b
UNITEo STATES
,
.
NUCLEAR REGULATORY COMML ..ON
'
!
REGION I
638 PARK AVENUC
KING OF PRUSSI A. PENNSYLVANI A 1940G
AUG 6
1975
Baltimore Gas and Electric Company
License No. DPR-53
Attention:
Mr. A. E. Lundvall, Jr.
Inspection No. 75-17
Vice President, Supply
Docket No. 50-317
Cas and Electric Building
Charles Center
P,altimore MD 21203
,
Gentlemen:
This refers to the inspection conducted by Mr. R. J. Meyer of this
office on July 1-2, 1975 at Calvert Cliffs 1 of activities authorized by
NRC License No. DPR-53 and to the discussions of our findings held by
Mr. Meyer with Mr. Douglass and Mr. Tiernan of your staff at the con-
clusion of the inspection.
The area examined during this inspection was limited to a review of the
circumstances relating to the unplanned release of radioactive gases on
July 1, 1975. Within this area, the inspection consisted of selective
examinations of procedures and representative records, interviews with
personnel, measurements made by the inspcetor, and observations by the
inspector.
,
Within the scope of this inspection, no items of noncompliance were
observed.
With respect to the air balance problems identified by our inspector and
as discussed with Mr. Douglass at the conclusion of the inspection on
July 2, 1975, it is our understanding that a program to evaluate and
correct these pr6blems will be conducted.
It is further understood that
this program is tentatively scheduled to be completed by August 1, 1975.
'
In accordance with Section 2.790 of the NRC's " Rules of Practice",
Part 2, Title 10, Code of Federal Regulations, a copy of this
letter and the enclosed inspection report will be placed in the NRC's
Public Document Room.
If this report contains any information that you
(or your contractor) believe to be proprietary, it is necessary that you
make a written application within 20 days to this office to withhold
I
such information from public disclosure. Any such application must
include a full statement of the reasons on the basis of which it is
claimed that the information is proprietary, and should be prepared so
that proprietary information identified in the application is contained
,
in a separate part of the document.
If we do not hear from you in this
4
4otuno4
9
$
i
9
y {0f c'. [' , 3.
Enclos,ure 3
l
%
\\
p
Attachment 1
l
9L
4'+
s
076 19 &
800219070$
_
_ _ _ -_
- . .
_ _.
-
--
--
__.
. . .
.
,'
-
-
"
2--
regard within the specified per'
ac report will be placed in the
Public Document Room.
No reply to this letter is required; however, should you have any
questior.s concerning this inspection, we will be pleased to discuss
them with you.
4
Sincerely,
-<:N[' wf
Eaul R. Nelson, Chief
Radiological and Environmental
Protection Branch
Enclosure:
-
IE:1 Inspection Report No. 50-317/75-17
cc:
R. W. Davies, Manager, Quality Assurance
R. M. Douglass, Chief Engineer
i
W. Gibson, Supervisor Operational QA