ML19329E414
| ML19329E414 | |
| Person / Time | |
|---|---|
| Site: | Midland |
| Issue date: | 05/31/1974 |
| From: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Howell S CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| References | |
| NUDOCS 8006120746 | |
| Download: ML19329E414 (1) | |
Text
V h..,
g#f g
UNITED STATES eh.
ATOMIC ENERGY COMMISSION 1
- 1,'o%rgs o4 "
f Qg DIRECTOR ATE OF REGULATORY OPERATIONS
/
REGION til 799 ROOSEVELT ROAD g
GLEN ELLYN. ILLINotS 60137 (312) ess-2sso MAY 3 1 1974 Consumers Power Company Docket No. 50-329 ATTN Mr. Stephen H. Howell Docket No. 50-330 Vice President 1945 West Parnall Road Jackson, Michigan 49201 Gene 1====
The enclosed DRO Bulletin No. 74-6 " Defective Westinghouse Type W-2 Control Switch Camponent" is sent to prrvide you with infermation obr = M during recent 10 inspections. This information may Save applisability at your familities. The actica requested on your part is identified in the anelased Bulletin.
If you have any questions on the contents of this Bulletin, pleas 6 do not hesitate to contact us.
Sincerely, James G. Kappler
)
Regional Director 1
Enclosures DRO Bulletia No. 74-6 DR Central Files RO Files PDR Local PDR
'ilHIS DOCUMENT CONTAINS OGC, Bath, P-506A M P0OR QUALITY PAGES Ronald Callen J. Murray, GC, (2)
Dr. Wayne E. North Mr. Myron M. Cherry 8006 120 7 g
'd
j h
. ~,
May 31, 1974 DRO Bulletin No. 74-6 DEFECTIVE WESTINGHOUSE TYPE W-2 CONTROL SWITCH COMPONDTr Recent inspection findings indicate a possible safety problem may exist in plants employing Westinghouse Type W-2 control switches. The information is as follows:
- A.
Description of Circumstances Plant A By notification from Westinghouse Nuclear Service Division, dated February 8, 1973, the licensee was informed of a defect in certain Westinghouse Type W-2 control switches. Repair kits were ordered to replace the defective component. Inspection of the replacement parts, Prior to installation, revealed 8 of 14 pull levers (metal di'ses with expansion pins inserted) to be cracked. None of the replacements parts were installed.
Plant B i
Following the same notification from Westinghouse as above, repair kits were ordered to replace the defective component. Replacement parts were installed in forty switches. One pull lever was found cracked during i
'J installation and discarded. Two spare repair kits were retained. At l'
the request of the Atomic Energy Commission the pull levers in these two spare kits were inspected. One of the two was found to be cracked.
B.
Action Requested 1.
If these switches are used in safety systems in your plant please inform this office in writing within 30 days of receipt of this Bulletin, of the extent of such use and the actions you plan to take or have taken to correct the problem with the original W-2 switches and to assure that repair parts are not defective. If corrective actions have not been completed, it is requested that your scheduled date of completion be provided.
2.
If this matter does not apply to your plant, a negative report is requested.