ML19329F012
| ML19329F012 | |
| Person / Time | |
|---|---|
| Site: | Midland |
| Issue date: | 11/20/1975 |
| From: | Howell S CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| To: | Knuth D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| Shared Package | |
| ML19329F013 | List: |
| References | |
| ALAB-106, HOWE-160-75, NUDOCS 8006190798 | |
| Download: ML19329F012 (1) | |
Text
?,
3
(
A CODSum8TS d'
34 POWBr (v)-
f C0mpany
- v
..,., u. u m.,,.,,,
A General Omces: 212 West Michigan Avenue, Jackson, Michigan 49201 November 20, 1975 Howe 160-75 Dr. Donald F. Knuth, Director Office of Inspection and Enforcement US Nuclear Regulatory Commission Washington, DC 20555 MIDIAND NUCLEAR PIANT - AIAB-106 MONTHLY NONCONFORMANCE REPORT FOR OCTOBER 1975 56-32.9 3g In accordance with Condition 4 of Memorandum and Order AIAB-lO6 dated March 26, 1973 and Amendment No.1 of the Midland Plant Construction Permit, enclosed are
.h ten (10) copies of the nonconformance reports for October 1975 The report con-Ad sists of copies of Bechtel Nonconformance Reports and Quality Audit Findings
{
written or closed during the month, all sheets from the Bechtel Nonconformance Report Log and Status Book which reflect open Bechtel NCR's, and Consumers Power Company Nonconformance Reports written or closed during the month. There were g
no Bechtel quality Assurance Discrepancy Reports or Menagement Corrective Action Reports written during the month of October.
CC: JEsppler, USIGtC THIS DOCUMENT CONTAINS POOR QUAllTY PAGES 7?P q
g0 0 619 0 V
j
- \\ /
p J
g f
. _.