o
..m l
y.,
r7 C011SumBTS
'W r POW 8f Stephen H. Howell
.g g
Vice hesident Generet off 6ces: 1945 West Parnell Road,Jeckson, MwNeon 40201
- Area Code 517 MS3 August 2, 1978 Hove-126-78 Mr J G Keppler, Regional Director Office of Inspection and Enforcement US Nuclear Regulatory Co==ission Region III
(
799 Roosevelt Road Glen Ellyn, IL 60137 MIDLAND NUCLEAR PLANT UNIT NO 1, DOCKET No 50-329
{
UNIT NO 2, DOCKET No 50-330 DECAY HEAT REMOVAL PUMP RADIOGRAPHY g.
Reference:
- 1) Letter, S H Howell to J G Keppler, Midland Nuclear Plant -
Unit No 1, Docket No 50-329; Unit No 2, Docket No 50-330; Decay Heat Removal Pu=p Radiography; Serial Hove-23-78, u
G dated March 3, 1978.
db en-
- 2) Letter, S E Howell to J G Keppler, Midland Nuclear Plant -
E.
Unit No 1, Docket No 50-329; Unit No 2, Docket No 50-330; Decay Heat Removal Pump Radiography; Serial Hove-78-78, dated May 12, 1978.
- 3) Letter, S H Howell to J G Keppler, Midland Nuclear Plant -
ei Unit No 1, Docket No 50-329; Unit No 2, Docket No 50-330; Decay Heat Removal Pump Radiography; Serial Hove-122-78,
^
dated July 11, 1978.
I.
The referenced letters were interim 50.55 (e) reports. This letter is the final report in that the four decay heat removal pump casings and covers are in conformance with their design requirements and all required corrective actions for the reportable condition have bean co=pleted. A " statement of conformance," signed by both the ASME Authorized Inspection Agency and B&W 11, 1978, has been received by Consumers Power Company.
Canada Ltd, dated July 4
The initial 50.55 (e) report related to the original radiography which was not in conformance with Code requirements. This radiography had been performed by Vis-U-Bay, a subcontractor to B&W Canada Ltd. The re-radiography was performed by Vis-U-Ray for the "D" pu=p casing only and by 3&W Canada Ltd for the "A, "B" and"C" casings. This final set of radiographs was reviewed by both B&W Lychburg and Consumers Power Company and the film was determined to be acceptable by both.
na The result of this radiography was that surface rework (grinding) was required U978
' " r.
8006100 3
~~
2 a
Hov:-126-78 on the "A" and "D" casings and veld repairs were required on the "B" and "C" casings.
Either B&W Lynchburg or Consumers Power Company or both vitnessed the repairs and the repair inspections required for the four A system audit by B&W Lynchburg (with CPCo participation) was con-pumps.
ducted which focused on the repair activities for the pumps. The above activities allov us to conclude that B&W Canada Ltd eliminated the problems in their quality program which allowed the nonconforming radiographs to be accepted on the original equipment delivery.
B&W Canada Ltd had their ASME Code sta=p extended to December 31, 1978 to complete existing orders.
CC: Dr E Volgenau, USNRC (15)