Interim Deficiency Rept Re Cracked Weld Between Stiffener & Welding Ring of Pwesonnel Lock.Welds Ground Out and Gap Mapped.Drawings Encl
ML19329E292
Person / Time
Site: Midland
Issue date: 06/30/1978
From: Howell S
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
Shared Package
ML19329E281 List:
References
HOWE-106-78, NUDOCS 8006120594
Download: ML19329E292 (8)


Text

.. -

I CORSilmCW POWCf I

Stephen H. Howell Camp q

~.,,.......

C eneral offices 212 West M.cnigen Avenue. Jack son u.cm. gen 4 9 201 June 30, 1978 Hove-106-78 Mr J. G. Keppler, Regional Director Office of Inspection end Enforcement Region III US Nuclear Regulatory Commission 7E9 Roosevelt Road Olen Ellyn, IL 60137 MIDLA!!D NUCLEAR PLANT -

UNIT NO. 1, DOCYff NO. 50-329 U';IT NO. 2, DOCKET No. 50-330 CONTAIIDENT BUILDING PERSONNEL AIR LOCKS Reference 1) Letter, S. H. Hovell to J. G. Keppler, Midland Nuclear Plant -

Unit No. 1, Docket No. 50-329; Unit No. 2, Docket No. 50-330; Contairment Building Personnel Air Locks, dated March 3, 1978.

2) Letter, S. H. Howell to J. G. Keppler, Midland Fuelear Plant -

Unit No. 1, Docket No. 50-329; Unit No. 2, Docket No. 50-330; Containcent Building Personnel Air Locks, dated April 19, 1978.

3) Letter, S. H. Howell to J. G. Keppler, Midland Nucleer Plent -

Unit No. 1, Docket No. 50-329; Unit No. 2, Docket No. 50-330; Contaircent Building Personnel Air Locks, deted May 26, 1978.

The referenced letters and this letter are interim reports. Astachrents 1 and 2 provide the status of the corrective action measures being taken.

Another report, either interim or final, vill be sent on er before August L, 1978.

m t%

L (

8006120 bY b,..L -

Attachments:

1) Interim Report ph for MCAR-20, dated June 1,1978, " Cracked Weld Between Stiffener and Welding Ring of Personnel Lock"
2) Interic Report p5 for MCAR-20, dated June 15, 1978, " Cracked Weld Between Stiffener and Welding Ring of Personnel Lock" CC: Dr Ernst Volgenau, USNRC (15)

Director, Office of Management Infor=ation and Program Control, USNRC (1) t

Att. to LLC-@@7/6

. Attachment 1 Bechtel Aswc. tes Professional C0,porat. ion uove_106-7e ia 777 East Eisenhower Parkway Ann Arbor. l.Schigan w

unnea,,ss.P.O. Bos 1000, Ann Arbor. %chesan 48106

SUBJECT:

MCAR #20 (insued 2/3 /78)

\\

Cracked weld between stiffener and j

j welding ring of personnel lock i

INTERIM REPORT #4 DATE:

June 1, 1978 PROJECT:

Consumers Power Company Midland Plant Units 1 & 2 Bechtel Job 7220 Introduction This report is submitted to advise of the interim status and course of action required pursuant to MCAR #20 and NCR 1185.

The cracked weld repair procedure has been finalized by U.J. Woolley Company upon review by Bechtcl.

To complete the repair procedure, the cracked stiffener repair details being developed by Woolley is

.o be

, incorporated.

The final report is scheduled for June 15, 1978.

Deficiency Interim Report #1 dated February 17, 1978, reported that inprocess visual inspection revealed that a total of nine vendor welds b'etween the stiffeners and the welding ring were cracked. Magnetic particle _ testing was performed on these welds by Bechtel Construction, and it was determined that the weld for the horizontal stiffener of the personnel lock in Unit

, 2 das not cracked as originally reported (reference Figure 2 of Interim Report #1).

The testing also verified that the remaining eight reportedly crackhd vendor velds had failed.

NCR 1185 reported that one stiffener in the personnel lock of reactor building Unit'l had fractured.

Figure 1 shows the location of the fractured stiffener.

Safety Implications The safety implications have been discussed in Interim Report #2, dated March 31, 1978.

Corrective Action The documentation for the weld and weld test procedures used for the subject fillet welds has been reviewed by project engineering.

It has been determined that groove weld procedures, reviewed and approved by project engineering, were substituted for fillet veld procedures.

This l

g.

E:

TEJ JAtt. to BLC-6076 HCAR 020 Page 2.

June 1, 1978 substitution of procedures is permitted under Section IX, Subsection QW-202.2 of the 1974 ASME Code.

The nondestructive examination technique and the acceptance criteria used for these welds were also found to be sc'ceptable.

The fillet velds between the horizontal stif feners and the weld ring have been inspected by magnetic particle examination, and no cracked weld was discovered.

The cracked welds have been ground out and the gap between the stiffeners and the weld ring has been mapped.

This information was transmitted to 11, 1978.

W. J. Woolley Company is detailing 4

W. J. Woolley Company on May the splice plates required at the locations where the gap exceeds 3/8-The details of the splice plates will be incorporated into the inch.

veld repair procedure.

The fractured stiffener of the personnel lock in reactor building Unit 1 The defect in the stiffener has been inspected by ultrasonic examination.

is as shown in Detail 1.

A repair procedure for the stiffener is being developed by W. J. Woolley Company and will be incorporated into the personnel lock repair procedure.

  1. '+'

Subnitted by:

i 3- ht[/..-d;,4,,_.'.

Approved by:

Co'ncurrence by:

4 RB/jp 5/18/5 li 9

e 9

e S

e 8"*

. ;. m.s e ce e emeee

o. m. m se - op-.e me

b Att, to ELC-6076 NCAR-20 1hTEP.1M REPORT 4

[g G 8(

June 1; 1978

- ~

f k

~

e I

STIFFENER 11 I .

W N.

ll I

I Il

~

d 2

i Tl y

~

=

j SEE DETAIL 1

BE FRACTi>RE PETAIL REACTOR BLDG.#1

~

~

~

GAPS BETWEEN THE STIFFENERS AND THE WELD RING e

FIGURE 1 l

1 m

+-

Att, to BtC-6076 lfCAR-20 INTERIM FIPORT 4

.funi 1, 1978 W

-i>

1

/ A

.s d'

~

PLAN 7

=e

/

/

+i

-t s

x, N

c SECTION J

- A 1

t_,

v

- ~.. - - - ~ ~ ~ - -

Attcchment to BLC

'22 Attschment 2

.e Bechtel Associates Professional Corporation Hm-106-78

SUBJECT:

MCAR #20 (Issued 2/1/78)

Cracked weld between stiffener and welding ring of personnel lock INTERIM REPORT #5, DATE:

June 15, 1978 PROJECT:

Consumers Power Company Midland Plant Units 1 & 2 Bechtel Job 7220 Introduction This report is submitted to advise of the interim status and course of action required pursuant to MCAR #20 and NCR 1185.-

The cause of the cracked fillet welds discussed in the following section led to concern as to the adequacy of the remaining welds on'the personnel locks. The personnel locks in Units 1 & 2 reactor buildings were examined by Woolley and Bechtel project engineering on June 12, 1978, for proper size fillet welds.

It was determined that numerous fillet welds were undersized, varying between 1/8 and 1/32 inch short of their specified dimensions. To complete the repair procedure for the personnel locks will require additional investigation of the undersize welds by Woolley and Bechtel project engineering.

The final report is rescheduled for September 15, 1978.

,cause The cause of the cracked fillet welds has been determined by Woolley and Bechtel to have been excessive fit-up gap and insufficient dimensions of the fillet welds which were undersized when' they were not increased to compen' sate for the gap. The cracks developed when these welds were stressed during welding between the weld collar and the reactor building penetration sleeve.

Deficiency Interim Report #4, dated June 1, 1978, reported on the deficiency as described on NCR 1185. Further investigation of the welds on the personnel locks determined that other fillet welds are undersized.

The extent of the undersized welds will be determined when the personnel locks are reinspected by Bechtel Quality Control.

e O

e r

Attcchment to BLC 5122 Bechtel Associates Professional Corporation MCAR #20 INTERIM REPORT 5 Page 2 June 15, 1978 Safety Implications y,J. Woolley has been requested to evaluate the integrity of the personnel locks taking into consideration the deficient welding.

This evaluation will be performed after Bechtel Quality Control has determined the extent of the deficient velds.

Corrective Action Bechtel Quality Control has been requested to reinspect the personnel locks and their documentation to determine the extent of the deficiencies, including the undersize welds. Their response has been requested by June 28, 1978.

Woolley has developed a procedure for repairing the cracked stif fener described in Interim Report #4. The repair procedure has been incorporated into the personnel' lock weld repair procedure.

The procedure is being reviewed by project engineering.

Submitted by:

f.

Reviewed by:

p,A/M Approved by: [M h

Concurrence by:

RB/jp 6/13/2 e

l l

4 e

4 o

(

.[ #7 O

D REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS $

DISTR 1DUTION FOR INCOMING t1ATERI AL _

50--329'330

!YC: KEPPLER J G ORG: HOMELL $ H DOCDATE: 06/30/78 NRC CONSUMERS PWR DATE RCVD: 07/05/78 LETTER NOTARIZED: NO COPIES RECEIVED

'.OC TYPE :

.:HJECT-LTR 1 ENCL O

!!JTE.F:It1 F.EPORT STATING THAT FINAL DESIGN MODIFICATIONS HAVE NOT BEEN APPROVED y CONSUMER 9. POWER COf1PANY.

-1 AMT NA!1E: MIDLAND -- UNIT 1 REVIENER INITIAL:

XRS r1IDLAND - UNIT 2 DISTRIEUTER INITIAL:gb

        • +vo***>;cccco DISTRIBUTION OF THIS MATERIAL I S A S F O L LO W S * * * * + * + + *
  • t+ * * * + * +-

T1ON DEFJCIE*1CY REPOPT ( 1 ^CFR' 0. ' 5E l

~~~~:...CN COD; t.,, 7 FOP ACTION:

ASST DIR VASSALLOnLTR ONLY(1)

ER CHIEF LWRtt4 BCa*LTR ONLY(1)

PROJ-t1** ' 'OOD F*LTR ONLY ( 1 )

LIC ASST LURtt4 f.A**LTR ONLY(1)

I NT ER Nr.!.

.G FILF r.TR ONLY(1)

NRC PDR**LTR ONI.Y(1)

_._ a-FL1 R ONLY ( 2 )

OELDwLTR ONLY(1)

GOSSICK L STAFF **LTR ONLY(1)

MIPCet-LTR ONLY( 1)

DIRECTOR DPMwLTR ONLY(1)

DEPUTY DIR DPMnLTR ONLY(1)

OAE**LTR ONLY(1)

DIRECTOR DSS **LTR ONLY(1)

AD FOR ENGit*LTR ONLY(1)

AD FOR REAC SFTY-s+LTR ONLY t i )

A t.: FOR FLJ.t. i

. OTEMS,*..TR ONL:- n; c or. OYS 5.- FROJv&L7R ONLY'.13

?D44LTR ONLY'.1)

F. 5 e;--RI T/IE^-?LTR ONLY ( 1 )

FI RD DREHER/IE*PLTR ONL Y(11 L. ' 7 Eh N. '.L :

LPUR'S MIDLAND, 11I44tLTR ONLY ( 1 )

TIC **l.TR ONL Y( 1 )

N9ICw LTR ONLY(j

ACRS CAT A**LTR ON!.Y ( 16) r.. I EU l l t!! !.

LTR /11 ENCL 0

' ' "'J T P Oi. N F.N :

? ? ' 9P

=',

+.tr

(

14 J a -v.

F

..:!.J M.: F ' t a

. :1.'F a

} l l,E

[- [ j D 5

  • x+*4o-*

? -> -> -? 4 - - - ; ^ >- 4 -$ 4 6 2J- -S -;

e

(\\

-a l C f F A Q R FGill ATORY COMMISSIEN ***

PAGF : l linD a

vw MASTER ROSTfR vw[. 500 l

000 PUBLICATIONS IVISION I

- ---- D ISTR IBUT IGN CODE S 1-17 ---

--I I TL E I----------

D I S T R I B U T I ON QTY 1-1 7 - --

-I ITY ST.. ZIP I -- -

-- DISTRIBUTION CODES 18 -I IA P. sYPt 1

U IS I R TBUTICfrQTY~

18 -

.3 4 -- '-

I - --

I----

DISTRIBUTIGN CODES 3 5 - 5 0 --

r-- I I

a c o e co o * * * * * ** * * * * * * * * * * * * * * ** * * * * * * * * * * * *

  • D I S TR I S U T I O N QTY 3 5 - 5 0 ---

=-I

          • =c***************************t****, _ _

CW SN SM SP SO SA SG SR ST SF SE 1

1 1

1 1

1 1

1 1

1 1

DU...S T OPJ TX 77042 ST SA SG 1

1 1

JUSTCN TX 77046 SN SR SF SE SM SP ST SO SA SG IBRKRTEN 1

1 1

1 1

1 1

1 1

1

~

CUSTON TX 77052 x

!DUSTRI AL HYGIENIST 1

USTCT

~--

IX UDdz NB 1

USTON TX 77052 4

5N 5R 5F 5E SM-57 5T 5 0- 5T 5G

~

1 1

1 1

1 1

1 1

1 1

USTCN TX 77055 CW L

~JSTON TX 77055 SN SR SF SF SM SP ST SO SA SG NRNE Y iT LAW l

1 1

1 1

1 1

1 1

1

5 T C',

I X-~~ 77 3 5 7

~ ~ - - ~

'LG3ICAL SCIENCES DEPT SE SM SG SAGER ECOLOGICAL SCIENCES 1

1 1

. J S_T O'J TX 77058

>N STSE-57 si 50 -

~~

1 1

1 1

1 1

STON TX 77058 C.N

.';iCQ TX 77058 a