

the proprietary information identified in the application is contained

j

in a separate part of the document. Unless we receive an application to

withhold information or are otherwise contacted within the specified

time period, the written meterial identified in this paragraph will be

placed in the Public Docueent Room.

O

THIS DOCUMENT CONTAINS

.

8006200

OCT 2 9 1974

.

.

'

Consumers Power Company

-2-

o.-

No reply to this letter is necessary; however, should you have say

questions concerning this inspection, we will be glad to discuss them

with you.

Sincerely yours,

James G. Keppler

Regional Director

Enclosure:

RO Inspection Rpts No.

050-329/74-10 and No.

050-330/74-10

bec: RO Chief, FS&EB

RO:HQ (4)

Licensing (4)

DR Central Files

R0 Files

PDR

Local PDR

'

NSIC

TIC

OGC, Beth, P-506A

Ronald Callen

GC (2)

Dr. Wayne E. North

Myron M. Cherry

O

-

.

.

. .

.

._

.

.