ML19329D740
| ML19329D740 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 05/11/1979 |
| From: | Reid R Office of Nuclear Reactor Regulation |
| To: | Stewart W FLORIDA POWER CORP. |
| References | |
| NUDOCS 8003170680 | |
| Download: ML19329D740 (2) | |
Text
_
o l
UNITED STATES NUCLEAR REGULATORY CCMMISslON 3i
{',..( T ), $
WASHINGTON, D. C. 20555
- O '[j,8 May 11, 1979
,gu Docket No. 50-302 Mr. W. P. Stewart Director, Power Production Florida Power Corporation P. O. Box 14042, Mail Stop C-4 St. Petersburg, Florida 33733
Dear Mr. Stewart:
Your letter of March 29, 1979 provides details of a proposed modification to the reactor coolant flow sensing system at Crystal River 3.
This modification was proposed pursuant to paragraph 2.C.(7) of your license (DPR-72). We have reviewed your proposed modification and find it acceptable. Our safety evaluation is enclosed.
As per paragraph 2.C.(7) of your license this modification must be installed prior to restart from your current refueling outage.
Sincerely.
Af.: 'h N ',. Q)N'< v'/
~m fZ
( g'obert W. Reid, dhief R
Operating Reactors Branch #4 Division of Operating Reactors
Enclosure:
~
Safety Evaluation cc w/erclosure:
See next page i
1 I
8 0 0317 0 hC D
t Florida Power Corporation cc: fir. S. A. Brandimore Vice Presicent and General Counsel P. O. Box 14042 St. Petersburg, Florida 33733
' Mr. Robert B. Borsum Babcock & Wilcox Nuclear Power Generation Division Suite 420, 7735 Old Georgetown Road Bethesda, Maryland 20014 Crystal River Public Library Crystal River, Florida 32629 Mr. Jack Shreve Office of the Public Counsel Room 4, Holland Building Tallahassee, Florida 32304 4
e e.
---m m
---