Responds to V Evans 700921 & 1028 Ltrs Re Concern About Need for Increased Electricity as Justification for pre-CP Work.Existence of Public Need for Facility Generating Capacity by Dec 1974 Indicated by FPC
ML19329D395
Person / Time
Site: Davis Besse 
Issue date: 11/16/1970
From: Morris P
US ATOMIC ENERGY COMMISSION (AEC)
To: Evans V
LIVING IN A FINER ENVIRONMENT
Shared Package
ML19329D396 List:
References
NUDOCS 8003050984
Download: ML19329D395 (5)


Text

-.

-bO</W m

'()- 3 'l d NOV 1 s 1970 Miss Vicki Evans Co-Chairman, LIFE Box 15, University Hall Bowling Creen State University Bowling Creen, Ohio 43202

Dear Miss Evans:

This refers to your letters dated September 21, 1970 and October 28, 1970 to the Director of Regulation and nyself, regarding your concerns on the need for increased electricity generating capacity in nortnwestern Ohio as a justification for an execption granted to The Toledo Edison Company and The Cleveland Electric Illuminating Company (the applicants) to allow certain pre-construction permit work to be conducted at the Davis-Besse site. We had delayed answering your letter of September 21, 1970, pending receipt of coments from the Federal Power Commission (FPC) which we believed would provide the necessary infornation concerning generating capacity, reserves and load predictions in your area. This information has been received by letter dated Noven.ber 3,1970, from the FPC and a copy is enclosed for your information.

The applicants requested an exemption by letter dated June 4,1970, to permit construction of certain portions of the Davis-Besse Nuclear Power Station prior to issuance of a construction permit by the AEC to ncet a scheduled plant operational date of December 1974. To support th e justification for an exemption request, the applicants submitted the enclosed letter dated August 12, 1970, providing additional information to-support the basis for establishment of the public need for the Davis-Besse plant generating capacity to meet the predicted required electricity load for December 1074.

The Regulatory Staff discussed with the Federal Power Comission the exemption request, and the Federal Power Cornission indicated that there is -a public need for the Davis-Besse generating capacity to be operational by December 1974. After completion of our review of the exemption request, the exemption was granted on September 10, 1970, to allow construction of.

certain foundations, walls, and floors of the shield building and auxiliary building up to elevation 583 feet, 6 inches (ground level).

I am enclosing a copy of a letter, dated October 14, 1970, from the State of Ohio Department of Health which contain cornents on the public need for the Davis-Besse Nuclear Power Station generating capacity.

i OFFICE >

" - " ~ '

SURNAME >

~"'""

~ ' " " " " " ' " " "

DATE>

r-.;. c_

~ -

=v -r C=L 22 22' 2= CC"
  1. 2

""'""#2 Fbrm A EC-338 (Rev. 9-53) us sevtpsutwi raiwrencorrect.1ess-o s6 498 8008050 k M

r t;0's 1 6 N'

fiss Vicki' Evans.

A copy of the

-ice c' hearing on application for a construction pernit which was pul'... ' d in the Federal Eerister is encioned. I hope the enclosures v 11 i..arify the basis on which our action was taken to authorize an exemption to The Toledo Edinon Company and The Cleveland Electric Illuniinating Company.

Sincerely, Original Signed by Peter A. Morris Peter A. Morris, Director Division of Reactor Licensing

Enclosures:

1.

Ltr to H. L. Price fr Toledo Edison dtd August 12, 1970 2.

Ltr to H. L. Price fr Federal Power Cornission dtd "ovember 3 1970 3.

Ltr to H. L. Price fr State of Ohio Dept. of Health dtd October 14, 1970 4.

Teotice of_ Ecaring Distribution:

PDR (50-346)

' Docket (50-346)

DR Reading DRL Reading-BWR-2 File H. L. Price C. L. Henderson P. A. Morris R. S. Boyd R. L. Tedesco J.~ Cook G. Ertter V. Wilson OCR (2)

J.'Felton R. Powell H. Steele (2)

SEE ATTACHED FOR OTHER CONCURRENCES CRESS orncr >

DRL:BWR-1__

l)RL....

.... DGC........

... DR-.

.... D RL..-.... -.~.-- DRL.

gl' RPowe11:th jf. g T13 R7-8 $URNAMr > RLTedesco-...... JtSBoyd...

CLHenderson-RFSchroeder--- P AMo r ris ----

l t l-04rc > 11/10/70........... 11/m../70=...

cll/ 170= = m il/= /70a...

11/=/30 -

-11/w=/70=

tbrm AEC.3t M (Rev. 9-53) u.s scvr.nwt*T raintiss avict.1me-o 364-ses

Iliss Vicki Evans Q

.w

/

f A opy of the notice of hearing on applicationj or a construction per t whi i was published in the rederal Register is, enclosed.

I)opeth encio res will clarify ym ca.ectn regardrng our action,., taken t authori. an exeruption to The Toledo Edison Cor.pany and The Cle land Electric 11uminating Company.

Sincerely,

/

Peter A. Mort'is, Director Division of Reactor Licensing i

Enclosures:

1.

Ltr to H. L. Price fr Tol do Edison dtd August 12, 19 2.

Ltr to H. L. Price fr Fedcra Power Connission dtd Novemb 3,

1970

/

3.

Ltr to H. L. Price fr State of Ohio Dept. of Health drii October 14, 1970 4.

Notice of Hearing Dis tribution:

PDR (50-346)

Docket (50-346)

DR Reading DRL Reading BWi-2 Fil H. L. P ce C. L.

enderson P.

Morris R

S. Boyd L. Tedesco J. Cook G. Ertter V. Wilson OCR (2)

J. Felton R. Powell H. Steele (2)

~

/l CRESS 31 wel /3 //,,

.O 0"-.

.. [. DR.........

_D

.. DEL..........

omet >

RL:BWR-2..

3 1

p T13 R7-8sunuur> KLTed

'o. 7- -.3S Bo

- - - - - -. -.-- qculenderson.,FSchyoeder-. PAMorris.. --.

11/ /70 om > kb.h/

...)... b.h...... / 70,, _ $1//o/70 jll/ /70

,Jll/f,/70 norm a ec.am w.. A ~~,

u w e m m

=mmv=-o-a.--

6 4

4 h.'

g y

e n,w-s

=m

'e w

{

t I h9

,I.

s T

,Cu.C E l f.-.

_. ' u -- i U!..

'.'L

(! IL L

  • C L L.:

I'

... U n.r c.t. m..

4 4 -

1 p

b

.p E.I I

  • 8 F-58 a

g 4

3h 2e tINO -

  • 2+

1

,.1

[f3 =i I.

Y

  • 9.

..J. u.' C - a l'

.O -1 7

~

, m; _.10.

  • . 0.

L L ;i

+

t yy' '.'.

l n

1. 2.

1 ;JLL i % 8...

. o +.-,

g i

I

I")-

.._ C_U. --

!L:

a4 g

s

, 59 m

.6 4e.*-

P

  • I 1

..___..k*._'--

j,..J.'

{

.'s..LJn.'l,4 3

.s p

+ i,.s u.:

8

    • ,s..i

.. ~. * ~ -

,g.,,

..1.. ).-

i l

i

". q O* ? --i-

~ - - - - --'

ti t. L e '. r.L':.

.-. ; P. m' f i s.-

b.LCL - G L.

i

-_-_-_T/'s.

--__t. _ - -... - - _ -

0

,/

g.

/ a,

/.

u {-

t E

/.

s

- /j "

u

/

0U.D *' ' *>

F.-f

[

[

u2. m x a ncyer m ca rl, AIL canincl. Pa.uti F.

-eoou v..,

a.

9 4'

9 O

=

0 9

S W.h 4

9 9

e m

B d

e e

v p-~

b S

j 9

5 6

5, D

D 1

s, L

Q*

~

e.

?

%9

, O<

+ *e 4

s

' n e'

>l

',e.-

eIg e.

p g

s 4

4.

p p

6

.-I*-

g

,9

.s 4

  • 5

.b g

4 8

.N i

,.v

/t s

. \\,.

)' -

s

'f e

s O

s I

t s

e k,

e

%"J' a

. ~.,

i:

8 9'f P- %

,y

?.

g q;.) y,

  • .1,,'
  • /

a4 4

=

I

.\\.

ACT60N CowitEliOH DEADtlNE

_,__.-__,2___

C L NUVEEA 2883 raog. -

Vicki Lyc a C""'"'

Co-Chairen, t,;re

- -INFORMATIONAL COPY DISTRIBUTION Ecaeling Crean State ibk"> W#

l ACTION FROCESSING DATES ADNS COM D

Adnowledged_

Chairmon RPrice Interi R port t

II O,

t finot O. I ',

REMARKS

  • II

@ Original O coar O Other DESCRIPTION To11cypt up on her Itr of 9/21/70 requesting info ce the tica teed 4or electricity which caused a special ecnstruc percit to be issued to Tolede Edisoc ca 9/11/70 controlled Iry deg. Itail Room te Tedesco for actien)(9/21 Itr to E RESPO!!SE DATED 11/16/70 DATE REFERRED TO 11/4/70 T',

F.crris f/actica Cyot Rendersea FN

$* s>346)

/) A >

  1. r 6p4 *"~

7 b

vore. Asime v/s, form HQ-32 (7-60 DIRECTOR OF REGULATION U.S.A*"

COMMUNICATIONS CONTROL

_. q k

D g $3%h o

_