ML19329E281

From kanterella
Jump to navigation Jump to search
Interim Deficiency Rept Re Reactor Coolant Pump Motor Flanges.B&W Final Design Mods,Substituting Studs & Nuts for Cap Screws,Requires Three to Six Wks for Util Review & Approval.Interim or Final Rept Will Be Submitted by 780831
Date released: 12/09/2019 Download: ML19329E281


Interim Deficiency Rept Re Cracked Weld Between Stiffener & Welding Ring of Pwesonnel Lock.Welds Ground Out and Gap Mapped.Drawings Encl
ML19329E292
Person / Time
Site: Midland
Issue date: 06/30/1978
From: Howell S
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
References
Download: ML19329E292 (8)
Interim Deficiency Rept Re Seismic Cable Tray Supports Discrepancies.Weld Size Deviations Reviewed & Found Acceptable.Weld Support Connection Field Insp Evaluation Results Will Be Submitted by 780701
ML19329E288
Person / Time
Site: Midland
Issue date: 06/30/1978
From: Howell S
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
References
Download: ML19329E288 (7)
Interim Deficiency Rept Re Reactor Coolant Pump Motor Flanges.B&W Final Design Mods,Substituting Studs & Nuts for Cap Screws,Requires Three to Six Wks for Util Review & Approval.Interim or Final Rept Will Be Submitted by 780831
ML19329E280
Person / Time
Site: Midland
Issue date: 06/30/1978
From: Howell S
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
References
Download: ML19329E280 (1)