Text
l I
's, CORSumerS h1' Power Company x
.....a
~.,.
c.n.,.i ome..: nis w.
u cmo., A.no..s.ca.on, u.cm.n 4esos. 4,.. coa. air 7ea.osso o
July 11, 1978 Howe-122-78 Mr J. G. Keppler, Regional Director Office of Inspection and Enforcement US Nuclear Regulatory Co= mission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 t
~~ ~ j MIDLAND NUCLEAR PLANT -
J UNIT NO. 1, DOCKET NO. 50-329 UNIT NO. 2, DOCKET NO. 50-330 DECAY HEAT REMOVAL PUMP RADIOGRAPHY
Reference:
- 1) Letter, S. H. Howell to J. G. Keppler, Midland Nuclear Plant Unit No.1, Docket No. 50-329, Unit No. 2, Docket No. 50-330; Decay Heat Removal Pump Radiography, Serial Hove-23-78, dated I
March 3,15n8.
- 2) Letter, S. H. Howell to J. G. Keppler, Midland Nuclear Plant Unit No.1, Docket No. 50-329, Unit No. 2, Docket No. 50-330; Decay Heat Removal Pump Radiography, Serial Hove-73-78, datet May 12, 1978.
The referenced letters were interim reports. _ This letter is also en interit report as repair work is ongoing on the "B" pump casing. All repair work vs C~ ',.
"cumpleted on casings T, Y and "D".
Thess y % -- M s vere accepted by B5M Lynchburg, and the casings were shipped to the Midland Site.
It is anticipated that all part corrective action vill be completed by the end of July. Another report, interin or final, will be sent on or before August 18, 1978 w$
CC: Dr Ernst Volgenau, USNRC (15)
Director, Office of Management Information and Program Control, USNRC (1)