Notifies NRC of Actions Taken to Correct Design Deficiency Reported on 760621 Re Hydraulic Snubber Sight Gage Leakage. Sightgages Will Be Installed Beginning Oct 1976
ML19329D557
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 07/02/1976
From: Rodgers J
FLORIDA POWER CORP.
To: Moseley N
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
NUDOCS 8003160152
Download: ML19329D557 (1)


Text

  • Q, vaAmek,./

k

.. j y/

Florida Power C o n e o n a T so se July 2, 1976 Mr. Norman C. Moseley, U. S. Nuclear Regulatory Commission Region II, Suite 818 230 Peachtree Street NW Atlanta, GA 30303

Subject:

Crystal River Unit #3 Docket 50-302

Dear Mr. Moseley:

On June 21 we forwarded to your Mr. Knuth a written verification of a 50.55(e) design deficiency involving hydraulic snubber sight gauge leakage.

This notice offered 3 possible fixes of which #1 and #2 were definitive.

On June 30, 1976, Florida Power elected to go for what we feel is the more permanent and acceptable solution as proposed by'its supplier Power Piping Company.

This solution is #1 - replacement of sightgages.

The present schedule is to start receiving the replacement sightgages in October.

Installation will be performed as expediously as possible in conjunction with other scheduled plant startup work.

During the replacement process our required surveillance program will be functioning so we have not scheduled a date for completion of the changeover.

We can furnish you with the new design in approximately 2 months as a final report on the fix.

Yours very truly,

?

J. g. Rodgers T

Assistant Vice President JTR/nm 80031 oo ist 5 l

.--